ANSI ASME CSD-1 INTERPRETATIONS-2011 Interpretations to CSD-1 Controls and Safety Devices for Automatically Fired Boilers (Includes Interpretations Through Volume 15).pdf
《ANSI ASME CSD-1 INTERPRETATIONS-2011 Interpretations to CSD-1 Controls and Safety Devices for Automatically Fired Boilers (Includes Interpretations Through Volume 15).pdf》由会员分享,可在线阅读,更多相关《ANSI ASME CSD-1 INTERPRETATIONS-2011 Interpretations to CSD-1 Controls and Safety Devices for Automatically Fired Boilers (Includes Interpretations Through Volume 15).pdf(78页珍藏版)》请在麦多课文档分享上搜索。
1、ASME CSD-1 INTERPRETATIONSASME CSD-1INTERPRETATIONS VOLUME 15Replies to Technical InquiriesJanuary 2009 Through December 2011FOREWORDThis publication includes written replies issued in the year indicated by the secretary, speakingfor the ASME CSDAFB Committee, to inquiries concerning interpretations
2、 of technical aspectsof ASME CSD-1.These replies are taken verbatim from the original replies except for a few typographicalcorrections and some minor editorial corrections made for the purpose of improved clarity. Insome few instances, a review of the interpretation may reveal a need for correction
3、s of a technicalnature; in these cases, a corrected interpretation will immediately follow the original reply.These interpretations were prepared in accordance with the accredited ASME procedures.ASME procedures provide for reconsideration of these interpretations when or if additionalinformation is
4、 available that the inquirer believes might affect the interpretation. Further, personsaggrieved by this interpretation may appeal to the cognizant ASME committee or subcommittee.ASME does not “approve,” “certify,” “rate,” or “endorse” any item, construction, proprietarydevice, or activity.I-1ASME C
5、SD-1 INTERPRETATIONSInterpretation: 12-01Subject: CSD-12006, CG-210Date Issued: January 26, 2009Question (1): In accordance with CSD-12006, is metallic tubing allowed for automatic ventlines, gas vent lines, or bleed lines?Reply (1): CSD-12006 does not specify materials for automatic vent lines, gas
6、 vent lines, orbleed lines (see CG-210).Question (2): In accordance with CSD-12006, is nonmetallic tubing allowed for automatic ventlines, gas vent lines, or bleed lines?Reply (2): CSD-12006 does not specify materials for automatic vent lines, gas vent lines, orbleed lines (see CG-210).Interpretatio
7、n: 12-02Subject: CSD-12006, CW-130Date Issued: July 10, 2009Question: For a coil-type boiler or a water tube boiler requiring forced circulation to preventoverheating and failure of the tubes or coils and having no definitive waterline, if a flow switchis installed with the aim of preventing overhea
8、ting by cutting off fuel, does a low-water cutoffswitch then become nonmandatory?Reply: Yes, see CW-210.Interpretation: 12-03Subject: CSD-12006, CW-410Date Issued: July 10, 2009Question: Does CSD-12006 permit the use of a manually reset temperature limit control deviceto satisfy the requirements of
9、CW-410, as long as the device is listed and labeled by a nationallyrecognized testing laboratory as complying with UL 353, Standard for Limit Controls?Reply: Yes.Interpretation: 12-04Subject: CSD-12006, Shutoff ValveDate Issued: July 10, 2009Question: Is a manual shutoff valve required downstream of
10、 the safety shutoff valve if a burner/boiler manufacturer does not require this manual shutoff valve for leak tests, operational tests,or maintenance?Reply: Yes.I-2ASME CSD-1 INTERPRETATIONSInterpretation: 12-05Subject: CSD-11998 With 1999 Addenda, Scope and Nonmandatory Appendix CDate Issued: July
11、13, 2009Question (1): Do boilers with fuel input ratings less than or equal to 400,000 Btu/hr fall underthe scope of CSD-1?Reply (1): Yes.Question (2): Are shop assembled boilers with fuel input ratings less than or equal to400,000 Btu/hr and certified as complying with ANSI Z21.13/CSA 4.9 required
12、to be suppliedwith a data report similar in nature to that described in Nonmandatory Appendix C?Reply (2): No.Question (3): Are shop assembled boilers with fuel input ratings less than or equal to400,000 Btu/hr but not certified as complying with ANSI Z21.13/CSA 4.9 required to be suppliedwith a dat
13、a report similar in nature to that described in Nonmandatory Appendix C?Reply (3): Yes.Question (4): Are field assembled boilers with fuel input ratings less than or equal to400,000 Btu/hr and certified as complying with ANSI Z21.13/CSA 4.9 required to be suppliedwith a data report similar in nature
14、 to that described in Nonmandatory Appendix C?Reply (4): No.Question (5): Are field assembled boilers with fuel input ratings less than or equal to400,000 Btu/hr and not certified as complying with ANSI Z21.13/CSA 4.9 required to be suppliedwith a data report similar in nature to that described in N
15、onmandatory Appendix C?Reply (5): This is not addressed by the Standard.Interpretation: 12-06Subject: CSD-12009, CW-110Date Issued: December 4, 2009Question: Does CW-110(a) require a stand-alone feeder control that is not used to cut off thefuel supply and is not part of a combined feeder/cut-off de
16、vice to conform to UL 353, Standardfor Limit Controls?Reply: No.I-3ASME CSD-1 INTERPRETATIONSInterpretation: 12-07Subject: CSD-12009, Part CW and Vacuum BoilersDate Issued: January 6, 2011Question: Per ASME Boiler and Pressure Vessel Code, Section IV, Mandatory Appendix 5,vacuum boilers that have(a)
17、 a pressure control that interrupts the burner operation in response to boiler pressure, andis set at 2.5 psig vacuum(b) two temperature controls responsive to boiler temperature that interrupt burner operation,where one operates at a temperature below 210F and the other at a temperature not exceedi
18、ng210F with no automatic recycle(c) a properly sized safety valve with no test lever set at a maximum pressure of 7.1 psig andare exempt from having a gage glass, water column, a second pressure-control, and a low-watercutoffAre such boilers also exempt from the requirements of CSD-1, Part CW?Reply:
19、 Yes. The requirements of Part CW in the 2009 edition of CSD-1 do not address vacuumboilers. CSD-1 action item 10-902 has been opened to address this.Interpretation: 12-08Subject: CSD-12009, CF-220Date Issued: December 5, 2011Question: Does CF-220 specifically require a combustion air switch to init
20、iate safety shutdownand lockout, or recycle, as applicable upon loss of combustion air?Reply: No, provided the intent of CF-220 is met.I-4ASME CSD-1 INTERPRETATIONSNUMERICAL AND SUBJECT INDEXInquiry No. Date Subject Edition Reference Vol.88-1 6/28/88 Gas train 1982 CF-180, Fig. CF-1 . . .88-2 4/5/89
21、 Periodic testing All CM-100 189-1 9/20/89 Modular boilers 1988 CW-120, CR 289-2 9/20/89 Safety shutdown 1984 CF-220, Table CF-1 289-3 9/20/89 Safety shutdown 1984 CW-120, CR 289-4 4/5/90 Safety shutdown 1988 CW-210, CW-110(e) 289-5 4/5/90 Testing 1988 CG-500, CG-420 290-1 2/12/90 Effective date Any
22、 Issue date, Appendix A 290-2 4/5/90 Rebuilt controls 1988 CF-310 290-3 4/5/90 Relief valve 1988 CW-520, Appendix A 290-4 10/12/90 Lockout 1988, 1989 CF-330, CF-530, Definitions 390-5 10/12/90 Vents 1988, 1989 CF-190 391-1 4/15/91 Flame failure 1988 Table CF-2 391-2 4/15/91 Combustion air proving 19
23、88, 1989, 1990 Tables CF-1, CF-2, CF-3 391-3 4/15/91 Hot water low-water cutoff 1988, 1989, 1990 CW-130, CR-210 391-4 4/15/91 Safety shutoff valves 1982, 1984 CF-180, Table CF-1 391-5 4/15/91 Safety shutoff valves 1988, 1989, 1990 CF-180 391-7 11/15/91 Pump motors 1988, 1989, 1990 CE-130 491-8 11/16
24、/91 Water level controls 1988, 1989, 1990 CW-130 492-2 5/15/92 Scope, definitions All 493-1 11/9/93 Limit controls 1988 CW-210, CF-210 493-2 11/9/93 Rebuilt controls All See Inquiry 90-2 494-1 2/14/94 Purge 1992, 1993 CF-210 494-3 5/25/94 Pressure controls 1992, 1993 CW-310(f), CW-310(g) 594-4 5/17/
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIASMECSD1INTERPRETATIONS2011INTERPRETATIONSTOCSD1CONTROLSANDSAFETYDEVICESFORAUTOMATICALLYFIREDBOILERSINCLUDESINTERPRETATIONSTHROUGHVOLUME15PDF

链接地址:http://www.mydoc123.com/p-431974.html