API TR 545-A-2009 Verification of lightning protection requirements for above ground hydrocarbon storage tanks (First Edition).pdf
《API TR 545-A-2009 Verification of lightning protection requirements for above ground hydrocarbon storage tanks (First Edition).pdf》由会员分享,可在线阅读,更多相关《API TR 545-A-2009 Verification of lightning protection requirements for above ground hydrocarbon storage tanks (First Edition).pdf(198页珍藏版)》请在麦多课文档分享上搜索。
1、API/EI Research Report 545-AVerification of lightning protectionrequirements for above ground hydrocarbon storage tanksFirst edition, October 2009API/EI Research Report 545-AVerification of lightning protection requirements for above ground hydrocarbon storage tanksFirst editionOctober 2009Published
2、 jointly byAPI and ENERGY INSTITUTE LONDONThe Energy Institute is a professional membership body incorporated by Royal Charter 2003Registered charity number 1097899Copyright 2009 by API, andThe Energy Institute, London:The Energy Institute is a professional membership body incorporated by Royal Char
3、ter 2003.Registered charity number 1097899, EnglandAll rights reserved.No part of this book may be reproduced by any means, or transmitted or translated into a machine language without the written permission of the publisher.ISBN 978 0 85293 376 3Published by the Energy InstituteThe information cont
4、ained in this publication is provided as guidance only and while every reasonable care has been taken to ensure the accuracy of its contents, the Energy Institute cannot accept any responsibility for any action taken, or not taken, on the basis of this information. The Energy Institute shall not be
5、liable to any person for any loss or damage which may arise from the use of any of the information contained in any of its publications.Further copies can be obtained from:Portland Customer Services, Commerce Way, Whitehall Industrial Estate, Colchester, CO2 8HP, UK.t: +44 (0) 1206 796 351 e: salesp
6、ortland-orGlobal Engineering Documents at (800) 854-7179 or (303) 397-7956w: Electronic access to EI publications is available via our website, www.energyinstpubs.org.uk.Documents can be purchased online as downloadable pdfs or on an annual subscription for single users and companies.For more inform
7、ation, contact the EI Publications Team e: pubsenergyinst.orgVERIFICATION OF LIGHTNING PROTECTION REQUIREMENTS FOR ABOVE GROUND HYDROCARBON STORAGE TANKS: PHASE 1Phase 1:iiiCONTENTS OVERVIEWPageLegal notices and disclaimers ivForeword vPHASE 1Acknowledgements iExecutive summary.iiCul/LT-0234 Review
8、of lightning phenomena and the interaction with above ground storage tanks 1Cul/LT-0235 Review of tank base earthing and test current recommendations43EI-EN2-04 Lightning tests to tank shell/shunt samples55EI-Vis1-01 Visit to oil refinery A 73EI-Vis2-02 Visit to oil refinery B.83EI-TN1-03 Review of
9、burn-through and hot-spot effects on metallic tank skins from lightning strikes . . 93PHASE 2Acknowledgments . i Executive Summary iiCul/LT-0373 Lightning simulation testing to determine the required characteristics for roof bonding cables on external floating roof above ground storage tanks 1Cul/LT
10、-0401 Investigative tests on the lightning protection of submerged shunts with parallel roof bonding cables 31VERIFICATION OF LIGHTNING PROTECTION REQUIREMENTS FOR ABOVE GROUND HYDROCARBON STORAGE TANKS: PHASE 1Phase 1:ivLEGAL NOTICES AND DISCLAIMERSThe information contained in this publication is p
11、rovided as guidance only, and although every effort has been made by API and EI to assure the accuracy and reliability of its contents, API and EI MAKE NO GUARANTEE THAT THE INFORMATION HEREIN IS COMPLETE OR ERROR-FREE. ANY PERSON OR ENTITY MAKING ANY USE OF THE INFORMATION HEREIN DOES SO AT HIS/HER
12、/ITS OWN RISK. TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW, THE INFORMATION HEREIN IS PROVIDED WITHOUT, AND API AND EI HEREBY EXPRESSLY DISCLAIM, ANY REPRESENTATION OR WARRANTY OF ANY KIND, WHETHER EXPRESS, IMPLIED OR STATUTORY, INCLUDING, WITHOUT LIMITATION, WARRANTIES OF MERCHANTABILITY, FIT
13、NESS FOR A PARTICULAR PURPOSE, TITLE AND NON-INFRINGEMENT. IN NO EVENT SHALL API OR EI BE LIABLE TO ANY PERSON, OR ENTITY USING OR RECEIVING THE INFORMATION HEREIN FOR ANY CONSEQUENTIAL, INCIDENTAL, PUNITIVE, INDIRECT OR SPECIAL DAMAGES (INCLUDING, WITHOUT LIMITATION, LOST PROFITS), REGARDLESS OF TH
14、E BASIS OF SUCH LIABILITY, AND REGARDLESS OF WHETHER OR NOT API OR EI HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES OR IF SUCH DAMAGES COULD HAVE BEEN FORESEEN.The contents of this publication are not intended or designed to define or create legal rights or obligations, or set a legal standard
15、 of care.API or EI is not undertaking to meet the duties of manufacturers, purchasers, users and/or employers to warn and equip their employees and others concerning safety risks and precautions, nor is API or EI undertaking any of the duties of manufacturers, purchasers, users and/or employers unde
16、r local and regional laws and regulations. This information should not be used without first securing competent advice with respect to its suitability for any general or specific application, and all entities have an independent obligation to ascertain that their actions and practices are appropriat
17、e and suitable for each particular situation and to consult all applicable federal, state and local laws.API AND EI HEREBY EXPRESSLY DISCLAIM ANY LIABILITY OR RESPONSIBILITY FOR LOSS OR DAMAGE RESULTING FROM THE VIOLATION OF ANY LOCAL OR REGIONAL LAWS OR REGULATIONS WITH WHICH THIS PUBLICATION MAY C
18、ONFLICT.Nothing contained in any API or EI publication is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, or use of any method, apparatus, or product covered by letters patent. Neither should anything contained in the publication be construed as insurin
19、g anyone against liability for infringement of letters patent.No reference made in this publication to any specific product or service constitutes or implies an endorsement, recommendation, or warranty thereof by API or EI.API, EI, AND THEIR AFFILIATES, REPRESENTATIVES, CONSULTANTS, AND CONTRACTORS
20、AND THEIR RESPECTIVE PARENTS, SUBSIDIARIES, AFFILIATES, CONSULTANTS, OFFICERS, DIRECTORS, EMPLOYEES, REPRESENTATIVES, AND MEMBERS SHALL HAVE NO LIABILITY WHATSOEVER FOR, AND SHALL BE HELD HARMLESS AGAINST, ANY LIABILITY FOR ANY INJURIES, LOSSES OR DAMAGES OF ANY KIND, INCLUDING DIRECT, INDIRECT, INC
21、IDENTAL, CONSEQUENTIAL, OR PUNITIVE DAMAGES, TO PERSONS, INCLUDING PERSONAL INJURY OR DEATH, OR PROPERTY RESULTING IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY, FROM ACCEPTANCE, USE OR COMPLIANCE WITH THIS PUBLICATION.VERIFICATION OF LIGHTNING PROTECTION REQUIREMENTS FOR ABOVE GROUND HYDROCARBON STOR
22、AGE TANKS: PHASE 1Phase 1:vFOREWORDThis publication has been produced at the request of the API RP 545 Task Force and the EI Electrical Committee. It collates a number of research reports produced by Culham Electromagnetics and Lightning Limited (Culham) who were commissioned to investigate the ligh
23、tning phenomena and the adequacy of lightning protection measures on above ground hydrocarbon storage tanks.Currently international, British and United States standards contain requirements relating to lighting protection; however, these have not been verified through practical, scientific testing.
24、As a result of the work commissioned by the API and EI, a new Recommended Practice (RP) is being developed which will incorporate the results of this investigation.Suggested revisions are invited and should be submitted to the director of standards, API, 1220 L Street, N.W., Washington, D.C. 20005 o
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APITR545A2009VERIFICATIONOFLIGHTNINGPROTECTIONREQUIREMENTSFORABOVEGROUNDHYDROCARBONSTORAGETANKSFIRSTEDITIONPDF

链接地址:http://www.mydoc123.com/p-430183.html