API MPMS 17.12-2015 Procedures for bulk liquid chemical cargo inspections (SECOND EDITION).pdf
《API MPMS 17.12-2015 Procedures for bulk liquid chemical cargo inspections (SECOND EDITION).pdf》由会员分享,可在线阅读,更多相关《API MPMS 17.12-2015 Procedures for bulk liquid chemical cargo inspections (SECOND EDITION).pdf(64页珍藏版)》请在麦多课文档分享上搜索。
1、API Manual of Petroleum Measurement Standards Chapter 17.12EI Hydrocarbon Management HM 51Procedures for bulk liquid chemical cargo inspections2nd edition, August 2015Published byENERGY INSTITUTE, LONDONThe Energy Institute is a professional membership body incorporated by Royal Charter 2003Register
2、ed charity number 1097899API MPMS CHAPTER 17.12/EI HM 51 PROCEDURES FOR BULK LIQUID CHEMICAL CARGO INSPECTIONS2nd editionAugust 2015ISBN 978 0 85293 737 2API MPMS CHAPTER 17.12/EI HM 51: PROCEDURES FOR BULK LIQUID CHEMICAL CARGO INSPECTIONS3CONTENTSPageSpecial notes and disclaimers 6Foreword 81 Scop
3、e 91.1 General .91.2 Measurement stages .91.3 Quality control.101.4 Summary of data to be reported .102 Normative references 112.1 General 112.2 API/EI documents.112.3 EI documents112.4 API documents 112.5 API/ASTM documents .122.6 American Society for Testing and Materials (ASTM) .122.7 Other docum
4、ents 123 Terms and definitions 133.1 Accuracy .133.2 Ballast .133.3 Capacity table, tank.133.4 Critical zone 133.5 Density 133.6 Density, relative 133.7 Dip .143.8 Displacer (tank gauging) .143.9 Floating cover .143.10 Floating roof tank 143.11 Gauging .143.12 Inert gas .143.13 Inhibitors.143.14 Lis
5、t .143.15 Mass 153.16 Measurement .153.17 Meter factor 153.18 On board quantity (OBQ).153.19 Outturn153.20 Reference gauge height153.21 Representative sample.153.22 Restricted gauging153.23 Sampling.163.24 Slops 163.25 Spot sample 163.26 Stripping .163.27 Tape 163.28 Trim.163.29 Trim correction 16AP
6、I MPMS CHAPTER 17.12/EI HM 51: PROCEDURES FOR BULK LIQUID CHEMICAL CARGO INSPECTIONS4Contents continued Page3.30 Ullage .163.31 Ullage gauge173.32 Vapour 173.33 Vessel experience factor (VEF, VEFL, VEFD) 173.34 Volume correction factor (VCF) 173.35 Volume, gross observed (GOV) 173.36 Volume, gross s
7、tandard (GSV) .173.37 Volume, net standard (NSV).173.38 Volume, total calculated (TCV).173.39 Water, free .183.40 Water cut (static measurement) 183.41 Wedge formula 184 General principles 194.1 The purpose of a cargo inspection194.2 General responsibilities 194.2.1 Communications, capabilities and
8、performance 194.2.2 Equipment 204.2.3 Letters of protest/notices of apparent discrepancy 204.2.4 Reporting.214.3 Potential measurement error . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 215 Safety recommendations 225.1 General 225.2 Safety aspects of equipment
9、225.3 Safety at sampling points.235.4 Static electricity 235.5 Health hazards 245.6 Entry into confined spaces245.7 Personnel transfer offshore .256 Operation planning (loading and discharge) 276.1 Key meeting 276.2 Information to be determined before an operation commences277 Inspection, sampling a
10、nd quality control procedures 307.1 Load procedures .307.1.1 Shore tanks .307.1.2 Dynamic measurement (metering) See Annex B.327.1.3 Sampling .337.1.4 Manual sampling of shore tanks347.1.5 Automatic sampling .347.1.6 Pipelines357.1.7 Vessel procedures before loading .367.1.8 Vessel procedures at sta
11、rt of loading 407.1.9 Vessel procedures after loading 417.1.10 Calculations .427.1.11 Vessel experience factor 427.1.12 Reconciliation of measured qualities.42API MPMS CHAPTER 17.12/EI HM 51: PROCEDURES FOR BULK LIQUID CHEMICAL CARGO INSPECTIONS5Contents continued Page7.2 Discharge procedures 427.2.
12、1 Vessel measurements before discharge.427.2.2 In-transit difference .437.2.3 Sampling .437.2.4 Tank stripping operations/ROB .437.2.5 Shore tank gauging and sampling 447.2.6 Reconciliation of measured quantities448 Calculation of quantities 458.1 General 458.2 Calculation methods 458.3 Examples of
13、shore tank and marine tank calculations468.3.1 Weight calculations .469 Final report 479.1 Inspection data 47AnnexesAnnex A Guidelines for verifying the accuracy of manual gauging equipment 49A.1 Introduction .49A.2 Liquid-in-glass thermometers 49A.2.1 Laboratory inspection 49A.2.2 Field inspection.
14、49A.3 Portable electronic gauging devices (PEGDs) 49A.4 Manual gauging tapes .49A.5 Density determination .50A.5.1 Hydrometers.50A.5.2 Densitometers50Annex B Monitoring metering system performance at loading 51B.1 Introduction .51B.2 Description of meter loading measurement systems .51B.2.1 Meter fa
15、ctor .51B.3 Monitoring procedures.53Annex C Wedge formula calculation 55C.1 Calculation of the trim factor 55C.2 Calculation of the length of the wedge 55C.3 Calculation of DA.56C.4 Wedge formula based on the tank width .57C.5 Wedge formula based on theoretical tank width .58Annex D Offshore operati
16、ons 58D.1 General 60D.2 Safety Personnel transfers .60D.3 Inspection 60D.4 Reconciliation of figures 60D.5 Reporting and final report 61Annex E Wall wash guidelines 62API MPMS CHAPTER 17.12/EI HM 51: PROCEDURES FOR BULK LIQUID CHEMICAL CARGO INSPECTIONS6SPECIAL NOTES AND DISCLAIMERSAPI and EI public
17、ations are recommended for general adoption but should be read and interpreted in conjunction with Weights and Measures, Safety, Customs and Excise and other regulations in force in the country in which they are to be applied With respect to particular circumstances, local, state, and federal laws a
18、nd regulations should be reviewed Such regulatory requirements have precedence over corresponding clauses in API/EI publications However, where requirements of API/EI publications are more rigorous, then their use is recommended Where applicable, authorities having jurisdiction should be consulted T
19、he information contained in this publication is provided as guidance only. Neither API and EI nor any of API/EIs employees, subcontractors, consultants, committees, or other assignees make any warranty or representation, either express or implied, with respect to the accuracy, completeness, or usefu
20、lness of the information contained herein, or assume any liability or responsibility for any use, or the results of such use, of any information or process disclosed in this publication. Neither API and EI nor any of API/EIs employees, subcontractors, consultants, or other assignees represent that u
21、se of this publication would not infringe upon privately owned rights.Users of this publication should not rely exclusively on the information contained in this document. Sound business, scientific, engineering, and safety judgment should be used in employing the information contained herein. Work s
22、ites and equipment operations may differ. Users are solely responsible for assessing their specific situation in determining the appropriateness of applying the information.Information concerning safety and health risks and proper precautions with respect to particular materials and conditions shoul
23、d be obtained from the employer, the manufacturer or supplier of that material, or the applicable safety data sheet.Classified areas may vary depending on the location, conditions, equipment, and substances involved in any given situation. Users of this Standard should consult with the appropriate a
24、uthorities having jurisdiction.API/EI joint publications may be used by anyone desiring to do so. Every effort has been made by the Institutes to assure the accuracy and reliability of the data contained in them; however, the Institutes make no representation, warranty, or guarantee in connection wi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APIMPMS17122015PROCEDURESFORBULKLIQUIDCHEMICALCARGOINSPECTIONSSECONDEDITIONPDF

链接地址:http://www.mydoc123.com/p-429619.html