API GUIDELINES FOR ROW ACTIVITIES-2018 GUIDELINES FOR RIGHT - OF - WAY ACTIVITIES.pdf
《API GUIDELINES FOR ROW ACTIVITIES-2018 GUIDELINES FOR RIGHT - OF - WAY ACTIVITIES.pdf》由会员分享,可在线阅读,更多相关《API GUIDELINES FOR ROW ACTIVITIES-2018 GUIDELINES FOR RIGHT - OF - WAY ACTIVITIES.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、GUIDELINESFOR RIGHT-OF-WAY ACTIVITIESAMERICAN PETROLEUM INSTITUTETABLE OF CONTENTS SPECIAL THANKSGUIDELINESFOR RIGHT-OF-WAY ACTIVITIES1 GUIDELINES FOR RIGHT-OF-WAY ACTIVITIES3 GUIDELINES FOR CROSSING PIPELINES, GAS TRANSMISSION LINES, MAINS AND SERVICE CONNECTIONS5 GUIDELINES FOR AGRICULTURE: FIELD
2、TILE DITCHING AND DEEP PLOWING7 GUIDELINES FOR BORING, DRILLING, AND TUNNELING9 GUIDELINES FOR OVERHEAD AND BURIED POWER AND COMMUNICATION CABLES INCLUDING FIBER OPTICS11 GUIDELINES FOR ROADS, RAILROADS, PAVED LOTS, LOGGING OPERATIONS, AND HEAVY EQUIPMENT VEHICLES13 GUIDELINES FOR PROPERTY IMPROVEME
3、NTS15 GUIDELINES FOR SEISMIC SURVEYING17 PIPELINE SAFETY AWARENESS19 THE ONE CALL SYSTEM20 SPECIAL NOTESMarathon Pipe Line LLCs publication by the same name was the model for this work.THE LIQUID PETROLEUM PIPELINE INDUSTRY has developed these guidelines to improve understanding and increase awarene
4、ss of the nature of underground pipelines that transport oil, petroleum products, natural gas liquids and other hazardous liquids (collectively “pipelines” or “pipeline” throughout this document) and how to conduct land development and use activity near pipeline rights of way. The guidelines are int
5、ended for use by anyone who is involved in land development, agriculture and excavation/construction activities near a pipeline. The industrys goal is to protect public safety of the people who live and work along pipeline rights of way, protect the environment along rights of way, and maintain the
6、integrity of the pipeline so that petroleum products can be delivered to customers safely and without interruption.A pipeline right-of-way (ROW) is property in which a pipeline company and a landowner both have a legal interest. Each has a right to be there, although each has a different type of use
7、 for the land. Pipeline companies are granted permission from private landowners to transport petroleum products across their private lands. That permission is documented in a written agreement called an easement, and it is obtained though purchase, license, or by agreement with the landowner. In ca
8、ses where the land is owned by the government whether local, state or federal similar arrangements for easements, licenses, or occupancy agreements are obtained.The pipeline company and the landowner granting the pipeline easement are not the only ones who have access to the pipeline ROW. Third part
9、ies doing business along the ROW are also vital partners in protecting the environment by keeping pipelines safe and free of accidents. The cooperation of everyone involved in property development including, but not limited to, real estate brokers, agents, developers, engineers, architects, general
10、contractors and their subcontractors, and local elected officials and government staff is essential. Construction work done anywherenear a pipeline, even in a homeowners backyard, can affect the integrity and safety of underground pipelines. The pipeline industry hopes that these guidelines will hel
11、p both pipeline operators and people working and living along pipeline rights of way to better understand their respective responsibilities for maintaining the safety of this vital, but invisible, transportation system. Please nnulle nullanull nullnulllnulle nullenullnullnullnull snullnullnull nulln
12、ullelnulles snullnullnull null nullllnullenull as nullenull nullnull nullnullenull nullnull nullese nullnullelnullesnullA pipeline requires regular observation, integrity assessment and maintenance to maintain the safety of its operations. Part of that task is to ensure that the pipeline ROW is kept
13、 clear of trees, structures and other encroachments that might interfere with the safe operation of the pipeline and the pipeline companys access to the line.One of the key facilitators of ROW inspection is ROW clearing. Good communications between the pipeline operator and the public are important
14、in minimizing any issues between the public and the pipeline operator, especially during initial clearing activities.ROW clearing is performed for a variety of reasons with the paramount reason being safety. ROW clearing enables: Aerial surveillance Patrols are completed to detect potentially harmfu
15、l excavation activities along the pipeline ROW and visually assure no releases have occurred. Damage prevention A clear ROW provides a visual corridor so the pipeline can be protected from unauthorized excavation and development. Routine maintenance access Clear access to the pipeline is critical to
16、 completing required maintenance in a safe, efficient and effective manner. Emergency response access Clear access to the pipeline allows for a prompt response in the event of an emergency. Corrosion protection Tree roots can wrap around a pipeline, damaging the protective coating of the pipeline, c
17、ompromising efforts to avoid pipeline corrosion.1GUIDELINESFOR RIGHT-OF-WAY ACTIVITIESThere are multitudes of underground facilities, some transporting volatile liquids or natural gas under high pressure. Many pipelines were placed in the ground years ago. Over time, what was once pastureland may no
18、w be someones backyard, a residential development or a new business. With advance planning and shared information, future economic development can be done safely and in the most cost-effective manner for the developer and the pipeline company. Most damage to pipelines is avoidable through better adv
19、ance planning and using the ONE CALL SYSTEM, which can be accessed by calling nullnull, or by access through the CALLnullnullnullnull website. The One Call System is a free public service established by state agencies, non-profit entities and public utilities to provide underground utility locating
20、and marking for those who plan to dig or excavate in the vicinity of a utility. Always use the One Call System in your state before undertaking a project that includes excavation or digging underground. Never assume that you know the location of pipelines. The permanent aboveground markers along the
21、 pipeline route are not exact indicators of the pipeline location pipelines have bends and can change direction with no aboveground indication; the depths of the pipeline may vary substantially within even short distances; and more than one line or utility may exist within a single right-of-way.2GUI
22、DELINESFOR RIGHT-OF-WAY ACTIVITIES3COMMON GUIDELINES“Foreign pipeline” means any hazardous liquid pipeline, gas transmission line, main, service connection, and utility pipe such as water line, sewer line or any other pipeline installed within the right-of-way (ROW) of an existing hazardous liquid p
23、ipeline.A foreign pipeline crossing should cross perpendicular, or as close as possible to 90 degrees to the existing pipeline and its designated ROW.A foreign pipeline should not run parallel or nearly parallel to an existing pipeline within the boundaries of the ROW for the existing pipeline, or w
24、ithin 25 feet of the existing pipeline without specific written approval from the company operating the existing pipeline. The placement of the foreign pipeline should also be consistent with the existing easement agreement. A foreign pipeline should cross underneath an existing pipeline with a mini
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APIGUIDELINESFORROWACTIVITIES2018GUIDELINESFORRIGHTOFWAYACTIVITIESPDF

链接地址:http://www.mydoc123.com/p-429587.html