AIR FORCE MIL-C-38972-1970 CARTRIDGE BOMB EJECTION CCU-9 B《CCU-9 B弹射弹炸药包》.pdf
《AIR FORCE MIL-C-38972-1970 CARTRIDGE BOMB EJECTION CCU-9 B《CCU-9 B弹射弹炸药包》.pdf》由会员分享,可在线阅读,更多相关《AIR FORCE MIL-C-38972-1970 CARTRIDGE BOMB EJECTION CCU-9 B《CCU-9 B弹射弹炸药包》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、- _- - _- - - - -I - .- -_ _ - - .- r-. I- r.- - . -i f MIL-C-38972 13 W 977970b 0305807 9 E .Y I I I MIL-C-38972 (USAF) . 1 June 1970 ,* 2 MILITARY SPECIFICATIOH CARTRIDGE, BONB EJECTION CCU-9 /B _. This specification is mandatory for use by USAF 1. SCOPE 1.1 cartridge designated as the Cartridge,
2、Bomb Ejection CCU-9/B here- after referred to as the cartridge. provide a source of gas pressure for forced ejection of weapons from the Aircraft Bomb Ejector Racks MAU-12A/AY MAU-l2B/A, MAU-12/CY BRU-4/AY AERO-/A, AERO-27/A and similar type racks. This specification covers the requirements for one
3、type of The cartridge is designed to 2. APPLICABLE DOCUMENTS 2.1 invitation for bids, form a part of this specification to the extent specified herein: The following documents of the issue in effect on the date of SPECIFICATIONS Military MIL-D-1000 Drawings, Engineering and Associated Lists MIL-A-2
4、5 50 Ammunition and Special Weapons, General Specification For MIL-T-7743 Testing, Store Suspension Equipment, General Specification For MIL-D - 8 13 O 3 Design and Evaluation of Cartridges for Stores Suspension Equipment -_ STANDARDS Military MIL-STD-105 Sampling Procedures and Tables for Inspectio
5、n by Attributes MIL-STD-129 Marking for Shipment and Storage MIL4 TD-130 Identification Marking of U.S. Military Property MIL-STD-202 Test Methods for Electronics and Electrical Parts MIL-STD-810 Environmental Test Methods for Aerospace and Ground Equipinent Provided by IHSNot for ResaleNo reproduct
6、ion or networking permitted without license from IHS-,-,-MIL-C-38972 13 9999906 0305808 O = 15L-C-3 89 72 (USAF) MIL-STD-831 Test Reports, Preparation of XIL-STD-116 7 MIL-STD-1168 Ammunition Data Card Lot Numbering of Aimunition Air Force 69314035 Cartridge Bomb Ejection CCU-9/B OTHER PUBLICATIONS
7、Code of Federal Regulations 49CFR Parts 71-79 Interstate Commerce Commission Regulations for the Transportation of Explosives and other Dangerous Material (The Interstate Commerce Commission Regulations are now a part of the Code of Federal Regulations (1949 Editions Revised 1965) available from the
8、 Superiatendent of Documents, Government Printing Office, Washington, D.C. cation should cite 49 CFR Parts 71-79 (Revised 1965).) Orders for the above publi- 3. REQUIREMENTS 3.1 Preproduction. This specification makes provision for prepro- duction testing. 3.2 Design and Construction. The cartridge
9、shall be constructed in conformance to Air Force drawing 69314035 and subsidiary drawings. 3.3 Function. The function of the cartridge is to provide a source . of gas pressure for forced ejection of weapons from a Bomb Ejector Rack MAU-lLB/A or similar types of ejector racks. 3.3.1 Ballistics. Two c
10、artridges, installed in a MAU-12 Bomb Ejector Rack and actuated by the “all fire“ current shall produce performance as noted below. The test store shall be as described in 3.3.2. Velo city Reaction Force -65 stabilization shall be as defined in MIL-STD-810. Temperature 4.4.3 Test Measurements. 4.4.3
11、.1 Instruments. All measurements shall be made with instruments whose accuracy has been verified. Calibration records shall be _ ._ -=- maintained, 4.4.3.2 Tolerances. The maximum allowable tolerance on test condition measurements shall be as follows: a. Temperature - plus or minus 2.8OC (5OF) e b.
12、Relative Humidity - plus or minus 5 percent. C. Vibration and Shock Amplitude - plus -or minus 5 percent. d. e. Vibration Frequency - plus or minus 2 percent. Current - plus or minus 2 percent. f. g. Resistance - plus or minus 2 percent. Time Interval - plus or minus 2 percent. h, Pressure - plus or
13、 minus 5 percent. i. Reaction Force - plus Qr minus 5 percent. j. Velocity - plus or minus 5 percent. k. Sound level - plus or minus 2 percent. 4.4.4 Required Measurements a, Resistance of unit prior to firing. 9 Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr
14、om IHS-,-,-MIL-C-38772 13 W 7779706 0305816 T EL-C-3S972 (USAF) b. C. d. e. f. g* h. Firing current. Firing time. Pressure vs time. Reaction force vs time. Pitch Rate vs time. Velocity For preproduction testing, the cartridge number shall be recorded. i. Other measurements shall be taken as specifie
15、d in preproduc- . tion schedule and test plan. 4.5 Test Methods . 4.5.1 Classification of Tests. Inspection and testing of the cartridge shall be as shown in Table I. 4.5.2 Examination of Product. 4.5.2.1 Examination of Components. One hundred percent examination shall be performed for all draiting
16、characteris tics when the component lot size is not in excess of 1000 cartridges. For lot sizes in excess of 1000 cartridges, sampling inspection will be performed utilizing a plan acceptable to the procuring agency, in accordance with MIL-STD-105. Failure to comply with all drawing and specificatio
17、n requirements shall be cause for rejection. 4.5.2.2 Examination of Assemblies. One hundred percent examination shall be performed to determine drawing compliance with all require- ments of the assembly drawing and this specification when the assembly lot size is not in excess of 1000 cartridges. Fo
18、r lot sizes in excess of 1000, sampling inspection will be performed to determine drawing compliance utilizing a plan acceptable to the procuring agency in accordance with MIL-STD-105. 4.5.3 Conformance to Drawings. Each cartridge shall be inspected for strict conformance to the engineering drzwings
19、, and to specifications and standards referenced therein. Failure to meet these criteria shall be cause for rejection. 10 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-38972 13 m 997970b 0305817 1 MIL-C-38972 (USAF) 4.5.4 X-Ray Examination. E
20、ach Cartridge of the preproduction test sample shall be subjected to X-ray examination. shall be identified by date, cartridge part numbers, lot number and serialnumbers. compliance with the requirements of this specification. 4.5.5 Ail Fire Sensitivity. Cartridge shall be tested according to - Tabl
21、e II. ballistic requirements of this specification, shall be cause for re j e ct ion. X-ray photographs These X-ray photographs shall be examined to determine Failure of any cartridge to fire, or failure to meet the 4.5.6 No Fire Sensitivity. Cartridges shall be tested according to Table II. The car
22、tridges shall be held in a test jig. The direct. . current shall be lwatt for a duration of five minutes. the cartridge shall be cause for rejection, Firing of 4.5.7 Sympathetic Ignition. one cartridge and the other shall be sympathetically ignited. minimum velocity for the test store stated in the
23、ballistic requirements of this specification do not apply to this test. Failure of the cartridge to achieve ignition shall be cause for rejection. 4.5.8 Electrical Resistance. The resistance of the bridge wire shall be measured within an accuracy of 1 percent using a test circuit which subjects the
24、bridge wire to a current of 0.9 f. 0.05 amperes. The cartridge shall be subjected to this test current for a period not to exceed 60 seconds. This test shall be conducted in accordance with MIL-STD-POS, Method 303 e A 5 ampere current shall be applied to The 4.6 Environmental Tests. During or after
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIRFORCEMILC389721970CARTRIDGEBOMBEJECTIONCCU9BCCU9B 弹射 炸药包 PDF

链接地址:http://www.mydoc123.com/p-427593.html