AASHTO T 158-2011 Standard Method of Test for Bleeding of Concrete.pdf
《AASHTO T 158-2011 Standard Method of Test for Bleeding of Concrete.pdf》由会员分享,可在线阅读,更多相关《AASHTO T 158-2011 Standard Method of Test for Bleeding of Concrete.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、Standard Method of Test for Bleeding of Concrete AASHTO Designation: T 158-11 (2015) ASTM Designation: C232/C232M-09 American Association of State Highway and Transportation Officials 444 North Capitol Street N.W., Suite 249 Washington, D.C. 20001 TS-3b T 158-1 AASHTO Standard Method of Test for Ble
2、eding of Concrete AASHTO Designation: T 158-11 (2015) ASTM Designation: C232/C232M-09 1. SCOPE 1.1. These test methods cover the determination of the relative quantity of mixing water that will bleed from a sample of freshly mixed concrete. Two test methods that differ primarily in the degree of vib
3、ration to which the concrete sample is subjected are included. 1.2. The two test methods are not expected to yield the same test results when samples of concrete from the same batch are tested by each method. When various concretes are to be compared, all the tests should be conducted using the same
4、 method, and the sample masses, if the batches are of similar unit weight, should not differ by more than 1 kg 2 lb. 1.3. The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each
5、 system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard. 1.4. This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard t
6、o establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. 2. REFERENCED DOCUMENTS 2.1. AASHTO Standards: R 39, Making and Curing Concrete Test Specimens in the Laboratory R 60, Sampling Freshly Mixed Concrete T 121M/T 121, Density (Un
7、it Weight), Yield, and Air Content (Gravimetric) of Concrete 2.2. ASTM Standard: C670, Standard Practice for Preparing Precision and Bias Statements for Test Methods for Construction Materials 3. SIGNIFICANCE AND USE 3.1. This test method provides procedures to be used for determining the effect of
8、variables of composition, treatment, environment, or other factors in the bleeding of concrete. It may also be used to determine the conformance of a product or treatment with a requirement relating to its effect on bleeding of concrete. 2016 by the American Association of State Highway and Transpor
9、tation Officials.All rights reserved. Duplication is a violation of applicable law.TS-3b T 158-2 AASHTO 3.2. Method AFor a sample consolidated by rodding only and tested without further disturbance, thus simulating conditions in which concrete, after placement, is not subjected to intermittent vibra
10、tion. 3.3. Method BFor a sample consolidated by vibration and tested with further intermittent periods of vibration, thus simulating conditions in which concrete, after being placed, is subjected to intermittent vibration. METHOD ASAMPLE CONSOLIDATED BY TAMPING 4. APPARATUS 4.1. ContainerA cylindric
11、al container of approximately 14-L approximately 1/2-ft3 capacity, having an inside diameter of 255 5 mm 10 1/4in. and an inside height of 280 5 mm 11 1/4in. The container shall be made of metal having a thickness of 2.67 to 3.40 mm 0.105 to 0.134 in. and shall be externally reinforced around the to
12、p with a 2.67- to 3.40-mm 0.105- to 0.134-in. metal band, 40 mm 11/2in. wide. The inside shall be smooth and free from corrosion, coatings, or lubricants. 4.2. ScaleOf sufficient capacity to determine the mass of the load required with an accuracy of 0.5 percent. Balances or scales shall be calibrat
13、ed at least annually or whenever there is a reason to question the accuracy of the equipment. Equipment not in operating condition or out of tolerance shall be marked as such and taken out of service until corrected. 4.3. PipetOr similar instrument for drawing off free water from the surface of the
14、test specimen. 4.4. Glass GraduateOf 100-mL capacity for collecting and measuring the quantity of water withdrawn. 4.5. Tamping RodA round, straight steel rod, with a 16 2-mm 58in. 116-in. diameter. The length of the tamping rod shall be at least 100 mm 4 in. greater than the depth of the measure in
15、 which rodding is being performed but not greater than 600 mm 24 in. in overall length. The length tolerance for the tamping rod shall be 4 mm 18in. The rod shall have the tamping end or both ends rounded to a hemispherical tip of the same diameter as the rod. 4.6. Metal Beaker (Optional)A 1000-mL m
16、etal beaker for collecting the decanted supernatant water and sludge (Note 1). 4.7. Balance (Optional)A balance sensitive to 1 g for determining the mass of the decanted water and sludge (Note 1). 4.8. Hot Plate (Optional)A small electric hot plate or other source of heat for evaporating decanted wa
17、ter (Note 1). Note 1The apparatus listed in Sections 4.6, 4.7, and 4.8 will be required if the procedure of measuring the amount of bleeding water recovered is one involving weighing, evaporation, and reweighing. 2016 by the American Association of State Highway and Transportation Officials.All righ
18、ts reserved. Duplication is a violation of applicable law.TS-3b T 158-3 AASHTO 5. TEST SPECIMEN 5.1. For concrete made in the laboratory, prepare the concrete as described in R 39. For concrete made in the field, sample the concrete as described in R 60. The apparatus described in this method may be
19、 used with samples of concrete containing any size of aggregate graded up to and including a nominal maximum size of 50 mm 2 in. Concrete containing aggregate larger than 50 mm 2 in. in nominal maximum size shall be wet-sieved over a 37.5-mm 11/2-in. sieve and the test performed on a portion of the
20、sample that passes through the sieve. 5.2. Fill the container with the concrete in accordance with T 121M/T 121, except that the container shall be filled to a height of 254 3 mm 10 1/8in. Level the top surface of the concrete to a reasonably smooth surface by a minimum amount of troweling. 6. PROCE
21、DURE 6.1. During the test, maintain the ambient temperature between 18 and 24C 65 and 75F. Immediately after troweling the surface of the specimen, record the time and determine the mass of the container and contents. 6.2. Place the specimen and container on a level platform or floor free from notic
22、eable vibration and cover the container to prevent evaporation of the bleed water. Keep the cover in place throughout the test, except when drawing off the water. 6.3. Draw off (with pipet or similar instrument) the water that has accumulated on the surface, at 10-min intervals during the first 40 m
23、in and at 30-min intervals thereafter, until cessation of bleeding. To facilitate the collection of bleeding water, tilt the specimen carefully by placing a block approximately 50-mm 2-in. thick under one side of the container 2 min prior to each time the water is withdrawn. After the water is remov
24、ed, return the container to a level position without jarring. 6.4. After each withdrawal, transfer the water to a 100-mL graduate. Record the accumulated quantity of water after each transfer. When only the total volume of bleeding is desired to be determined, the periodic removal procedure may be o
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOT1582011STANDARDMETHODOFTESTFORBLEEDINGOFCONCRETEPDF

链接地址:http://www.mydoc123.com/p-418112.html