1、Standard Practice for Continuous Thermal Profile of Asphalt Mixture Construction AASHTO Designation: PP 80-141American Association of State Highway and Transportation Officials 444 North Capitol Street N.W., Suite 249 Washington, D.C. 20001 TS-5c PP 80-1 AASHTO Standard Practice for Continuous Therm
2、al Profile of Asphalt Mixture Construction AASHTO Designation: PP 80-1411. SCOPE 1.1. This work shall consist of continuous thermal profiling of the asphalt mat temperature immediately behind the paver(s) during placement. 1.2. The equipment uses infrared temperature measurement technology to measur
3、e a longitudinal thermal profile across the pavement width directly behind the paver. This system includes a display that allows the operator in the field to view a pavement surface temperature contour plot and automatically stores and saves the data for later review. 1.3. This standard practice is
4、intended to be applied for construction quality control. 2. REFERENCED DOCUMENTS 2.1. AASHTO Standards: None 2.2. ASTM Standards: None 3. TERMINOLOGY 3.1. Definitions: 3.1.1. contour plota graphic display of data using contour lines and/or color scales. These plots may display raw values or employ v
5、arying degrees of smoothing. 3.1.2. Distance Measuring Instrument (DMI)a sensor attached to a wheel on the paver to calculate distance and velocity. 3.1.3. Global Positioning System (GPS)a space-based satellite navigation system that provides location and time information, anywhere on or near the Ea
6、rth where there is an unobstructed line of sight to four or more GPS satellites. 3.1.4. indexmeasure or standard to quantify the uniformity of a hot- or warm-mix asphalt construction operation. 3.1.5. summary indicesthe combination of real-time indices plus the distribution of placement temperatures
7、 and the location and duration of paver stops exceeding 1 min. 3.1.6. sample intervalthe longitudinal distance between data thermal profiles. 2014 by the American Association of State Highway and Transportation Officials.All rights reserved. Duplication is a violation of applicable law.TS-5c PP 80-2
8、 AASHTO 3.1.7. thermal profilerthe combination of the equipment and host vehicle used to measure the thermal profile. Note 1The paving machine will typically serve as the host vehicle. 3.1.8. thermal profilea set of temperature measurements at discrete intervals across the mat. 4. GENERAL THERMAL PR
9、OFILE REQUIREMENTS 4.1. GeneralThe equipment shall function independently from the paving crew during normal paving operations. Note 2Initial data collection must be initiated by an operator. After initializing the equipment, no operator attendance shall be required for continuous data collection. 4
10、.1.1. The equipment shall be equipped with various sensor(s) and interface hardware that will measure, record, and display the thermal profile. The data shall be stored both internally and on a suitable high-density removable storage device during the test. If needed, the owner-agency may specify ad
11、ditionally to send the data to a remote database automatically. The thermal profile shall be taken within 3 m 10 ft of the trailing edge of the paver. The data must be stored internally at least every 5 min, and if a remote database is specified, then at least by the end of the days paving, the data
12、 will be uploaded automatically. 4.1.2. Distance traveled and velocity during collection of the thermal profile shall be measured using a DMI and/or GPS. The run-time software and postprocessing software shall be used to combine these measurements to develop a thermal-profile result with distance or
13、 stationing and GPS coordinates. 4.1.3. The equipment shall be capable of obtaining and storing profile measurement data at selected longitudinal distance intervals. The equipment shall be capable of a sample interval every 12 in. 305 mm or less at all paving speeds. 4.2. Maximum Sample SpacingMeasu
14、re the thermal profile with sensor(s) that provide temperature measurements that conform to the requirements in Table 1. Table 1Maximum Sample Spacing Location Interval Tolerance Lateral 305 mm 12.0 in. 25 mm 1 in. Longitudinal 152 mm 6 in. 12 mm 0.5 in. Note 3Longitudinal sample spacing may be incr
15、eased to 305 mm 12.0 in. if a single sensor (scanner) is used. 4.3. Calculating Temperature DifferentialThe temperature differential of each thermal profile shall be computed automatically in both real-time and postprocessing using the data collected and stored on either internal or external storage
16、 media. The temperature differential shall be calculated as follows, unless otherwise specified by the owner-agency: 4.3.1. The computer shall be capable of calculating the temperature differential based on a complete or filtered data set, whereby either the operator indicates which temperatures or
17、sensor(s) to ignore, or a supplier-supplied algorithm determines whether specific temperature or sensor data is valid or not. Any supplier-supplied filtering algorithm or operator ignored sensor(s) must be approved by the owner-agency prior to use. 2014 by the American Association of State Highway a
18、nd Transportation Officials.All rights reserved. Duplication is a violation of applicable law.TS-5c PP 80-3 AASHTO 4.4. The operational computer software shall provide all necessary functions for the operator to select and perform roadway testing as required. The test software shall activate the tes
19、ting using the data collection properties stored by the selected project. The position points of each measurement shall be automatically determined using the project property inputs, distance sensor, and/or GPS. The software shall detect abnormal conditions in the status of each sensor and report th
20、e condition to the operator. These results must be automatically transferred to removable media during testing for redundancy of data recording and, if required by the owner-agency, sent to a remote server. Data logged in result files shall be encrypted in a manner to prevent tampering or manipulati
21、on. 4.5. The software shall also display in real time the thermal profile contour plot, total distance, location in terms of station and/or GPS coordinates, paver speed, time, and sensor status. The software shall automatically determine the temperature differential of each thermal profile and allow
22、 the operator access to review the summary indices while maintaining continuous thermal profile data collection. Automated thermal profile testing shall continue until the operator selects to stop data acquisition. Upon stopping data acquisition, the software shall provide a module to input the corr
23、ect ending distance or station should a distance sensor calibration error exist. When used, the software will employ a distance correction and normalize the data to the inputted true distance. 4.6. CalibrationThe equipment shall have built-in provisions to facilitate the calibration and verification
24、 of each infrared temperature sensor(s) signal, DMI, and GPS. These sensor(s) shall be calibrated at intervals not to exceed 12 months in conjunction with a calibration protocol. These recurrent calibrations shall ensure the accuracy of the data. 5. HARDWARE 5.1. General RequirementsThe thermal prof
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOPP802014STANDARDPRACTICEFORCONTINUOUSTHERMALPROFILEOFASPHALTMIXTURECONSTRUCTIONPDF

链接地址:http://www.mydoc123.com/p-417934.html