1、Standard Specification for Requirements for Mixing Plants for Hot-Mixed, Hot-Laid Bituminous Paving Mixtures AASHTO Designation: M 156-13 American Association of State Highway and Transportation Officials 444 North Capitol Street N.W., Suite 249 Washington, D.C. 20001TS-2c M 156-1 AASHTO Standard Sp
2、ecification for Requirements for Mixing Plants for Hot-Mixed, Hot-Laid Bituminous Paving Mixtures AASHTO Designation: M 156-13 1. SCOPE 1.1. This specification covers requirements for plants producing hot mix asphalt (HMA) or warm mix asphalt (WMA) paving mixtures. It may be used as a basis for stat
3、e certification or inclusion of an asphalt mixing plant on an agencys approved list. Additional requirements may also be specified by the agency. 2. REFERENCED DOCUMENTS 2.1. AASHTO Standards: R 66, Sampling Asphalt Materials T 19M/T 19, Bulk Density (“Unit Weight”) and Voids in Aggregate T 27, Siev
4、e Analysis of Fine and Coarse Aggregates T 30, Mechanical Analysis of Extracted Aggregate T 84, Specific Gravity and Absorption of Fine Aggregate T 166, Bulk Specific Gravity (Gmb) of Compacted Hot Mix Asphalt (HMA) Using Saturated Surface-Dry Specimens T 168, Sampling Bituminous Paving Mixtures T 2
5、09, Theoretical Maximum Specific Gravity (Gmm) and Density of Hot Mix Asphalt (HMA) T 283, Resistance of Compacted Asphalt Mixtures to Moisture-Induced Damage T 308, Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method T 312, Preparing and Determining the Density of
6、 Asphalt Mixture Specimens by Means of the Superpave Gyratory Compactor 3. TERMINOLOGY 3.1. batch planta manufacturing facility for producing asphalt paving mixtures in discrete production batches. Each batch includes specific proportions, by weight, of aggregate, asphalt binder, and other chosen ad
7、ditives. Each discrete batch is mixed and then discharged. 3.2. checka specific type of inspection or measurement performed on equipment or materials to indicate compliance with the stated criteria. Examples include (a) lime check, and (b) calibration check of cold feed system. 3.3. continuous mix p
8、lanta manufacturing facility for producing asphalt paving mixtures that continuously proportions the aggregate, asphalt binder, and other chosen additives into the mix by a continuous volumetric proportioning system without definite batch intervals. 2015 by the American Association of State Highway
9、and Transportation Officials.All rights reserved. Duplication is a violation of applicable law.TS-2c M 156-2 AASHTO 3.4. drum mix planta manufacturing facility for producing asphalt paving mixtures that continuously proportions the aggregate, heats and dries it in a rotating drum, adds any chosen ad
10、ditives, and simultaneously mixes the material with a controlled amount of asphalt binder. 3.5. hot mix plantany of the plants listed above that produce HMA or WMA. 3.6. interlocka system whereby plant production will be interrupted when any one of the interlocked raw material constituents fails to
11、meet the targeted requirements established within the specifications or plant requirements. 3.7. modified batch planta manufacturing facility for producing asphalt paving mixtures that continuously proportions the aggregate, asphalt binder, and other chosen additives into the mix by weighted batches
12、. The modified batch plant will usually have the screen decks removed. 4. PLANT REQUIREMENTS 4.1. Prerequisite for Plant Approval: 4.1.1. Inspection of EquipmentThe plant owner or manager shall schedule an inspection of the plant facilities to determine compliance with this specification. The equipm
13、ent shall be maintained in a satisfactory operating condition and be capable of its intended function at all times during production. 4.1.2. Quality Control ProgramEach plant shall have an approved quality control program and have a designated person to administer the program. This program shall inc
14、lude the testing and control of the individual component materials and the final product produced at the plant. Operations shall be conducted in a manner so that a uniform product is produced that will meet specified requirements. 4.1.3. Certified Public Weighers or Certified Public ScalesState or f
15、ederal requirements should dictate plant requirements related to Certified Public Weighers or Certified Public Scales. 4.1.4. UniformityThe plant must be capable of producing homogenous asphalt mixtures even though the individual components include such diverse materials as various sizes of aggregat
16、e from stockpiles, reclaimed asphalt pavement (RAP), reclaimed asphalt shingles (RAS), asphalt binder, and other admixtures, as required by the mix design. 4.2. Weight Measuring Systems: 4.2.1. Furnish (at the contractors expense) platform scales to weigh bulk asphalt plant mixtures, regardless of t
17、he type of weight measuring system used for payment. 4.2.2. Ensure that the documentation for platform scales complies with state or federal requirements. Platform scales shall be certified at a minimum every six months, or at a frequency required by state or federal requirements. Platform scales sh
18、all be certified if they are moved or relocated. 4.2.3. Each platform scale system should be capable of taring truck weights with each load. 4.2.4. When not using platform scales, provide calibrated weighing devices that record the mixtures net weight delivered to the truck. Weighing devices shall b
19、e calibrated at a frequency specified by the state. The weight of produced mixture should be verified periodically by platform scales. A net weigh system will include, but is not limited to, the following: 4.2.4.1. Hopper or batcher-type weigh system that delivers asphalt mixture directly to the tru
20、ck. 2015 by the American Association of State Highway and Transportation Officials.All rights reserved. Duplication is a violation of applicable law.TS-2c M 156-3 AASHTO 4.2.4.2. Fully automatic batching equipment with a digital recording device to save batch weights for project tickets. 4.2.5. The
21、weighing system used to determine the net weight shall have a printing system used in conjunction with automatic batching and mixing systems. All printing systems should be approved by the engineer. 4.2.6. Verify adequate installation of the net weight scale mechanism or device by the manufacturer t
22、o ensure acceptable performance and operation. 4.2.7. Provide information on the project tickets as required by the Agency or specifier. 4.2.8. Certify the accuracy of the weighing system by an approved registered scale service person at least once every six months or whenever the plant is moved or
23、relocated. Verify by an independent calibrated or certified scale the accuracy of the weighing system at the beginning of project production and thereafter as directed by the engineer. 4.2.9. Plants using batch scales shall maintain ten certified 50-lb (25-kg) standard test weights at the plant site
24、 to check batching accuracy. 4.3. Equipment for Preparation of Asphalt Binder: 4.3.1. Tanks for storage of asphalt binder must provide adequate capacity to ensure proper continuous circulation between the storage tank and proportioning units during the entire operating period. 4.3.2. The circulating
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOM1562013STANDARDSPECIFICATIONFORREQUIREMENTSFORMIXINGPLANTSFORHOTMIXEDHOTLAIDBITUMINOUSPAVINGMIXTURESPDF

链接地址:http://www.mydoc123.com/p-417673.html