1、Section 5 DRILLED PILES AND SHAFTS 5.1 DESCRIPTION This work shall consist of constructing drilled foun- dation shafts, with or without bell footings, including the placing of reinforcing steel and concrete all in accor- dance with the plans, these specifications and the special provisions. 5.2 SUBM
2、ITTALS 5.2.1 Contractor Qualifications (Recommended where permitted by state law) (a) The Contractor shall have a minimum of 3 years experience in constructing shaft foundations of similar size, depth and site conditions within the past 5 years. Prior to shaft construction the Contractor shall submi
3、t written documentation of the three years experience to the Engineer for verification and acceptance. The sub- mittal shall include at least three projects on which the Contractor has previously been engaged in shaft con- struction with satisfactory results. A brief description of each project and
4、the owners contact persons name and current phone number shall be included for each project listed. (b) On-site supervisors shall have a minimum 2 years experience in construction of shaft foundations, and drill operators shall have a minimum 1 year experi- ence. Prior to the start of work, the Cont
5、ractor shall submit a list identifying the on-site supervisors and drill operators who will be assigned on the project. The list shall contain a summary of each individuals experience. (c) The Engineer will approve or reject the Contrac- tors qualifications and field personnel within 10 work- ing da
6、ys after receipt of the submission. Work shall not be started on any shaft until the Contractors qualifica- tions are approved by the Engineer. The Engineer may suspend the shaft construction if the Contractor substi- tutes unqualified personnel. The Contractor shall be fully liable for the addition
7、al costs resulting from the suspension of work, and no adjustments in contract time resulting from the suspension of work will be allowed . (d) A shaft preconstruction conference will be held with the Contractor and Sub-Contractor (if applicable) prior to the start of shaft construction to discuss c
8、onstruction and inspection procedures. This conference will be scheduled by the Engineer after the Contractors submittals are approved by the Engineer. 5.2.2 Working Drawings When required by the special provisions, at least four weeks before work on shafts is to begin, the Contractor shall submit t
9、o the Engineer for review and approval, an installation plan for the construction of drilled shafts. The submittal shall include the following: (a) List of proposed equipment to be used including cranes, drills, augers, bailing buckets, final cleaning equipment, desanding equipment, slurry pumps, sa
10、m- pling equipment, tremies or concrete pumps, casing (including: casing dimensions, material and splice de- tails), etc. (b) Details of overall construction operation sequence and the sequence of shaft construction in bents or groups. (c) Details of shaft excavation methods, and final shaft dimensi
11、ons. (d) When slurry is required, details of the method pro- posed to mix, circulate and desand slurry and disposal (e) Details of methods to clean the shaft excavation, including the bottom of the shaft. (f) Details of reinforcement placement including sup- port and centralization methods. (g) Deta
12、ils of concrete placement, curing and protec- tion, that demonstrates contractors ability to perform concrete placement in the required time. (h) Other information shown on the plans or requested by the Engineer. (i) Concrete mixes, and mitigation of possible slump loss during placement at the site.
13、 of slurry. 499 500 HIGHWAY BRIDGES 5.2.2 The Contractor shall not start the construction of drilled shafts for which Contractor qualifications and working drawings are required until such submittals have been approved by the Engineer. Such approval will not re- lieve the Contractor of responsibilit
14、y for results obtained by use of these submittals or any other responsibilities under the contract. 5.3 MATERIALS 5.3.1 Concrete Concrete shall conform to the requirements of Section 8. The concrete shall be Class A unless otherwise specified. NOTE: The concrete mix for drilled shafts shall be fluid
15、, consolidate under self-weight, be resistant to seg- regation, and have a set time that will assure that fluid- ity is maintained throughout the shaft concrete place- ment, and removal of temporary casing. The time for initial set of the shaft concrete should generally not ex- ceed 12 hours. 5.3.2
16、Reinforcing Steel Reinforcing steel shall conform to the requirements of Section 9, “Reinforcing Steel.” 5.3.3 Casings Casings which are required to be incorporated as part of the permanent work shall conform to the requirements of Section 11, “Steel Structures.” Steel shall be AASHTO M 183 (ASTM A
17、36), AASHTO M 270 (ASTM A 709) Grade 36, or ASTM A 252, Grade 2 or 3 unless otherwise specified. 5.4 CONSTRUCTION 5.4.1 Protection of Existing Structures All precautions shall be taken to prevent damage to ex- isting structures and utilities. These measures shall in- clude but are not limited to, se
18、lecting construction meth- ods and procedures that will prevent excessive caving of the shaft excavation, monitoring, and controlling the vi- brations from the driving of casing or sheeting, drilling of the shaft or from blasting, if permitted. 5.4.3 General Methods and Equipment Excavations require
19、d for shafts and bell footings shall be constructed to the dimensions and elevations shown on the plans. The methods and equipment used shall be suitable for the intended purpose and materials encoun- tered. Generally either the dry method, wet method, tem- porary casing method, or permanent casing
20、method will be used as necessary to produce sound, durable concrete foundation shafts free of defects. The permanent casing method shall be used only when required by the plans or authorized by the Engineer. When a particular method of construction is required on the plans, that method shall be used
21、. If no particular method is specified for use, the Contractor shall select and use the method, as determined by site conditions, subject to approval of the Engineer, that is needed to properly accomplish the work. The excavation shall be completed in a continuous operation. If the excavation operat
22、ion is stopped, the shaft cavity shall be protected by installation of a safety cover. It shall be the Contractors responsibility to en- sure the safety of the shaft excavation, surrounding soil and the stability of the side walls. A temporary casing, slurry or other methods approved by the Engineer
23、 shall be used if necessary to ensure such safety and stability. Excavations shall not be left open overnight unless cased full depth. The Contractor shall use appropriate means such as a cleanout bucket or air lift to clean the bottom of the excavation of all shafts. When unexpected obstructions ar
24、e encountered, the Contractor shall notify the Engineer promptly. The removal of such obstructions, and the construction of excavation shall be as directed by the Engineer. 5.4.4 Dry Construction Method The dry construction method shall be used only at sites where the groundwater table and site cond
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOHB17DIVISIONIISEC52002DIVISIONIICONSTRUCTIONDRILLEDPILESANDSHAFTS 钻孔 竖井 PDF

链接地址:http://www.mydoc123.com/p-417600.html