1、Section 4 DRIVEN FOUNDATION PILES 4.1 DESCRIPTION This work shall consist of furnishing and driving foun- dation piles of the type and dimensions designated on the plans or in the special provisions including cutting off or building up foundation piles when required. This specifi- cation also covers
2、 providing test piles and performing loading tests. Piling shall conform to and be installed in accordance with these specifications, and at the location, and to the elevation, penetration, and bearing capacity shown on the plans or as directed by the Engineer. Any improperly driven, broken, or othe
3、rwise defective pile shall be corrected to the satisfaction of the Engineer by removal and replacement, or the driving of an addi- tional pile, at no extra cost. Except when test piles are required, the Contractor shall furnish the piles in accordance with the dimensions shown on the plans or specia
4、l provisions. When test piles are required, the pile lengths shown on the plans are for estimating purposes only and the actual lengths to be fur- nished for production piles will be determined by the En- gineer after the test piles have been driven. The lengths given in the Engineers order list wil
5、l include only the lengths anticipated for use in the completed structure. The Contractor shall, without added compensation, increase the lengths shown or ordered to provide for fresh heading and for such additional length as may be necessary to suit the method of operation. 4.2 MATERIALS 4.2.1 Stee
6、l Piles The structural steel used for foundation piling shall conform to the Specification for Structural Steel for Bridges, AASHTO M 270 (ASTM A 709) Grades 36,50, or 50W, or to the Specification for Piling for Use in Ma- rine Environment, ASTM A 690. 4.2.1.1 Painting Unless otherwise provided, whe
7、n steel piles or steel pile shells extend above the ground surface or water sur- face they shall be protected by the paint system specified for painting new steel in a high pollution or coastal envi- ronment as described in Section 13, “Painting.” This pro- tection shall extend from an elevation 2 f
8、eet below the water or ground surface to the top of the exposed steel. 4.2.2 Timber Piles Timber piles shall conform to the requirements of the Specification for Wood Products, AASHTO M 168. Tim- ber piles shall be treated or untreated as indicated on the plans or in the special provisions. Preserva
9、tive treatment shall conform to the requirements of Section 17, “Preserv- ative Treatment of Wood.” The method of storing and handling shall be such as to avoid injury to the piles. Special care shall be taken to avoid breaking the surface of treated piles. Canthooks, dogs, or pike-poles shall not b
10、e used. Cuts or breaks in the surface of treated piling and bolt holes shall be treated as specified in Article 16.3.3, “Treated Timber.” 4.2.3 Concrete Piles Concrete piles shall consist of either precast concrete piles or cast-in-place concrete piles cast in steel shells. Portland cement concrete
11、shall conform to the require- ments in Section 8, “Concrete Structures,” and unless an- other class is shown on the plans or specified, concrete shall be Class A. Reinforcing steel shall conform to the re- quirements of Section 9, “Reinforcing Steel,” and pre- stressing shall conform to the requirem
12、ents of Section 10, “Prestressing.” Steel shells for cast-in-place concrete piles shall be of not less than the thickness shown on the plans. The Con- tractor shall furnish shells of greater thickness if necessary to provide sufficient strength and rigidity to permit dri- ving with the equipment sel
13、ected for use without damage, and to prevent distortion caused by soil pressures or the driving of adjacent piles. The shells shall also be water- tight to exclude water during the placing of concrete. The shells may be cylindrical or tapered, step-tapered, or a combination of either, with cylindric
14、al sections. 489 490 HIGHWAY BRIDGES 4.3 4.3 MANUFACTURE OF PILES 4.3.1 Precast Concrete Piles 4.3.1.1 Forms Forms for precast concrete piles shall conform to the general requirements for concrete form work as provided in Section 3, “Temporary Works.” Forms shall provide ac- cess for vibration and c
15、onsolidation of the concrete. 4.3.1.5.1 Working Drawings The Contractor shall submit two sets of working drawings to the Engineer at the job site for prestressed concrete piles. Said drawings shall show the pile dimen- sions, materials, prestressing methods, tendon arrange- ment and prestressing for
16、ces proposed for use and, any addition or rearrangement of reinforcing steel from that shown on the plans. Construction of the piles shall not begin until the drawings have been approved by the Engineer. 4.3.1.2 Casting 4.3.1.6 Storage and Handling Handling and placing of concrete shall conform to t
17、he requirements of Section 8, “Concrete Structures,” and these specifications. Special care shall be taken to place the concrete so as to produce satisfactory bond with the reinforcement and avoid the formation of “stone pockets,” honeycomb, or other such defects. To secure uniformity, the concrete
18、in each pile shall be placed continuously and shall be compacted by vibrating or by other means acceptable to the Engineer. The forms shall be overfilled, the surplus concrete screeded off, and the top surfaces finished to a uniform, even texture simi- lar to that produced by the forms. 4.3.1.3 Fini
19、sh Portions of piling exposed to view shall be finished in accordance with the provisions governing the finishing of concrete columns. Other piling shall not be finished ex- cept as set forth above. Removal of forms, curing, storing, transporting, and handling of precast concrete piles shall be done
20、 in such a manner as to avoid excessive bending stresses, cracking, spalling, or other injurious results. Piles to be used in sea water or in sulfate soils shall be handled so as to avoid surface abrasions or other injuries exposing the interior concrete. 4.3.2 Cast-in-Place Concrete Piles 4.3.2.1 I
21、nspection of Metal Shells At all times prior to the placing of concrete in the driv- en shells, the Contractor shall have available a suitable light for the inspection of each shell throughout its entire length. 4.3.2.2 Placing Concrete 4.3.1.4 Curing and Protection Concrete piles shall be cured as
22、provided in Section 8, “Concrete Structures,” and these Specifications. As soon as the piles have set sufficiently to avoid damage, they shall be removed from the forms and stacked in a curing pile separated from each other by wood-spacing blocks. No pile shall be driven until at least 21 days after
23、 casting and, in cold weather, for a longer period as determined by the Engineer. Concrete piles for use in sea water or sulfate soils shall be cured for not less than 30 days before being used. Concrete shall be protected from freezing until the compressive strength reaches at least 0.8 f;. 4.3.1.5
24、 Prestressing Prestressing of concrete piles shall conform to the pro- visions of Section 10, “Prestressing.” No concrete shall be placed until all driving within a radius of 15 feet of the pile has been completed, or all driving within the above limits shall be discontinued until the concrete in th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AASHTOHB17DIVISIONIISEC42002DIVISIONIICONSTRUCTIONDRIVENFOUNDATIONPILES 打入 PDF

链接地址:http://www.mydoc123.com/p-417599.html