ACI 224.3R ERTA-2008 Joints in Concrete Construction.pdf
《ACI 224.3R ERTA-2008 Joints in Concrete Construction.pdf》由会员分享,可在线阅读,更多相关《ACI 224.3R ERTA-2008 Joints in Concrete Construction.pdf(1页珍藏版)》请在麦多课文档分享上搜索。
1、 ERRATA ACI 224.3R-95 Joints in Concrete Construction 1stprinting Reported by ACI Committee 224 Page 34, Section 8.5, second to last paragraph should be removed. Revised as: Wall construction joints should be spaced at 15- to 25-ft (4.5- to 7.5-m) intervals, with the first joint occurring 15 ft (4.5
2、 m) from the corner of the structure (PCA 1984). Construction joints should also be located where abrupt changes in thickness occur in walls. Walls with frequent openings should have construction joint spacing limited to 20 ft (6 m). Page 35, Section 8.5, last paragraph, revised as: Keyways are ofte
3、n provided in wall-to-footing construction joints, especially if no reinforcement holds the wall and footing together (PCA 1984). The keyway can be formed by pressing a slightly beveled 2-x-4 (50-x-200 mm, nominal) into the fresh footing concrete. The keyway 2-x-4 should be oiled well before it is used so it can be removed after the concrete has hardened. Updated on 1/31/08 2:15 p.m.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ACI2243RERTA2008JOINTSINCONCRETECONSTRUCTIONPDF

链接地址:http://www.mydoc123.com/p-401115.html