ABS 4 NOTICE 1-2017 RULES FOR BUILDING AND CLASSING STEEL VESSELS FOR SERVICE ON RIVERS AND INTRACOASTAL WATERWAYS 2017.pdf
《ABS 4 NOTICE 1-2017 RULES FOR BUILDING AND CLASSING STEEL VESSELS FOR SERVICE ON RIVERS AND INTRACOASTAL WATERWAYS 2017.pdf》由会员分享,可在线阅读,更多相关《ABS 4 NOTICE 1-2017 RULES FOR BUILDING AND CLASSING STEEL VESSELS FOR SERVICE ON RIVERS AND INTRACOASTAL WATERWAYS 2017.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、 RULES FOR BUILDING AND CLASSING STEEL VESSELS FOR SERVICE ON RIVERS AND INTRACOASTAL WATERWAYS 2017 NOTICE NO. 1 JULY 2017 The following Rule Changes were approved by the ABS Rules Committee on 30 May 2017 and become EFFECTIVE AS OF 1 JULY 2017. (See http:/www.eagle.org for the consolidated version
2、 of the Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways, 2017, with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construc
3、tion, unless otherwise noted. (See 1-1-4/3.3 of the ABS Rules for Conditions of Classification (Part 1).) PART 4 VESSEL SYSTEMS AND MACHINERY CHAPTER 2 PROPULSION AND MANEUVERING MACHINERY SECTION 3 STEERING GEARS 3 Steering Gears for Passenger Vessels Over 100 Gross Tons or Carrying More than 150 P
4、assengers 3.25 Controls (Add new Subparagraph 4-2-3/3.25.6, as follows:) 3.25.6 System Response Under Failure (1 July 2017) The failures (as listed, but not limited to items in 4-2-3/3.27) likely to cause uncontrolled movements of rudder are to be clearly identified. In the event of detection of suc
5、h failure, the rudder should stop in the current position. Alternatively, the rudder may be set to return to the midship/neutral position. Failure Mode and Effect Analysis methodology may be used to identify the failures. 3.27 Instrumentation and Alarms (Revise Subparagraph 4-2-3/3.27.6, as follows:
6、) 3.27.6 Low Oil-level Alarm (1 July 2017) A visual and audible alarm is to be given on the navigation bridge and engine room control station to indicate a low oil level in any power unit reservoir. The operation of this alarm is not to interrupt the power supply circuit. ABSRULES FOR BUILDING AND C
7、LASSING STEEL VESSELS FOR SERVICE ON RIVERS & INTRACOASTAL WATERWAYS .2017 1 Notice No. 1 July 2017 (Add new Subparagraph 4-2-3/3.27.11, as follows:) 3.27.11 Earth Fault (1 July 2017) A visual and audible alarm is to be given on the navigation bridge to indicate an earth fault on AC and DC circuits
8、(Add new Subparagraph 4-2-3/3.27.12, as follows:) 3.27.12 Deviation (1 July 2017) Where arrangements discussed in 4-2-3/3.27.7, 4-2-3/3.27.8, 4-2-3/3.27.9 and 4-2-3/3.27.10 can lead to reduced or erroneous system performance of the commanded change in rudder angle, a deviation alarm visible and audi
9、ble at the navigating bridge shall be initiated if the rudders actual position does not reach the set point within acceptable time limits for the closed loop control systems (e.g., follow-up control, computer based systems, and autopilot). Deviation alarm may be caused by mechanical, hydraulic or el
10、ectrical failures. See 4-2-3/3.27.7, 4-2-3/3.27.8, 4-2-3/3.27.9 and 4-2-3/3.27.10 for acceptable time limits or angle deviations, as applicable. PART 4 VESSEL SYSTEMS AND MACHINERY CHAPTER 3 PUMPS AND PIPING SYSTEMS SECTION 1 GENERAL 7 General Installation Details (Revise Paragraph 4-3-1/7.21, as fo
11、llows:) 7.21 Hose (1 July 2017) Hose assemblies may be installed between two points where flexibility is required but are not to be subject to torsional deflection (twisting) under normal operating conditions. In general, hose is to be limited to the length necessary to provide for flexibility and f
12、or proper operation of machinery. Burst pressure of the hose is not to be less than four times the relief valve setting. Where the use of non-metallic hose is permitted, the hose materials are to be suitable for the intended service. Hoses for oil service are to be fire resistant and reinforced with
13、 wire braid or other suitable material. Flexible hose assemblies constructed of non-metallic materials intended for installation in piping systems for flammable media and sea water systems where failure may result in flooding, are to be of a fire-resistant type*, except in cases where such hoses are
14、 installed on open decks having no fire risk, and not used for fuel oil lines. Fire resistance is to be demonstrated by testing to ISO 15540 and ISO 15541. * Note: The installation of a shutoff valve immediately upstream of a sea water hose does not satisfy the requirement for fire-resistant type ho
15、se. A hose is to be complete with factory assembled end fittings or factory supplied end fittings installed in accordance with manufacturers procedures. The use of non-metallic hoses which are not provided with factory assembled end fittings will be considered for non-combustible and non-toxic, Grou
16、p II piping systems under 5.2 bar (5.3 kgf/cm2, 75 psi) in pipe sizes up to 114.3 mm O.D. (4 in. NPS). Such hoses are to be located in accessible locations and secured by means of at least two stainless-steel hose clamps at each end. Such clamps are to be at least 12 cm (0.5 in.) wide and are not to
17、 be dependent on spring tension to remain fastened. 2 ABSRULES FOR BUILDING AND CLASSING STEEL VESSELS FOR SERVICE ON RIVERS & INTRACOASTAL WATERWAYS .2017 Notice No. 1 July 2017 PART 4 VESSEL SYSTEMS AND MACHINERY CHAPTER 5 ELECTRICAL INSTALLATIONS SECTION 2 SHIPBOARD SYSTEMS 7 Distribution System
18、(Revise Paragraph 4-5-2/7.9, as follows:) 7.9 Harmonics (1 July 2017) The total harmonic distortion (THD) in the voltage waveform in the distribution systems is not to exceed 8% and any single order harmonics not to exceed 5%. Other higher values may be accepted provided the distribution equipment a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS4NOTICE12017RULESFORBUILDINGANDCLASSINGSTEELVESSELSFORSERVICEONRIVERSANDINTRACOASTALWATERWAYS2017PDF

链接地址:http://www.mydoc123.com/p-400878.html