ABS 220-2015 GUIDE FOR CARRIAGE OF INTEGRAL REFRIGERATED CONTAINERS ON BOARD SHIPS.pdf
《ABS 220-2015 GUIDE FOR CARRIAGE OF INTEGRAL REFRIGERATED CONTAINERS ON BOARD SHIPS.pdf》由会员分享,可在线阅读,更多相关《ABS 220-2015 GUIDE FOR CARRIAGE OF INTEGRAL REFRIGERATED CONTAINERS ON BOARD SHIPS.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、 Guide for Carriage of Integral Refrigerated Containers on Board Ships GUIDE FOR CARRIAGE OF INTEGRAL REFRIGERATED CONTAINERS ON BOARD SHIPS 15 DECEMBER 2015 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright 2015 American Bureau of Shipping ABS Pl
2、aza 16855 Northchase Drive Houston, TX 77060 USA Foreword Foreword This Guide provides the evaluation procedure and technical requirements to verify the eligibility of a Container Carrier for the optional notation IRCC-SP xxx/xx (Integral Refrigerated Container Carrier Stowage Positions). This Guide
3、 becomes effective on 15 December 2015. Users are advised to check periodically on the ABS website www.eagle.org to verify that this version of this Guide is the most current. We welcome your feedback. Comments or suggestions can be sent electronically by email to rsdeagle.org. ii ABSGUIDE FOR CARRI
4、AGE OF INTEGRAL REFRIGERATED CONTAINERS ON BOARD SHIPS .2015 ABSGUIDE FOR CARRIAGE OF INTEGRAL REFRIGERATED CONTAINERS ON BOARD SHIPS .2015 iii Table of Contents GUIDE FOR CARRIAGE OF INTEGRAL REFRIGERATED CONTAINERS ON BOARD SHIPS CONTENTS SECTION 1 Introduction 1 1 General . 1 3 Definitions . 1 5
5、References 1 7 Vessels Not Built Under Survey 2 9 Alternative Designs . 2 SECTION 2 Technical Requirements for Notation IRCC-SP xxx/xx . 3 1 Plans and Data to be Submitted . 3 1.1 Ventilation Arrangements and Calculations . 3 1.3 Hold Space Plans 3 1.5 Electrical Plans 3 1.7 Other Plans . 3 3 Design
6、 Conditions . 4 5 Air Supply for Container Holds . 4 5.1 Air Supply Calculation for Container Holds Designed for the Carriage of Integral Refrigerated Containers using Air-cooled Condensers . 4 5.3 Air Supply to Container Holds Designed for the Carriage of Integral Refrigerated Containers using Wate
7、r-cooled Condensers . 5 7 Air Ventilation Systems . 5 7.1 Air Ducting and Air Distribution 5 7.3 Air Inlets and Outlets on Deck . 5 7.5 Supply Air Fans for Container Holds . 6 7.7 Heat Dissipation from Integral Refrigerated Containers Stowed on Deck . 6 9 Cooling Water Systems 6 11 Access to Contain
8、ers for Monitoring and Repairs 6 13 Electric Systems . 7 13.1 Electrical Power Supply . 7 13.3 Generator Capacity . 7 13.5 Electrical Installation 7 15 Monitoring, Alarms, and Indicators . 8 17 Automatic Control . 8 19 Fire Protection . 8 21 Bilge and Drainage Arrangement . 8 TABLE 1 Instrumentation
9、 and Displays 8 SECTION 3 Survey Requirements . 9 1 Surveys During Construction 9 1.1 Testing of Air Duct Systems 9 1.3 Inspection and Testing of Related Systems . 9 3 Surveys After Construction . 9 APPENDIX 1 Power Demand for Mixed Cargo . 10 FIGURE 1 Electrical Demand for Ventilation System based
10、on 40-Foot EU Containers . 10 FIGURE 2 Electrical Demand for Ventilation System based on 20-Foot EU Containers . 11 FIGURE 3 Electrical Demand for Generator and Power Distribution Systems based on 40-Foot EU Containers 11 FIGURE 4 Electrical Demand for Generator and Power Distribution Systems based
11、on 20-Foot EU Containers 12 iv ABSGUIDE FOR CARRIAGE OF INTEGRAL REFRIGERATED CONTAINERS ON BOARD SHIPS .2015 Section 1: Introduction SECTION 1 Introduction 1 General The provisions of this Guide apply to container ships equipped to transport integral refrigerated containers. Where cargo is carried
12、in refrigerated containers of plug-in or integral types which have their own individually mounted refrigeration machinery, hence requiring shipboard electrical power supply and in some cases the cooling water supply for the condensers, and, where fitted, the associated temperature monitoring and con
13、trol system, the Record will give the total number of refrigerated containers onboard, the total design load in kW and the type of temperature monitoring and control system installed. Section 2 of this Guide provides the technical requirements for the optional notation: IRCC-SP xxx/xx (Integral Refr
14、igerated Container Carrier Stowage Positions) for container ships. When requested by the Owner, the systems and arrangements for stowage of integral refrigerated containers may be verified for compliance with the requirements outlined in Section 2 of this Guide. The Class Notation IRCC-SP xxx/xx is
15、supplemented by two figures, the first of which stands for the number of certified integral refrigerated container stowage positions and the second figure for the percentage of containers carrying fruit/chilled cargoes. For example, IRCC-SP 940/35 designates that the ship is capable of the simultane
16、ous carriage of 940 integral refrigerated cargo containers arranged on deck and/or in container holds, and a maximum of 35% of those cargo containers may be loaded with fruit or chilled cargoes. The number of integral refrigerated containers is based on FEU (forty foot equivalent units). Details con
17、cerning other container sizes, stowage positions and special conditions will be stipulated in the Class Record. The requirements in this Guide are in addition to the classification requirements for ships contained in the ABS Rules for Building and Classing Steel Vessels (Steel Vessel Rules). 3 Defin
18、itions Integral Refrigerated Container. A standard container with a self-contained refrigeration system, located within the outer dimensions of the container, which can be driven by electrical power fed from an external power supply. The refrigeration system may be either a “clip-on” or an integral
19、type of cooling unit. Container Plug-in Point. An electrical socket located at each container location on deck and each cell location below the deck which is in accordance with ISO 1496-2. Hold Space. An enclosed space containing refrigerated containers. The containers are restrained within cell gui
20、des. If the ship is “open hatch” type, the hold space refers to the space below the hatch coamings. Container Cell. This is the position of an individual container. It is typically located within a set of vertical cell guides and is normally enclosed by transverse stringers located above and below t
21、he container. 5 References The following Rules, Guides, Codes and Standards are referenced in this Guide: ABS Rules for Building and Classing Steel Vessels (Steel Vessel Rules) ABSGUIDE FOR CARRIAGE OF INTEGRAL REFRIGERATED CONTAINERS ON BOARD SHIPS .2015 1 Section 1 Introduction 7 Vessels Not Built
22、 Under Survey Vessels intended for the carriage of integral refrigerated containers, which have not been constructed under survey by the Surveyors, but which have been subsequently surveyed at the request of the Owners, satisfactorily reported upon by the Surveyor, and which comply with the requirem
23、ents of this Guide, will be distinguished in the Record by the notation, as appropriate, but the mark signifying survey during construction will be omitted. 9 Alternative Designs Design arrangements modified from those which have already been proved suitable in service on board ships are subject to
24、ABSs approval. For these installations and arrangements, ABS may require additional requirements regarding the documentation to be submitted for approval and the extent of testing. If this Class Notation is applied for ships other than container ships, it will be given special consideration. 2 ABSGU
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS2202015GUIDEFORCARRIAGEOFINTEGRALREFRIGERATEDCONTAINERSONBOARDSHIPSPDF

链接地址:http://www.mydoc123.com/p-400817.html