API RP 52-1995 Land Drilling Practices for Protection of the Environment (Second Edition)《陆上钻井保护环境的作法.第2版》.pdf
《API RP 52-1995 Land Drilling Practices for Protection of the Environment (Second Edition)《陆上钻井保护环境的作法.第2版》.pdf》由会员分享,可在线阅读,更多相关《API RP 52-1995 Land Drilling Practices for Protection of the Environment (Second Edition)《陆上钻井保护环境的作法.第2版》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、Land Drilling Practices for Protection of the EnvironmentAPI RECOMMENDED PRACTICE 52SECOND EDITION, JULY 1, 1995REAFFIRMED, SEPTEMBER 2010Land Drilling Practices for Protection of the EnvironmentExploration and Production DepartmentAPI RECOMMENDED PRACTICE 52SECOND EDITION, JULY 1, 1995REAFFIRMED, S
2、EPTEMBER 2010SPECIAL NOTES API publications necessarily address problems of a general nature. With respect to par- ticular circumstances, local, state, and federal laws and regulations should be reviewed. API is not undertaking to meet the duties of employers, manufacturers, or suppliers to warn and
3、 properly train and equip their employees, and others exposed, concerning health and safety risks and precautions, nor undertaking their obligations under local, state, or fed- eral laws. Information concerning safety and health risks and proper precautions with respect to particular materials and c
4、onditions should be obtained from the employer, the manufac- turer or supplier of that material, or the material safety data sheet. Nothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, or use of any method, apparat
5、us, or product covered by letters patent. Neither should anything contained in the publication be construed as insuring anyone against liability for infringement of letters patent. Generally, API standards are reviewed and revised, reaffirmed, or withdrawn at least ev- ery 5 years. Sometimes a one-t
6、ime extension of up to two years will be added to this re- view cycle. This publication will no longer be in effect 5 years after its publication date as an operative API standard or, where an extension has been granted, upon republication. Status of the publication can be ascertained from the API A
7、uthoring Department telephone (214) 953-1 1011. A catalog of API publications and materials is published annually and up- dated quarterly by API, 1220 L Street, N.W., Washington, D.C. 20005. This document was produced under API standardization procedures that ensure appro- priate notification and pa
8、rticipation in the developmental process and is designated as an API standard. Questions concerning the interpretation of the content of this standard or comments and questions concerning the procedures under which this standard was devel- oped should be directed in writing to the director of the Ex
9、ploration and Production De- partment, American Petroleum Institute, 700 North Pearl, Suite 1840, Dallas, Texas 75201. Requests for permission to reproduce or translate all or any part of the material published herein should also be addressed to the director. API publications may be used by anyone d
10、esiring to do so. Every effort has been made by the Institute to assure the accuracy and reliability of the data contained in them; however, the Institute makes no representation, warranty, or guarantee in connection with this pub- lication and hereby expressly disclaims any liability or responsibil
11、ity for loss or damage resulting from its use or for the violation of any federal, state, or municipal regulation with which this publication may conflict. API standards are published to facilitate the broad availability of proven, sound engi- neering and operating practices. These standards are not
12、 intended to obviate the need for ap- plying sound engineering judgment regarding when and where these standards should be utilized. The formulation and publication of API standards is not intended in any way to inhibit anyone from using any other practices. Any manufacturer marking equipment or mat
13、erials in conformance with the marking requirements of an API standard is solely responsible for complying with all the applicable requirements of that standard. API does not represent, warrant, or guarantee that such prod- ucts do in fact conform to the applicable API standard. Copyright O 1995 Ame
14、rican Petroleum Institute API RP+52 95 0732290 0558902 3T3 CONTENTS Page O INTRODUCTION 1 1 SCOPE . 1 2 REFERENCES . 1 2.1 Standards . 1 2.2 Other References . 1 2.3 U.S. Environmental Laws 1 2.3.1 Clean Air Act (CAA) . 1 2.3.2 Clean Water Act (CWA) . 2 2.3.3 Safe Drinking Water Act (SDWA) . 2 2.3.4
15、 Resource Conservation and Recovery Act (RCRA) 3 Liability Act (CERCLA) . 3 2.3.5 Comprehensive Environmental Response, Compensation, and 2.3.6 Emergency Planning and Community Right-to-Know Act (EPCRA) . 3 2.3.8 Endangered Species Act . 4 2.3.9 Hazardous Materials Transportation Act (HMTA) . 4 2.3.
16、11 Oil Pollution Act of 1990 (OPA 90) . 4 2.3.1 2 Other Laws and Regulations . 4 3 ACRONYMS AND ABBREVIATIONS . 4 4 PLANNING . 5 2.3.7 National Historic Preservation Act (NHPA) 4 2.3.10 National Environmental Policy Act (NEPA) 4 4.1 Interactive Communications and Planning . 5 4 . 1 . 1 Communication
17、s Between Operator and Surface Owner or Tenant . 5 4.1.3 Internal Communications 6 4.2.1 Public Safety 6 4.2.2 Size . 6 4.2.3 Topography . 6 4.2.4 Soil . 6 4.2.5 Surface Water . 6 4.2.6 Groundwater 6 4.2.7 Wildlife 6 4.2.8 Livestock . 6 4.2.9 Vegetation 6 4.2.10 Cultural and Historical Resources 6 4
18、.2.11 Weather . 7 4.2.12 Operational Plans . 7 4.2.13 Potential Hazards . 7 4.2.14 Restoration 7 4.2.15 Dust Suppression . 7 4.2.16 Noise Suppression . 7 4.2.17 Storage Areas 7 4.2.18 Sanitation Systems 7 4.3.1 Reserve Pit Design . 7 4.3.2 Solids Removal Equipment . 7 4.1.2 Operator, Contractor, and
19、 Service Company Communications . 5 4.2 Site Assessment and Construction Planning 6 4.3 Drilling Fluids and Solids Control Planning 7 4.3.3 Drilling Fluid Additives . 7 4.4 Water Management Planning . 7 4.4.1 Rig Wash Water 8 4.4.2 Storm Water 8 4.5 Waste Management Planning . 8 5 DRILLING SITE AND
20、RIGHT-OF-WAY PREPARATION 8 5.1 Introduction . 8 5.2 Site Construction . 8 5.3 Move In and Rig Up 9 5.3.1 Equipment Preparation Prior to Moving . 9 5.3.2 Site Inspection . 9 5.3.3 Special Considerations-Air Drilling Operations . 9 5.3.4 Pressure Control Equipment 9 5.3.5 Sanitation Equipment . 9 5.3.
21、6 Location Housekeeping . 9 6 DRILLINGOPERATIONS . 10 6.1 Pollution Prevention Hierarchy 10 6.1.1 Source Reduction 10 6.1.2 Recycling 10 6.1.3 Treatment 10 6.1.4 Disposal 10 6.2 Review of Drilling Plan Prior to Spud 10 6.3 Drilling Fluid System . 10 6.4 Formation Pressure Control 11 6.5 Hazardous Wa
22、stes 11 6.6 Location and Right-of-way Maintenance 11 6.7 Drillstring . 11 7 COMPLETION, TESTING, AND PLUGGING AND ABANDONMENT OPERATIONS . 11 7.1 General 11 7.2 Completion Operations 11 7.2.1 Logging 11 7.2.2 Completion Fluids and Chemicals . 12 7.2.3 Production Casing and Tubing 12 7.2.4 Cementing
23、12 7.2.5 Perforating 12 7.2.6 Acidizing . 12 7.2.7 Fracturing Stimulation 12 7.2.8 Completion Fluid Filtration 12 7.3 Testing . 12 7.4 Plugging and Abandonment 13 8 DECOMMISSIONING 13 8.1 Chemical and Waste Disposal . 13 8.2 Contaminated Soil 13 8.3 Location Restoration 13 iV API RP*52 95 0732290 05
24、58904 L7b FOREWORD API Recommended Practice 52, First Edition, was issued in February 1976. This recommended practice was prepared by the Subcommittee on Land Drilling hac- tices for Protection of the Environment and is under administration of the American Petroleum Institute Exploration and Product
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APIRP521995LANDDRILLINGPRACTICESFORPROTECTIONOFTHEENVIRONMENTSECONDEDITION 陆上 钻井 保护环境 作法 PDF

链接地址:http://www.mydoc123.com/p-400129.html