BS ISO 7870-5-2014 en_6237 Control charts Specialized control charts《控制图 专用控制图》.pdf
《BS ISO 7870-5-2014 en_6237 Control charts Specialized control charts《控制图 专用控制图》.pdf》由会员分享,可在线阅读,更多相关《BS ISO 7870-5-2014 en_6237 Control charts Specialized control charts《控制图 专用控制图》.pdf(62页珍藏版)》请在麦多课文档分享上搜索。
1、BSI Standards Publication BS ISO 7870-5:2014 Control charts Part 5: Specialized control chartsBS ISO 7870-5:2014 BRITISH STANDARD National foreword This British Standard is the UK implementation of ISO 7870-5:2014. The UK participation in its preparation was entrusted to Technical Committee SS/4, St
2、atistical Process Management. A list of organizations represented on this committee can be obtained on request to its secretary. This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application. The British Standards Instituti
3、on 2014. Published by BSI Standards Limited 2014 ISBN 978 0 580 68961 1 ICS 03.120.30 Compliance with a British Standard cannot confer immunity from legal obligations. This British Standard was published under the authority of the Standards Policy and Strategy Committee on 31 January 2014. Amendment
4、s issued since publication Date Text affectedBS ISO 7870-5:2014 ISO 2014 Control charts Part 5: Specialized control charts Cartes de contrle Partie 5: Cartes de contrle particulires INTERNATIONAL STANDARD ISO 7870-5 First edition 2014-01-15 Reference number ISO 7870-5:2014(E)BS ISO 7870-5:2014ISO 78
5、70-5:2014(E)ii ISO 2014 All rights reserved COPYRIGHT PROTECTED DOCUMENT ISO 2014 All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on the inte
6、rnet or an intranet, without prior written permission. Permission can be requested from either ISO at the address below or ISOs member body in the country of the requester. ISO copyright office Case postale 56 CH-1211 Geneva 20 Tel. + 41 22 749 01 11 Fax + 41 22 749 09 47 E-mail copyrightiso.org Web
7、 www.iso.org Published in SwitzerlandBS ISO 7870-5:2014ISO 7870-5:2014(E) ISO 2014 All rights reserved iii Contents Page Foreword iv Introduction v 1 Scope . 1 2 Normative references 1 3 T erms and definitions . 1 4 Symbols and abbreviated terms . 4 4.1 Symbols . 4 4.2 Abbreviated terms . 5 5 Specia
8、lized control charts . 5 6 Moving average and moving range control charts . 5 6.1 Control limits 6 6.2 Interpretation 6 6.3 Advantages . 6 6.4 Limitations 6 6.5 Example . 6 7 z- chart. 9 7.1 Control limits 9 7.2 Advantages 10 7.3 Limitations .10 7.4 Example 10 8 Group control chart 10 8.1 Control li
9、mits .12 8.2 Advantages 12 8.3 Limitations .13 8.4 Example 13 9 High-low control chart .16 9.1 Control limits .16 9.2 Interpretation .17 9.3 Advantages 17 9.4 Limitations .17 9.5 Example 17 10 Trend control chart .19 10.1 Control limits .20 10.2 Advantages 20 10.3 Limitations .21 10.4 Example 21 11
10、C ontr ol chart for c oefficient of v ariation .24 11.1 Control limits .24 11.2 Advantage .24 11.3 Limitation .24 11.4 Example 25 12 Control chart for non-normal data .26 12.1 Control limits .27 12.2 Example 28 13 Standardized p- chart .32 13.1 Control limits .34 13.2 Advantages and limitations .34
11、13.3 Example 34BS ISO 7870-5:2014ISO 7870-5:2014(E) Foreword ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Ea
12、ch member body interested in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the Internatio
13、nal Electrotechnical Commission (IEC) on all matters of electrotechnical standardization. The procedures used to develop this document and those intended for its further maintenance are described in the ISO/IEC Directives, Part 1. In particular the different approval criteria needed for the differen
14、t types of ISO documents should be noted. This document was drafted in accordance with the editorial rules of the ISO/IEC Directives, Part 2 (see www.iso.org/directives). Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. ISO shall n
15、ot be held responsible for identifying any or all such patent rights. Details of any patent rights identified during the development of the document will be in the Introduction and/or on the ISO list of patent declarations received (see www.iso.org/patents). Any trade name used in this document is i
16、nformation given for the convenience of users and does not constitute an endorsement. For an explanation on the meaning of ISO specific terms and expressions related to conformity assessment, as well as information about ISOs adherence to the WTO principles in the Technical Barriers to Trade (TBT) s
17、ee the following URL: Foreword - Supplementary information The committee responsible for this document is ISO/TC 69, Applications of statistical methods, Subcommittee SC 4, Applications of statistical methods in process management. ISO 7870 consists of the following parts, under the general title Co
18、ntrol charts: Part 1: General guidelines Part 2: Shewhart control charts Part 3: Acceptance control charts Part 4: Cumulative sum control charts Part 5: Specialized control charts Part 6: EWMA control chartsiv ISO 2014 All rights reservedBS ISO 7870-5:2014ISO 7870-5:2014(E) Introduction The Shewhart
19、 control charts as given in ISO 7870-2 aid in detection of unnatural patterns of variations in data from repetitive processes and provide criteria for detecting a lack of statistical control. However, there may be several special situations for variables data where Shewhart control charts may be ina
20、dequate, insufficient or less efficient in detecting the unnatural patterns of variation of the process, particularly where: a) it takes considerable time to produce an item and as such sample results are available at large intervals; b) there are several subgroup sources that have approximately the
21、 same production rate, process average and process capability; c) process average is changing systematically; d) sample size is large and sequence of production is irrelevant; e) process does not have a constant target value. In such situations, specialized control charts are to be used. Similarly,
22、special situations may be encountered in dealing with attributes data. There may be situations when criticality of an incidence in a subgroup (nonconformity) is a matter of concern, but different nonconformities are having different criticality. As such, all types of nonconformities cannot be treate
23、d alike. Depending upon criticality, different ratings (weights) are required to be given to each class of nonconformity, and accordingly demerit scores are calculated. The control limits are calculated based on such demerit scores and accordingly control charts are plotted to exercise process contr
24、ol. There may be situations when inspection by attributes is preferred to that by variables, from practical considerations, for controlling both the location and the variability parameters of a measureable characteristic of a process (for example, inspection by gauging). The information is also avai
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSISO787052014EN_6237CONTROLCHARTSSPECIALIZEDCONTROLCHARTS 控制 专用 PDF

链接地址:http://www.mydoc123.com/p-391444.html