SH T 3519-2013 乙烯装置离心压缩机机组施工及验收规范.pdf
《SH T 3519-2013 乙烯装置离心压缩机机组施工及验收规范.pdf》由会员分享,可在线阅读,更多相关《SH T 3519-2013 乙烯装置离心压缩机机组施工及验收规范.pdf(52页珍藏版)》请在麦多课文档分享上搜索。
1、ICS 75.180 P 72 备案号:J1795-2014 中华人民共和国石油化工行业标准SH/T 3519-2013 代替SH/T3519-2002 乙烯装置离心压缩机组施工及验收规范Specification for construction and acceptance of centrifugal compressor unit for ethylene plant 2013一10-17发布2014-03一01实施中华人民共和国工业和信息化部发布SH/3519-2013 目欠前言.vl 范围.2 规范性引用文件.3 基本规定.4 施工准备.4. .1 技术准备.4. 2 现场准备.2
2、4. 3 开箱检验24.4 基础检查、复测及处理.24. 5 地脚螺栓安装.45 机组整体和分体安装.55.1 一般规定.55. 2 底座安装.55. 3 机组找平找正.65.4 机组初次轴对中及一次灌浆.65. 5 机组二次轴对中及二次灌浆.气.75. 6 机组精确轴对中.86 汽轮机解体检查.96.1 轴承和油封.9 6. 2 隔板的检查与安装.106. 3 喷嘴与转子叶片的检查.106.4 转子的检查与安装.116. 5 机体闭合.126.6 调节汽阀、抽汽调节阀的检查.126. 7 主汽阀(TTV)的检查.137 压缩机解体检查.137.1 轴承和轴封.137.2 转子的检查与安装.1
3、47.3 隔板的检查与安装.157.4 联轴器的检查与装配.:.157.5 机体闭合.168 附属设备安装.168. 1 一般规定.168.2 油系统设备安装.168. 3 汽轮机排汽接管的安装.17SH/T 3519-2013 8.4 凝汽器安装178. 5 凝液东安装.178. 6 其他换热设备的安装178. 7 干气密封系统的安装.179 附属管道安装.179. 1 一般规定179.2 管道与机器的连接.189. 3 油系统冲洗.189.4 管道吹洗.1910 机组试运行m10. 1 试运行条件.2010.2 试运行前准备.2010. 3 辅助系统试运行.2010.4 汽轮机单机试运行2
4、110. 5 压缩机试运行.221 交工技术文件.23附录A(资料性附录)常用密封胶及防咬合剂.24附录B(资料性附录)单表法对中.25附录C(资料性附录)可倾轴承问隙值的测量.28C.1 压铅测量法.28C.2 抬轴测量法.28附录D(资料性附录)无键联轴器的液压装卸.29D.1 联轴器轮载孔及轴颈的配合与受力计算.29D.2 安装前准备.mD.3 液压安装步骤.mD.4 液压拆卸联轴器.32D.5 拆装联轴器轮毅所需压力估算.32本规范用词说明.33附:条文说明.35II SH/T 3519-2013 Co睡在e盟tsForeword. v 1 Scope. l 2 Normative r
5、eferences.1 3 General provisions.咱.14 Construction preparation-.1 4. 1 Technical preparation.1 4.2 Site preparation-.2 4.3 Unpacking inspection.2 4.4 Foundations examination, repetition measurement and surface treatment.2 4. 5 Foundation bolt installation-.4 5 Whole unit and split installation.5 5.
6、1 General requreiments5 5. 2 Perch the baseplate.5 5.3 Alignment and leveling fthe unit.6 5. 4 Rough alignment and first grouting of the unit.6 5. 5 Second aligment and second grouting of the unit.7 5. 6 Precise shaft aligment of the unit.8 6 Turbines disassembly check.9 6. 1 Bearings and oli seal.9
7、 6. 2 Baffles check and assembly.10 6. 3 Nozzles and rotor blades check. 10 6. 4 Rotor check and assembly. 11 6. 5 Mounting of upper casing.12 6.6 GoveIlng valve and exaction control valve check-. 12 6. 7 TTV check.13 7 Compressors disassembly check. u 7. 1 Bearings and shaft sealings.13 7.2 Rotor c
8、heck and assembly. 14 7. 3 Baffles check and assembly.15 7.4 Coupling check and assembly.四7.5 Mounting ofupper casing. 16 8 Auxiliary facility installation.四8. 1 General requirements.16 8. 2 Oil system facility installation.16 8.3 Exhaust pipes installation ofturbine.17 III SH/T 3519-2013 8.4 Conden
9、ser installation.17 8.5 Condensate pump installation17 8.6 Other heat exchanger installation.17 8.7 Dry gas sealing system installation17 9 Auxiliary pipes assembly口9. 1 General requirements,17 9.2 Connection between pipes and machines四9. 3 Oil system、丑ush四9. 4 Pipe f1ushing19 1 0 Testrun of the uni
10、t.20 10. 1 Requirement of testrun,20 10.2 Preparation for testrun20 1 O. 3 Testrun of auxiliary syster丑S.2010. 4 Solo testrun of turbine21 10.5 Compressor testrun,22 11 Technical document of construction completion,23 Annex A CInformative) Common sealant and anti-seize grease.24 Annex B (Informative
11、) Single meter alignment. 25 Annex C CInformative) Radial interval measurement of tiltable bearing bushes,28 C. 1 Pressing lead measurement.,28 C. 2 Lifting shaft measumnmy28 Annex D CInformative) Hydraulic assembly and disassembly of keyless coupling,29 D. 1 Fitting and stress calculationl for whee
12、l hub bore of coupling and joumal m D.2 Preparation for installation30 D. 3 Hydraulic installation steps30 D. 4 Hydraulic disassembly of coupling,32 D. 5 Need pressure estimation for assembly and disassembly of coupling hub 32 Explanation of wording in this specification.-.33 Add: Explanation of art
13、icles35 IV SH/T 3519-2013 目Ij吕根据中华人民共和国工业和信息化部(2010年第一批行业标准制修订计划)(工信厅科2010J74号)的要求,规范编制组经广泛调查研究,认真总结实践经验,参考有关国际标准和国外先进标准,并在广泛征求意见的基础上,修订本规范。本规范共分11章和4个附录。本规范的主要技术内容是:基本规定、机组总体安装、汽轮机的解体检查、压缩机的解体检查、附属设备安装、附属管道安装、机组试运行、交工技术文件。本规范是在SH/T3519-2002 (乙烯装置离心压缩机机组施工技术规程的基础上修订而成,修订的主要技术内容是:一一将名称更改为乙烯装置离心压缩机组施工
14、及验收规范); 一一删除了机组散件安装部分,机组的安装改为整体和分体安装;一一增加了汽轮机解体检查;一一增加了压缩机解体检查;一一删去了原规范性附录A、附录B;一一一删去了原资料性附录C、附录D、附录1;一一变更了三个资料性附录的编号,将附录E改为附录A,附录F改为附录C,附录G改为附录D;将原规迫性附录H改为资料性附录B。本规范由中国石油化工集团公司负责管理,由中国石油化工集团公司施工技术南京站负责日常管理,由中石化第十建设有限公司负责具体技术内容的解释。执行过程中如有意见和建议,请寄送日常管理单位和主编单位。本规范日常管理单位:中国石油化工集团公司施工技术南京站通讯地址:江苏省南京市江宁区
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SH 3519 2013 乙烯 装置 离心 压缩机 机组 施工 验收 规范