【计算机类职业资格】信息系统监理师-25及答案解析.doc
《【计算机类职业资格】信息系统监理师-25及答案解析.doc》由会员分享,可在线阅读,更多相关《【计算机类职业资格】信息系统监理师-25及答案解析.doc(11页珍藏版)》请在麦多课文档分享上搜索。
1、信息系统监理师-25 及答案解析(总分:100.00,做题时间:90 分钟)一、单项选择题(总题数:30,分数:100.00)1._ is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relati
2、onships that exist between them.(分数:3.00)A.PERTB.AOAC.WBSD.PDM2.Changes often happen in _.(分数:3.00)A.initiating processB.Executing processC.Planning ProcessD.Closing Process3.Tool for defining activities is _.(分数:3.00)A.Dependency DeterminationB.Precedence Diagramming methodC.Rolling Wave PlanningD.
3、Schedule network Templates4._ is a client/server protocol for transferring files across the Internet.(分数:3.00)A.POP3B.IMAPC.FTPD.HTTP5.A test case normally consists of a unique identifier, requirement references from a design specification, events, a series of steps to follow, input, output, actual
4、result, and _.(分数:3.00)A.bugB.expected resulC.test reportD.traceability matrix6.The Systems Development Life Cycle (SDLC) is a process of creating or altering information systems, and the models and methodologies that people use to develop these systems. Sequential SDLC models, such as _, focus on c
5、omplete and correct planning to guide large projects and risks to successful and predictable results.(分数:3.00)A.WaterfallB.Extreme ProgrammingC.SpiralD.Rapid Prototyping7.In software engineering and systems engineering, _, is a description of a system“s behavior as it responds to a request that orig
6、inates from outside of that system.(分数:3.00)A.black boxB.business ruleC.traceability matrixD.use case8.Supervision will manage the implementation and the configuration of the different, types of project documents, not including _.(分数:3.00)A.compileB.formatC.versionD.change9.The quality management pl
7、an should describe how the project management team will implement its quality _.(分数:3.00)A.improvementB.controlC.policyD.information10.Quality managemen _.(分数:3.00)A.is another name for careful inspectionsB.is inversely related to productivityC.is primarily the responsibility of managementD.is prima
8、rily the responsibility of the workers11.Adding 5 people to a 4 person team increases the communication channels by a factor of _.(分数:3.00)A.3 timesB.4 timesC.5 timesD.6 times12.The project budget has been finalize D. Additional work has been discovered that was not planned for in the budget or proj
9、ect scope. _ could provide the fund to cover the newly discovered work item.(分数:3.00)A.Contingency reserveB.Project profitC.Management reserveD.Special fund13.Several risk response strategies are available. _ the risk simply gives another party responsibility for its management, it does not eliminat
10、e risk.(分数:3.00)A.AvoidingB.MitigatingC.AcceptingD.Transferring14.Schedule development can require the review and revision of duration estimates and resource estimates to create an approved _ that can serve as a baseline to track progress.(分数:3.00)A.scope statementB.activity listC.project charterD.p
11、roject15._ means that every project has a definite beginning and a definite end.(分数:3.00)A.Project phaseB.UniqueC.TemporaryD.Closure16.Which of the following would requirereal-time processing? _(分数:3.00)A.Playing a computer gameB.Executing a program that predicts the state of economyC.Printing label
12、sD.Listening the music17.One tool that is useful during both analysis and design is the _, which is a pictorial representation of the items of information (entities) within the system and the relationships between these pieces of information.(分数:3.00)A.data dictionaryB.dataflow diagramC.use case dia
13、gramD.entity-relationship diagram18.The connection between two networks to form an internet is handled by a machine known as a _.(分数:3.00)A.bridgeB.clientC.routerD.switch19.Configuration management is the process of managing change in hardware, software, firmware, documentation, measurements, etc. A
14、s change requires an initial state and next state, the marking of significant states within a series of several changes becomes important. The identification of significant states within the revision history of a configuration item is the central purpose of _ identification.(分数:3.00)A.baselineB.valu
15、eC.costD.Control20._ Development is a structured design methodology that proceeds in a sequence from one phase to the next.(分数:3.00)A.WaterfallB.PhasedC.PrototypingD.Parallel21.Maintenance activities include _. making enhancements to software products developing a new software product correcting pro
16、blems adapting products to new environments(分数:4.00)A.B.C.D.22._ operate by distributing a workload evenly over multiple back end nodes. Typically the cluster will be configured with multiple redundant load-balancing front ends.(分数:4.00)A.High-availability clustersB.Load-balancing clustersC.Grid com
17、putingD.Cloud Computing23.A PM wanted to show management, visually, how quality controls were affecting processes. The best tool to accomplish this is _.(分数:4.00)A.DiagramsB.HistogramsC.FlowchartsD.Control charts24._ is a measurable, verifiable work product such as specification, feasibility study r
18、eport, detail document, or working prototype.(分数:4.00)A.MilestoneB.DeliverableC.EtcD.BAC25._ is the budgeted amount for the work actually completed on the schedule activity or WBS component during a given time perioD.(分数:4.00)A.Planned valueB.Earned valueC.Actual costD.Cost variance26.Since RAM is o
19、nly active when the computer is on, your computer uses disk to store information even when the computer is off. Which of the following is true? _(分数:4.00)A.When your computer is on, only RAM is used to store information.B.When your computer is on, only disk drives are used to store information.C.Whe
20、n your computer is off, only RAM is used to store information.D.When your computer is off, only disk drives are used to store information.27.The basic unit of measure in a computer system is the _. It is the smallest unit in computing. There are some other measures in a computer, such as Kilobyte, M
21、egabyte, Gigabyte and so on.(分数:4.00)A.KiloByteB.bitC.GigaByteD.MegaByte28.A _ infected computer may lose its data.(分数:4.00)A.fileB.databaseC.virusD.program29.As an operating system repeatedly allocates and frees storage space, many physically separated unused areas appear. This phenomenon is called
22、 _.(分数:4.00)A.fragmentationB.compactionC.swappingD.paging30.When a bridge transmits an Ethernet frame, the Ethernet frame has _.(分数:4.00)A.the broadcast address for the its source addressB.the bridge“s LAN address for its destination addressC.the bridge“s LAN address for its source addressD.none of
23、the above信息系统监理师-25 答案解析(总分:100.00,做题时间:90 分钟)一、单项选择题(总题数:30,分数:100.00)1._ is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logica
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机 职业资格 信息系统 监理 25 答案 解析 DOC
