1、PMP 资格认证考试-项目风险管理及答案解析(总分:50.00,做题时间:90 分钟)一、B单项选择题/B(总题数:50,分数:50.00)1.A thorough review of_will help identify potential risks to the project(分数:1.00)A.risk identification checklists based on historical information and knowledgeB.the projects change control systemC.the projects mission statementD.t
2、he projects budget2.All the following are purposes of project risk management EXCEPT_(分数:1.00)A.identifying factors that are likely to affect the project scopquality,time and costB.developing response strategies for all identified risksC.providing a baseline for project factors that cannot be contro
3、lledD.mitigating impacts by influencing project factors that can be controlled3.The project budget has been finalizedAdditional work has been discovered that was not planned for in the budget or project scopeWhere could the found to cover the newly discovered work item?(分数:1.00)A.Contingency reservB
4、.Project profiC.Management reservD.Abandoning fun4.In your project,there is:50% probability for $40000 profit,50% probability for $25000 lossWhat is the expected profit in your project?(分数:1.00)A.$32500B.$25000C.$7500D.-$7500( loss of $7500)5.Project team A has been hired to manage a transportation
5、project very similar to dozens at projects theyve managed successfully in the pastThe team had determined that the probability of achieving project objectives is 94%The team has determined the size of contingency reserves that may be neededThese determinations are included in which process?(分数:1.00)
6、A.Qualitative risk analysiB.Plan risk responseC.Quantitative risk analysiD.Risk identificatio6.While implementing your project,a team member brings to your notice a risk that was not mentioned in the risk response planIn this case,you should_(分数:1.00)A.accept the riskB.perform additional risk respon
7、se planning to control the riskC.inform the project sponsorD.use project contingency7.You are the project manager of a project which would do oil-exploration in the oceanSince you cannot plan for all eventualities,you establish a contingency reserve,including amounts of time,money or resources to ha
8、ndle known or unknown risksThis is an example of_(分数:1.00)A.risk avoidanceB.risk transferC.active risk acceptanceD.improper risk planning since all risks should be identified and accounted for8.In your project,you can use all the following tools and techniques for risk response planning EXCEPT_(分数:1
9、.00)A.strategies for negative risks or threatsB.contingent response planningC.strategy for threat and opportunitiesD.strategy for residual risks9.Outputs from risk response planning include all of the following EXCEPT_(分数:1.00)A.risk register updatesB.corrective actionsC.risk-related contractual agr
10、eementsD.project management plan updates10.Managing risks and documenting them is very important in project planning processYou are in the process of defining key risks,including constraints and assumptions,and planned responses and contingencies(where appropriate)These details will be included in t
11、he_(choose the best answer)(分数:1.00)A.project management planB.project baselineC.risk response planD.risk baseline11.The term deflection has a number of meanings,but in terms of pure risk mitigations strategies,deflections are accomplished by_(分数:1.00)A.performing contingent plansB.contracting to a
12、sub-contractorC.allowing the owner to perform the mitigation strategy since the contractor feels it was not called for in the contractD.allowing the float in the schedule to take care of the risk12.In your project,there is:25% probability for $25000 profit50% probability for $40000 profit,25% probab
13、ility for $100000 profitWhat is the expected profit in your project?(分数:1.00)A.$40000B.$50000C.$51250D.$5375013.As part of risk management process,you just created an overall risk ranking of the project,created list of prioritized risks,identified which risks need additional analysis and determined
14、trends in risk analysis resultsWhat should you do next?(分数:1.00)A.Analyze the effect of risk events and assign a numerical rating to those riskB.Create a list of identified riskC.Determine the fundamental conditions or events that may give rise to identified risk(root causes of riD.Note down the lis
15、t of potential responses to the risk14.When there is uncertainty associated with one or more aspects of the projectone of the first steps to take is to_(分数:1.00)A.revise project planB.conduct a risk benefit analysisC.conduct a needs analysisD.increase the estimated cost of the project15.An appropria
16、te sequence for risk management activities is_(分数:1.00)A.identify risks,perform qualitative risk analysis,perform quantitative risk analysis,plan risk responsesB.identify risks,risk assessment。and risk planningC.identify risks,risk mitigation,and risk managementD.identify risks,risk elimination,and
17、risk mitigation16.All of the following are inputs to risk identification EXCEPT_(分数:1.00)A.risk management planB.project management planC.workaround planD.project scope statement17.Charles is working on a project and finds that one of his primary vendors is raising their costs for a key component of
18、 the product being produced by his projectIn order to cover these costs,he_(分数:1.00)A.will ask management for a budget increase to cover the differenceB.will assume management reserve will cover the difference because this increase was out of his controlC.will use the cost change control process to
19、obtain approval to use part of the contingency allowanceD.will go over budget and ask for forgiveness at the end of the project Charles18.Risk management helps in maximizing the probability and consequences of positive events and minimizing the probability and consequences of adverse events to proje
20、ct objectivesRisk response planning helps in this context because it_(分数:1.00)A.helps in deciding how to approach and plan the risk management activitiesB.develops procedures and techniques to enhance opportunities and reduce threats to project objectivesC.determines which risks might affect the pro
21、ject and documents their characteristicsD.monitors residual risks,identifies new risks and executes risk reduction plans19.Risk response development is intended to_(分数:1.00)A.create steps to identify project risksB.formulate strategies for dealing with adverse eventsC.construct a list of previous pr
22、oject risksD.develop measurements to quantify project risks20.You are an expert in risk management,having worked in the field for more than 15 yearsYour project is behind schedule and in your projectyou are in the process of identifying which risks may affect your project through the risk identifica
23、tion processIn a discussion with your project sponsor,you mention that after the risk identification phase is completed,you would like to directly perform quantitative risk analysisYour project sponsor cautions you against doing this-he mentions that in a prior project,qualitative risk analysis was
24、conducted after risk identificationIn this context,you will_(分数:1.00)A.mention to your sponsor that since you are an expert in risk management, there is no need to do qualitative risk management and the team can directly go to quantitative risk management phasThis will also save time since your proj
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机 职业资格 PMP 资格 认证 考试 项目风险 管理 答案 解析 DOC