【计算机类职业资格】PMP资格认证考试-项目沟通管理及答案解析.doc
《【计算机类职业资格】PMP资格认证考试-项目沟通管理及答案解析.doc》由会员分享,可在线阅读,更多相关《【计算机类职业资格】PMP资格认证考试-项目沟通管理及答案解析.doc(20页珍藏版)》请在麦多课文档分享上搜索。
1、PMP 资格认证考试-项目沟通管理及答案解析(总分:50.00,做题时间:90 分钟)一、B单项选择题/B(总题数:50,分数:50.00)1.In an appropriate communication model between a sender and a receiverall the following statements are correct EXCEPT:(分数:1.00)A.Noise should be minimizeB.Receiver must decode and reply back to the messagC.Receiver should acknowl
2、edge and agree with the message sent by the sendeD.Sender must choose right way to send the message2.You had 8 people In your project,one more person will be joining next weekYou know that once the new person joins,the number of communication channels will increase by_(分数:1.00)A.No change in number
3、of communication channelsB.8C.12D.203.You are project manager leading a US $4000000 mechanical engineering projectTo date,youve been leading the other 11 people who comprise the overall project teamLately youve noticed that you are spread too thin and the schedule is being negatively impactedBecause
4、 the project is date constrained,you convinced senior management to accept a cost variance and add a senior quality assurance analyst to the project teamThis new resource will work directly with the three project team members who comprise the testing subteamHow many more communication channels will
5、there be on the project team?(分数:1.00)A.12B.11C.78D.664.Your project has a number of different work resultsYou are collecting information about these work results,such as what costs have been incurred or committed and which deliverables have been completed and which remain outstandingYou will use th
6、is information in which of the following processes?(分数:1.00)A.Project plan executioB.Integrated change controC.Report performancD.Verify scop5.You are ready to enter a negotiating session with a group that is native to a tiny northern islandThrough the centuries,islanders have been known as aggressi
7、ve and assertive people who like to talk much more than they like to listenAnd the windswept plain of this island,where only the strong survive,has made these people tough negotiatorsTo earn your yearly bonus,you must not be at a disadvantage in your negotiations with themTherefore,you must concentr
8、ate on_(分数:1.00)A.seating arrangements in the negotiating roomB.ingratiating yourself to the most powerful negotiator on the other side of the negotiating table to earn his or her trustC.active listeningD.setting and following strict time limits at each step of the negotiating6.When a project manage
9、r is engaged in negotiations,non-verbal communication skills are of_(分数:1.00)A.little importanceB.major importanceC.importance only when cost and schedule objectives are involvedD.importance only to ensure you win the negotiation7.Under a seller agreement,formal,written correspondence with the selle
10、r is required when_(分数:1.00)A.change to the project is issuedB.meeting with the sellers management is heldC.seller is asked for supporting informationD.there is a follow up to a conversation8.A company and its seller are in the middle of a long dispute over the costs of terminating the contractThe p
11、roject manager determines that the only way to resolve the problem is to have it heard and resolved by a neutral partyTo accomplish this,the project manager should use a(n)_(分数:1.00)A.functional resource managerB.conflict solution expertC.arbitratorD.lawyer9.The project team is working on an importa
12、nt and complex project that requires a lot of coordinationUnder these circumstances,the BEST strategy is to_(分数:1.00)A.have a war roomB.hire a contractorC.hold more meetings to get the word outD.gain extra assistance from management10.Tools and techniques for performance reporting include all of the
13、 following EXCEPT:(分数:1.00)A.Information presentation toolB.Decision tree analysiC.Cost reporting systemD.Status review meeting11.As part of the communications process,the receiver is responsible for_.(分数:1.00)A.agreeing with the senders messageB.pretending that the message is received only partiall
14、to encourage further discussionsC.making sure that the information is received in its entirety and understood correctlyD.specifying that the message is not understoounless it is reduced to writing12.The major processes of project communications management are_(分数:1.00)A.identify stakeholders,plan co
15、mmunications,distribute information,manage stakeholder expectations,report performanceB.communications planning, response planning,progress reporting,and information distributionC.communications planning,information distribution,schedule reporting,and stakeholder analysisD.communications planning,ch
16、ange reporting,project records,and acceptance13.Metacommunication,paralinguistics,second-order messages,and the hidden dimension of communication all refer to_(分数:1.00)A.communication skillsB.communication requirementsC.ways to exercise tolerance and compromiseD.nonverbal communication14.Communicati
17、on under a contract should tend toward_(分数:1.00)A.formal written communicationB.formal verbal communicationC.informal written communicationD.informal verbal communication15.In ensuring an effective meeting the project manager should_(分数:1.00)A.establish a meeting policyB.always call a meeting even i
18、f the proect manager is not sure there is a real needC.alter the agenda during the meeting to ensure all of the problems are solved during the meetingD.not encourage participation from everyone as this will prolong the meeting16.You are responsible for a systems integration project in your organizat
19、ion that has multiple internal customersYou have just begun preparing a project planBecause many people in your organization are interested in this system and its progress,you decide to prepare a project communications management planYour first step in preparing this plan is to_(分数:1.00)A.conduct a
20、stakeholder analysis to assess information needsB.determine a production schedule to show when each type of communication will be producedC.describe the information you plan to distributeD.set up a repository for all project documents so that they will be easily accessible17.Ideally,communication be
21、tween the project manager and the project team members should take place_(分数:1.00)A.via daily status reportsB.through approved documented formsC.by written and oral communicationD.through the formal chain of command18.Both under-communication and over-communication can cause problems on a projectYou
22、 want to ensure that the information you collect showing project progress and status is meaningful to stakeholdersTo determine specific metrics,you will conduct a stakeholder analysis,and then determine the level of detail stakeholders requireThis is available through the_(分数:1.00)A.performance meas
23、urement baselineB.project management methodologyC.project strategy and approachD.communications management plan19.Some people believe that to have an effective conversation,a distance of about 20 inches(51 centimeters)between the two parties involved is requiredIn certain cultural groupshowever,the
24、normal conversational distance is in the range of 14 to 15 inches(36 to 38 centimeters):and some group say 9 to 10 inches(23 to 25 centimeters) is idealPeople from some cultural groups may keep a door open during a negotiationwhereas others may prefer to close the doorSome people feel they should be
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机 职业资格 PMP 资格 认证 考试 项目 沟通 管理 答案 解析 DOC