【计算机类职业资格】PMP资格认证考试-1及答案解析.doc
《【计算机类职业资格】PMP资格认证考试-1及答案解析.doc》由会员分享,可在线阅读,更多相关《【计算机类职业资格】PMP资格认证考试-1及答案解析.doc(72页珍藏版)》请在麦多课文档分享上搜索。
1、PMP资格认证考试-1 及答案解析(总分:200.00,做题时间:90 分钟)一、B单项选择题/B(总题数:200,分数:200.00)1.Being assigned as the project manager to a project you perform earned value Analysis and find the following results:EV=250000;PV=200000;AC=275000;BAC=500000What is right?(分数:1.00)A.EAC=400000B.EAC=550000C.BTC=400000.D.ETC=75000.2.
2、The type of contract where the buyer incurs opportunity cost but little or no additional cost risk is called_(分数:1.00)A.fixed-price with incentiveB.firm-fixed-priceC.fixed-price with economic price adjustmentD.fixed-price with right of renewal3.Cost of quality is the total cost of all efforts to ach
3、ieve product/service quality,and includes all work to ensure conformance to requirementsAll of the following are costs that are incurred EXCEPT_(分数:1.00)A.cost of poor qualityB.opportunity costC.external failure costD.appraisal cost4.A particular stakeholder has a reputation for making many changes
4、on projectsWhat is the BEST approach a project manager can take at the beginning of the project to manage this situation?(分数:1.00)A.Say“no”to the stakeholder a few times to dissuade him from submitting more changeB.Get the stakeholder involved in the project as early as possiblC.Talk to the stakehol
5、ders boss to find ways to direct the stakeholders activities to another projecD.Ask that the stakeholder not be included in the stakeholder listin5.Task A has the following details:Optimistic estimate=30,pessimistic estimate=40,most likely estimate=35Task B has the following details:Optimistic estim
6、ate=32,pessimistic estimate=37,most likely estimate=34Task C has the following details:Optimistic estimate=25,most likely estimate=35,pessimistic estimate=45Which task has the highest standard deviation?(分数:1.00)A.TaskB.TaskC.TaskD.Task A & Task6.In your software development project you have to wait
7、 for 5 days after ordering a new software and then only you can start integration testingThe 5 days in this case is an example of_(分数:1.00)A.leadB.lagC.delayD.float7.Your project is executed with a globally spread virtual teamThe project progress has been found to be too slowWhich measure is most li
8、kely to immediately speed up the project?(分数:1.00)A.Technical training for all team memberB.Daily phone conferences and detailed reportinC.A team meeting at a location convenient to all team memberD.Collocation of team members at a suitable plac8.Out of the following definitions of a project stakeho
9、lder,which one do you think is most appropriate?(分数:1.00)A.An enterprise whose employees are directly involved in doing the project worB.An entity whose interest may be affected as a result of the project executioC.An entity that performs activities to accomplish objectiveD.One who is responsible fo
10、r managing the projec9.The method of constructing a project schedule network diagram that represents activities and connects then to show the all dependencies is known as_(分数:1.00)A.precedence diagramming methodB.activity listC.arrow diagramming methodD.schedule network templates10.Earned value tech
11、nique is used in which process?(分数:1.00)A.Direct and manage project executioB.Monitor and control project worC.Integrated change controD.Develop project management pla11.The following are the internal rate of return(IRR)for different projectsProject A:5%,project B:25%,project C:30%,project D:99%Whic
12、h is the best project?(分数:1.00)A.ProjectB.ProjectC.ProjectD.Project12.During the execution phase of project,you realize that one of the product functionalities has been omitted in the project plan,which will not eventually satisfy the requirement,you should_(分数:1.00)A.update the project schedule and
13、 budgetB.submit a change request to change control board and re-baselineC.negotiate with the client for a new delivery date based on the revised scheduleD.informing management and take necessary measures for changes in budget and schedule13.All of the following are parts of an effective change contr
14、ol system EXCEPT_(分数:1.00)A.proceduresB.standards for reportsC.meetingsD.lessons learned14.Which of the following describes the BEST use of historical records from previous projects?(分数:1.00)A.Estimating,life cycle costing and project planninB.Risk management,estimating and creating lessons learneC.
15、Project management planning,estimating and creating a status reporD.Estimating,risk management and project plannin15.While working on an external project your customer asks you to perform some additional tasks that are not included in the formal contractYou should_(分数:1.00)A.honor the customers requ
16、est as sign of cooperation to ensure future businessB.refuse the request and report the customer to your sponsorC.acknowledge the request and advise the customer to submit a formal change requestD.convene a meeting of the project team and rewrite the scope statement16.The high-level project schedule
17、 constraints have just been determinedWhat project management process group are you in?(分数:1.00)A.InitiatinB.PlanninC.ExecutinD.Monitoring and controllin17.Executing processes are concerned with_(分数:1.00)A.recognizing that a project or phase should beginB.coordinating people and other resources to c
18、arry out the planC.devising and maintaining a workable method to accomplish the business need that the project was undertaken to addressD.ensuring that the project objectives are met by monitoring and measuring progress and taking corrective action when necessary18.At the end of the closing process
19、group,_(分数:1.00)A.it is verified that the defined processes are completed within all the process groups to close the project phaseB.it is determined that the product of the project is completed satisfactorilyC.project management plan is written off by the project sponsorD.new change requests are ini
20、tiated as required19.In a project status meeting,you identified that a team member has not completed the task which he was supposed to complete this weekWhat action you will take as a project manager in a metrics organization?(分数:1.00)A.Update the details in work product information and share that w
21、ith functional manageB.Update the details in performance measurement baseline and share that with functional manageC.Have an informal discussion with the team member to find out the reasoD.Formally communicate the slippage from the team member to the functional manager and request him to discuss wit
22、h the employee to ensure that this will not happen in the futur20.The project sponsor has just provided the project charterWhat is the NEXT thing to do?(分数:1.00)A.Begin to complete work packageB.Complete scope verificatioC.Start integrated change controD.Start to create management plan21.All of the
23、following must be performed during project initiating EXCEPT_(分数:1.00)A.identify and document business needsB.create a project scope statementC.divide large projects into phasesD.accumulate and evaluate historical information22.A team member notifies the project manager that the activities comprisin
24、g a work package are no longer appropriateIt would be BEST for the project manager to be in what part of the project management process?(分数:1.00)A.Corrective actioB.Integrated change controC.Monitoring and controllinD.Project closin23.You are working on a software development project and there is 60
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机 职业资格 PMP 资格 认证 考试 答案 解析 DOC