ISO IWA 14-2-2013 Vehicle security barriers - Part 2 Application (First Edition Corrected Version 01 15 2014)《车辆安全屏障 第2部分 应用 (第一版 修正版本01 15 2014)》.pdf
《ISO IWA 14-2-2013 Vehicle security barriers - Part 2 Application (First Edition Corrected Version 01 15 2014)《车辆安全屏障 第2部分 应用 (第一版 修正版本01 15 2014)》.pdf》由会员分享,可在线阅读,更多相关《ISO IWA 14-2-2013 Vehicle security barriers - Part 2 Application (First Edition Corrected Version 01 15 2014)《车辆安全屏障 第2部分 应用 (第一版 修正版本01 15 2014)》.pdf(68页珍藏版)》请在麦多课文档分享上搜索。
1、 ISO 2013 Vehicle security barriers Part 2: Application Barrires de scurit de vhicule Partie 2: Applications INTERNATIONAL WORKSHOP AGREEMENT IWA 14-2 Reference number IWA 14-2:2013(E) First edition 2013-11-15 Corrected version 2014-01-15 IWA 14-2:2013(E)ii ISO 2013 All rights reserved COPYRIGHT PRO
2、TECTED DOCUMENT ISO 2013 All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized otherwise in any form or by any means, electronic or mechanical, including photocopying, or posting on the internet or an intranet, without prior written permission. Pe
3、rmission can be requested from either ISO at the address below or ISOs member body in the country of the requester. ISO copyright office Case postale 56 CH-1211 Geneva 20 Tel. + 41 22 749 01 11 Fax + 41 22 749 09 47 E-mail copyrightiso.org Web www.iso.org Published in Switzerland IWA 14-2:2013(E) IS
4、O 2013 All rights reserved iii Contents Page Foreword v Introduction vi 1 Scope . 1 2 Introduction to hostile vehicle mitigation . 1 2.1 General . 1 2.2 Selection of a VSB 3 3 The threat 3 3.1 Identify and quantify the threat . 3 3.2 Duration of deployment 4 4 Assets 4 4.1 Identification of the crit
5、ical assets . 4 4.2 Identification of stakeholders 4 4.3 Consideration of collateral damage 5 5 Site assessment 5 5.1 Review of existing security arrangements 5 5.2 Site survey . 5 5.3 Civil works 6 5.4 Traffic survey 8 6 Site design 9 6.1 Traffic management 9 6.2 Aesthetics .10 7 VSB performance .1
6、0 7.1 Impact performance 10 7.2 Vehicle speed .11 7.3 Impact angle .12 7.4 Vehicle penetration distance and major debris distance/coordinates .12 7.5 Operational performance12 8 Procurement strategy 16 8.1 General 16 8.2 Availability and maintenance of the VSB .16 8.3 Quality .16 8.4 Cost .16 8.5 Co
7、mmissioning and handover 17 9 Deployment and removal .17 9.1 Highway/local authority approval 17 9.2 Logistics of deployment .17 9.3 Installation .17 9.4 Lifting and placement 18 9.5 Removal considerations .18 10 Types of VSB .18 10.1 General 18 10.2 Passive VSBs .18 10.3 Active VSBs 18 10.4 Example
8、s of passive VSBs .19 10.5 Examples of active VSBs .21 11 Active VSBs .25 11.1 General 25 11.2 Categories of active VSBs 26 11.3 Layout of active VSBs at VACPs 28 11.4 Safety issues .31 IWA 14-2:2013(E)iv ISO 2013 All rights reserved 11.5 Training 33 11.6 Maintenance, service and inspection 33 11.7
9、Control system34 12 Operational requirements 34 12.1 General 34 12.2 Level 2 OR proforma .37 Annex A (informative) Level 2 operational requirement (OR) proforma .38 Annex B (informative) Design method 53 Annex C (informative) Modifications to the VSB .56 Bibliography .57 IWA 14-2:2013(E) Foreword IS
10、O (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Each member body interested in a subject for which a technical co
11、mmittee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of electro
12、technical standardization. The procedures used to develop this document and those intended for its further maintenance are described in the ISO/IEC Directives, Part 1. In particular the different approval criteria needed for the different types of ISO documents should be noted. This document was dra
13、fted in accordance with the editorial rules of the ISO/IEC Directives, Part 2 (see www.iso.org/directives). Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. ISO shall not be held responsible for identifying any or all such patent r
14、ights. Details of any patent rights identified during the development of the document will be in the Introduction and/or on the ISO list of patent declarations received (see www.iso.org/patents). Any trade name used in this document is information given for the convenience of users and does not cons
15、titute an endorsement. For an explanation on the meaning of ISO specific terms and expressions related to conformity assessment, as well as information about ISOs adherence to the WTO principles in the Technical Barriers to Trade (TBT) see the following URL: Foreword - Supplementary information Inte
16、rnational Workshop Agreement IWA 14 was sponsored by UK Governments Centre for the Protection of National Infrastructure (CPNI) on behalf of the international community. The development of this IWA was facilitated by BSI Standards Limited. It came into effect on 15 November 2013. IWA 14 consists of
17、the following parts, under the general title Vehicle security barriers: Part 1: Performance requirement, vehicle impact test method and performance rating Part 2: Application This corrected version of IWA 14-2:2013 incorporates editorial modifications. ISO 2013 All rights reserved v IWA 14-2:2013(E)
18、 Introduction 0.1 Workshop contributors Acknowledgement is given to the following organizations that were involved in the development of this International Workshop Agreement: Allen Total Perimeter Security Limited APT Security Systems ATG Access Ltd BRE Global Limited Bristorm, Hill and Smith Ltd C
19、entre for the Protection of National Infrastructure (CPNI) DELTA BLOC International GmbH GME Springs/Safetyflex Barriers Heald Limited HMS Nelson, Portsmouth Naval base Kirchdorfer Fertigteilholding GmbH L.I.E.R. Marshalls MFD International Limited Ministry of Commerce and Industry Director General
20、for Standards and Metrology (DGSM) (Sultanate of Oman) MIRA Ltd Norwegian Defence Estates Agency Perimeter Protection Group Perimeter Security Suppliers Association Rhino Engineering Ltd Royal Military Academy - Civil and Materials Engineering Department RSSI Barriers Slzer GmbH Scorpion Arresting S
21、ystems LTD Ministry of Home Affairs (Singapore) Sudanese Standard and Metrology Organization (SSMO) Syrian Arab Organization for Standardization and Metrology (SASMO) Tallwang KVI PTY Ltd t/a AVS-ellivi ISO 2013 All rights reserved IWA 14-2:2013(E) Technical and Test Institute for Construction Pragu
22、e Texas A 2) attack method to be mitigated; 3) countermeasures; 4) response to increased threat conditions; 5) enforceable stand-off distance; b) business needs: 1) lifetime cost (training, manning levels, service, maintenance and replacement); 2) traffic management; 3) appearance; 4) internal and e
23、xternal stakeholder requirements; International Workshop Agreement IWA 14-2:2013(E) ISO 2013 All rights reserved 1 IWA 14-2:2013(E) 5) security risks induced by safety concerns or systems; c) engineering constraints: 1) architectural; 2) foundations; 3) buried services; 4) land ownership and availab
24、le space; 5) local authority planning restriction(s) (e.g. height/weight/noise restrictions of area of land, utilities). 2.1.3 It is important that a security operational requirement (OR) (see Clause 12) is developed in con- junction with a user requirement document (URD) and that all key stakeholde
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ISOIWA1422013VEHICLESECURITYBARRIERSPART2APPLICATIONFIRSTEDITIONCORRECTEDVERSION01152014 车辆 安全 屏障 部分

链接地址:http://www.mydoc123.com/p-1257478.html