IEEE C62 92 2-1989 en Guide for the Application of Neutral Grounding in Electrical Utility Systems Part IIGrounding of Synchronous Generator Systems《电力事业系统中性接地应.pdf
《IEEE C62 92 2-1989 en Guide for the Application of Neutral Grounding in Electrical Utility Systems Part IIGrounding of Synchronous Generator Systems《电力事业系统中性接地应.pdf》由会员分享,可在线阅读,更多相关《IEEE C62 92 2-1989 en Guide for the Application of Neutral Grounding in Electrical Utility Systems Part IIGrounding of Synchronous Generator Systems《电力事业系统中性接地应.pdf(29页珍藏版)》请在麦多课文档分享上搜索。
1、Recognized as anAmerican National Standard (ANSI)Copyright 1989 byThe Institute of Electrical and Electronics Engineers, Inc.3 Park Avenue, New York, NY 10016-5997, USANo part of this publication may be reproduced in any form, in an electronic retrieval system or otherwise, without the priorwritten
2、permission of the publisher.IEEE Std C62.92.2-1989 (R2005)IEEE Guide for the Application of Neutral Grounding in Electrical Utility Systems Part II-Grounding of Synchronous Generator SystemsSponsorSurge Protective Devices Committeeof theIEEE Power Engineering SocietyReaffirmed October 30, 2000Approv
3、ed October 13, 1989American National Standards InstituteReaffirmed June 9, 2005Approved February 2, 1989IEEE-SA Standards BoardIEEE Standards documents are developed within the Technical Committees of the IEEE Societies and the StandardsCoordinating Committees of the IEEE Standards Board. Members of
4、 the committees serve voluntarily and withoutcompensation. They are not necessarily members of the Institute. The standards developed within IEEE represent aconsensus of the broad expertise on the subject within the Institute as well as those activities outside of IEEE whichhave expressed an interes
5、t in participating in the development of the standard.Use of an IEEE Standard is wholly voluntary. The existence of an IEEE Standard does not imply that there are no otherways to produce, test, measure, purchase, market, or provide other goods and services related to the scope of the IEEEStandard. F
6、urthermore, the viewpoint expressed at the time a standard is approved and issued is subject to changebrought about through developments in the state of the art and comments received from users of the standard. EveryIEEE Standard is subjected to review at least every five years for revision or reaff
7、irmation. When a document is morethan five years old, and has not been reaffirmed, it is reasonable to conclude that its contents, although still of somevalue, do not wholly reflect the present state of the art. Users are cautioned to check to determine that they have thelatest edition of any IEEE S
8、tandard.Comments for revision of IEEE Standards are welcome from any interested party, regardless of membership affiliationwith IEEE. Suggestions for changes in documents should be in the form of a proposed change of text, together withappropriate supporting comments.Interpretations: Occasionally qu
9、estions may arise regarding the meaning of portions of standards as they relate tospecific applications. When the need for interpretations is brought to the attention of IEEE, the Institute will initiateaction to prepare appropriate responses. Since IEEE Standards represent a consensus of all concer
10、ned interests, it isimportant to ensure that any interpretation has also received the concurrence of a balance of interests. For this reasonIEEE and the members of its technical committees are not able to provide an instant response to interpretation requestsexcept in those cases where the matter ha
11、s previously received formal consideration.Comments on standards and requests for interpretations should be addressed to:Secretary, IEEE Standards BoardP.O. Box 1331445 Hoes LanePiscataway, NJ 08855-1331USAIEEE Standards documents are adopted by the Institute of Electrical and Electronics Engineers
12、without regard towhether their adoption may involve patents on articles, materials, or processes. Such adoption does not assumeany liability to any patent owner, nor does it assume any obligation whatever to parties adopting the standardsdocuments.iiiForeword(This Foreword is not a part of IEEE C62.
13、92.2-1989, IEEE Guide for the Application of Neutral Grounding in Electrical UtilitySystems, Part IIGrounding of Synchronous Generator Systems.)This guide is the second in a series of documents on neutral grounding in electric utility systems. Part II covers theconsiderations and practices relating
14、to the grounding of synchronous generator systems.Emphasis in this guide is to be directed toward the grounding of synchronous generator systems in electric utilitysystems. Generator grounding practices used in industrial systems are covered in other guides and standards.At the time this guide was a
15、pproved, the Working Group for Part II had the following membership:S. G. Whisenant, Chair S. MazumdarW. S. OssmanG. S. HaralampuD. W. JacksonI. B. JohnsonJ. L. KoepfingerE. R. Taylor, Jr.O. Nigol J. R. DetweilerThe following persons were on the balloting committee that approved this document for su
16、bmission to the IEEEStandards Board:R. D. BallC. L. BallentineG. D. BreuerJ. J. BurkeJ. G. DaltonD. C. DawsonR. W. FlugumH. E. FoelkerG. L. GaibroisE. A. GoodmanR. HaasC. D. HansellG. S. HaralampuD. E. HedmanJ. A. HetrickA. R. HilemanW. W. HinesD. W. JacksonR. A. JonesS. S. KershawJ. L. KoepfingerS.
17、 KuznetsovG. E. LeeF. Lembo, Jr.D. W. LenkW. A. MaguireJ. A. MambueaE. H. Marrow, Jr.F. D. MartzloffD. J. MelvoldJ. J. NapiorkowskiO. NigolR. OdenbergJ. C. OsterhoutM. ParenteS. A. PotocnyR. RichmanE. RothongK. B. StumpL. D. SweeneyA. SweetanaD. P. SymanskiE. R. Taylor, Jr.A. C. WestromS. G. Whisena
18、ntE. J. YasudaWhen the IEEE Standards Board approved this standard on February 2, 1989, it had the following membership:Dennis Bodson, Chair Marco W. Migliaro, Vice Chair Andrew G. Salem, Secretary Arthur A. BlaisdellFletcher J. BuckleyAllen L. ClappJames M. DalyStephen R. DillonDonald C. Fleckenste
19、inEugene P. FogartyJay Forster*Thomas L. HannanKenneth D. HendrixTheodore W. Hissey, Jr.John W. HorchDavid W. HutchinsFrank D. KirschnerFrank C. KitzantidesJoseph L. Koepfinger*Edward LohseJohn E. May, Jr.Lawrence V. McCallL. Brace McClungDonald T. Michael*Richard E. MosherStig NilssonL. John Rankin
20、eGary S. RobinsonDonald W. Zipse*Member EmeritusivCLAUSE PAGE1. Scope and References .11.1 Scope 11.2 References 12. Objectives of Generator Grounding32.1 Minimizing Damage for Internal Ground Faults . 32.2 Limiting Mechanical Stress in the Generator for External Ground Faults 42.3 Limiting Overvolt
21、ages on Generator Insulation 42.4 Providing a Means of Generator System Ground-Fault Protection . 82.5 Coordinating with the Other Apparatus at Generator Voltage Level 83. Generator Grounding Types93.1 Unit-Connected Generation Systems . 93.2 Common Bus Generators without Feeders 133.3 Generators wi
22、th Feeders Directly Connected at Generated Voltage . 153.4 Three-Phase, 4-Wire Connected Generators 164. Bibliography16Annex A (Informative) Example of High-Resistance Grounding 18Annex B (Informative) Resonant Grounding of a Unit-Connected Generator System 221IEEE Guide for the Application of Neutr
23、al Grounding in Electrical Utility Systems Part IIGrounding of Synchronous Generator Systems1. Scope and References1.1 ScopeThis section summarizes the general considerations in grounding synchronous generator systems and discusses thefactors to be considered in the selection of a grounding class an
24、d the application of grounding methods. The guidelinesapply to both the large and small generators found in electric utility systems.It should be borne in mind by the user that this report is intended solely as a guide. Statements are necessarily of ageneral nature and, therefore, do not take into a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- IEEEC629221989ENGUIDEFORTHEAPPLICATIONOFNEUTRALGROUNDINGINELECTRICALUTILITYSYSTEMSPARTIIGROUNDINGOFSYNCHRONOUSGENERATORSYSTEMS

链接地址:http://www.mydoc123.com/p-1249276.html