ACI 351 1R-2012 Report on Grouting between Foundations and Bases for Support of Equipment and Machinery.pdf
《ACI 351 1R-2012 Report on Grouting between Foundations and Bases for Support of Equipment and Machinery.pdf》由会员分享,可在线阅读,更多相关《ACI 351 1R-2012 Report on Grouting between Foundations and Bases for Support of Equipment and Machinery.pdf(25页珍藏版)》请在麦多课文档分享上搜索。
1、ACI 351.1R-12Reported by ACI Committee 351Report on Grouting betweenFoundations and Bases for Supportof Equipment and MachineryReport on Grouting between Foundations and Bases for Supportof Equipment and MachineryFirst PrintingMarch 2012ISBN 978-0-87031-758-3American Concrete InstituteAdvancing conc
2、rete knowledgeCopyright by the American Concrete Institute, Farmington Hills, MI. All rights reserved. This material may not bereproduced or copied, in whole or part, in any printed, mechanical, electronic, film, or other distribution and storagemedia, without the written consent of ACI.The technica
3、l committees responsible for ACI committee reports and standards strive to avoid ambiguities, omissions,and errors in these documents. In spite of these efforts, the users of ACI documents occasionally find information orrequirements that may be subject to more than one interpretation or may be inco
4、mplete or incorrect. Users whohave suggestions for the improvement of ACI documents are requested to contact ACI via the errata website atwww.concrete.org/committees/errata.asp. Proper use of this document includes periodically checking for erratafor the most up-to-date revisions.ACI committee docum
5、ents are intended for the use of individuals who are competent to evaluate the significanceand limitations of its content and recommendations and who will accept responsibility for the application of thematerial it contains. Individuals who use this publication in any way assume all risk and accept
6、total responsibilityfor the application and use of this information.All information in this publication is provided “as is” without warranty of any kind, either express or implied, includingbut not limited to, the implied warranties of merchantability, fitness for a particular purpose or non-infring
7、ement.ACI and its members disclaim liability for damages of any kind, including any special, indirect, incidental, or conse-quential damages, including without limitation, lost revenues or lost profits, which may result from the use of thispublication.It is the responsibility of the user of this doc
8、ument to establish health and safety practices appropriate to thespecific circumstances involved with its use. ACI does not make any representations with regard to health andsafety issues and the use of this document. The user must determine the applicability of all regulatory limitationsbefore appl
9、ying the document and must comply with all applicable laws and regulations, including but not limited to,United States Occupational Safety and Health Administration (OSHA) health and safety standards.Participation by governmental representatives in the work of the American Concrete Institute and in
10、the developmentof Institute standards does not constitute governmental endorsement of ACI or the standards that it develops.Order information: ACI documents are available in print, by download, on CD-ROM, through electronic subscription, orreprint and may be obtained by contacting ACI.Most ACI stand
11、ards and committee reports are gathered together in the annually revised ACI Manual of ConcretePractice (MCP).American Concrete Institute38800 Country Club DriveFarmington Hills, MI 48331U.S.A.Phone: 248-848-3700Fax: 248-848-3701www.concrete.orgThis report provides an overview of current practices o
12、f grouting for support of equipment and machinery. Materials and instal-lation methods are described for epoxy and cementitious-based grouts used as the load-transfer material between equipment bases and their foundations.Characteristics of placed material, test methods for forecasting long-term per
13、formance, qualification of grout materials, founda-tion design and detailing considerations, and installation proce-dures are described.Keywords: bleeding; consistency tests; curing; durability; epoxy grout; cementitious-based grout; equipment grout; formwork (construction); foundations; grout; hydr
14、aulic cement grout; inspection; machinery grout; mixing; placing; sand-cement grout; stiffness; strength; tests; volume change.CONTENTSChapter 1Scope, p. 21.1ScopeChapter 2Definitions, p. 22.1DefinitionsChapter 3Grout, p. 23.1Requirements3.2Overview of nonshrink grouts3.3Selection3.4Common issuesCha
15、pter 4Nonshrink cementitious grouts, p. 54.1Introduction4.2Properties4.3Material requirements4.4TestingACI 351.1R-12Report on Grouting between Foundations and Bases for Support of Equipment and MachineryReported by ACI Committee 351David Kerins*, Chair Mukti L. Das*, SecretaryOmesh B. AbhatRichard P
16、. BohanWilliam L. BoundsWilliam D. Brant*Michael M. ChehabShu-Jin FangFred R. GoodwinShraddhakar HarshErick N. LarsonRobert R. McGlohn*Carl A. NelsonRichard OMalley*Michael A. Paipal*Ira W. PearceCharlie L. Rowan*William E. Rushing Jr.Yasser Salem*Larry W. SchulzePhilip A. Smith*WidiantoF. Alan Wile
17、ySheng-Chi Wu*Members of Subcommittee 351.1 who prepared this report. Subcommittee 351.1 Chair.1ACI Committee Reports, Guides, and Commentaries are intended for guidance in planning, designing, executing, and inspecting construction. This document is intended for the use of individuals who are compe
18、tent to evaluate the significance and limitations of its content and recommendations and who will accept responsibility for the application of the material it contains. The American Concrete Institute disclaims any and all responsibility for the stated principles. The Institute shall not be liable f
19、or any loss or damage arising therefrom.Reference to this document shall not be made in contract documents. If items found in this document are desired by the Architect/Engineer to be a part of the contract documents, they shall be restated in mandatory language for incorporation by the Architect/En
20、gineer.ACI 351.1R-12 supersedes ACI 351.1R-99 and was adopted and published March 2012.Copyright 2012, American Concrete Institute.All rights reserved including rights of reproduction and use in any form or by any means, including the making of copies by any photo process, or by electronic or mechan
21、ical device, printed, written, or oral, or recording for sound or visual reproduc-tion or for use in any knowledge or retrieval system or device, unless permission in writing is obtained from the copyright proprietors.Chapter 5Nonshrink epoxy grouts, p. 105.1Introduction5.2Properties5.3Material requ
22、irements5.4TestingChapter 6Design, detailing, and construction, p. 146.1Design and detailing considerations for grout6.2Preparation for grouting6.3Grout mixing and placing6.4Curing and protection6.5Quality control/assuranceChapter 7References, p. 217.1Referenced standards and reportsCHAPTER 1SCOPE1.
23、1ScopeThis report provides an overview of current practices for grouting to support equipment and machinery. Recommen-dations are provided for those portions of the grouting oper-ation where a consensus could be developed among knowl-edgeable manufacturers and users. Various approaches are outlined
24、for areas where opinions differ. Many statements and much of the information contained in this report are based on published manufacturers data and observations and practical experience by technical representatives and users. There is little current published research available at this time, but the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ACI3511R2012REPORTONGROUTINGBETWEENFOUNDATIONSANDBASESFORSUPPORTOFEQUIPMENTANDMACHINERYPDF

链接地址:http://www.mydoc123.com/p-1242809.html