VA FED H-08-1 SEC 07531-2003 PVC SHEET ROOFING《PVC板材屋面》.pdf
《VA FED H-08-1 SEC 07531-2003 PVC SHEET ROOFING《PVC板材屋面》.pdf》由会员分享,可在线阅读,更多相关《VA FED H-08-1 SEC 07531-2003 PVC SHEET ROOFING《PVC板材屋面》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、09-03M07531-1SECTION 07531PVC SHEET ROOFINGSPEC WRITER NOTES:1. Delete between /_ _ _/ if notapplicable to project. Also delete anyother item or paragraph not applicablein the section and renumber theparagraphs.2. Slopes: Do not use on slopes over 1:12(one inch per foot). Provide 1:50 (1/4inch per f
2、oot) minimum slope to drainswithout any “Gutters“ (no slopesbetween drains. NO EXCEPTIONS TOMINIMUM SLOPE. Slope crickets 1:50(1/4-inch per foot).3. Coordinate with plumbing requirementsfor roof drains and drain locations atlow points and mid span where maximumdeflection occurs. Do not put drains at
3、columns or on slopes. Coordinate withinsulation to provide “dishes“ atdrains.4. Coordinate details and systems used toprovide for code required fire ratedroofing system. Do not use unsurfacedmembranes over combustible insulationon decks.5. Use of adhered system is preferred overmechanically anchored
4、 or ballastedsystem.6. When a ballasted system is used:a. Coordinate to insure structuraldesign provides for square foot ofballast dead load for aggregate andpaving. Do not use on an existingstructure where the structural systemwill not take the ballast dead load.b. Design for wind uplift at site.c.
5、 Select rate of ballast applied inaccordance with FM Data Sheets 1-7,1-28, and Technical Advisory Bulletin(TAB) 1-29.d. Use pavers or loose aggregate, orboth, over membrane.e. Coordinate details to provide raisedroof edge 200 mm (8 inches) minimumabove surface of aggregate ballast orclamping device
6、for pavers at edge andstrapping where necessary when parapetwalls over 600 mm (24 inches) high donot occur.f. Do not use over loose laidinsulation.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-03M07531-27. Coordinate with Section 07220 for roofi
7、nsulation under the membrane. Decrease “R“ value 5 percent whenmechanical fasteners are used throughthe insulation to compensate forparallel heat flow.8. Do not use over polystyrene, urethane,or wood fiberboard insulation under themembrane.9. Do not use over bituminous materialswhere direct contact
8、occurs, includinggrease, oil, or other substances notcompatible with PVC. Use a thin layerof insulation, slip sheet or separatorsheet depending upon method ofattachment or felt back sheet whenminimum amount of asphalt occurs.10. Terminate base flashings not less than200 mm (8 inches) above roof surf
9、aceincluding curb for building expansionjoints.11. Do not put expansion joints at roofsurface level.12. Do not use “pitch pocket“ or “sealantpocket“ in lieu of base flashings andcap flashings.13. This specification is for use overconcrete, cellular insulating concretedecks, or insulation. Insertaddi
10、tional text when installed directlyto other decks or insulation systemsnot specified in Section 07220.PART 1 GENERAL1.1 DESCRIPTIONPolyvinyl Chloride (PVC) sheet roofing / adhered / mechanicallyfastened / ballasted / to roof deck.1.2 RELATED WORKA. Treated wood framing, blocking, and nailers: Sectio
11、n 06100, ROUGHCARPENTRY.B. Roof Insulation: / Section 07220, ROOF AND DECK INSULATION / Section07221, PROTECTIVE MEMBRANE ROOF INSULATION /.C. Aggregate and paver ballast: Section 07570, PAVERS AND AGGREGATE ROOFBALLAST.D. Metal cap flashings, copings, fascias, and expansion joints: Section07600, FL
12、ASHING AND SHEET METAL.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-03M07531-3E. Roof hatches, equipment supports, dome type skylights, and gravityventilators: Section 07800, ROOF ACCESSORIES.F. Mechanical equipment supports: Section 15822, FAN
13、S and Section 15840,DUCTWORK AND ACCESSORIES.1.3 QUALITY ASSURANCEA. Approved applicator by the membrane roofing system manufacturer, andcertified by the manufacturer as having the necessary expertise toinstall the specific system.B. Pre-Roofing Meeting:1. Upon completion of roof deck installation a
14、nd prior to any roofingapplication, hold a pre-roofing meeting arranged by the Contractorand attended by the Roofing Inspector, Material ManufacturersTechnical Representative, Roofing Applicator, Contractor, andResident Engineer.2. Discuss specific expectations and responsibilities, constructionproc
15、edures, specification requirements, application, environmentalconditions, job and surface readiness, material storage, andprotection.3. Inspect roof deck at this time to:a. Verify that work of other trades which penetrates roof deck iscompleted.b. Determine adequacy of deck anchorage, presence of fo
16、reignmaterial, moisture and unlevel surfaces, or other conditions thatwould prevent application of roofing system from commencing orcause a roof failure.c. Examine samples and installation instructions of manufacturer./d. Perform pull out test of fasteners (See paragraph 3.2). /1.4 SUBMITTALSA. Subm
17、it in accordance with Section 01340, SAMPLES AND SHOP DRAWINGS.B. Applicators approval certification by manufacturer.C. Shop Drawings:1. Sheet membrane layout.2. Fastener pattern, layout, and spacing requirements.3. Termination details.D. Manufacturers installation instructions revised for project.E
18、. Samples:Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-03M07531-41. Sheet membrane: One 150 mm (six inch) square piece.2. Sheet flashing: One 150 mm (six inch) square piece.3. Fasteners: Two, each type.4. Welded seam: Two 300 mm (12 inch) squar
19、e samples of welded seams torepresent quality of field welded seams.1.5 DELIVERY, STORAGE AND HANDLINGA. Deliver, store, and handle materials as specified by manufacturer.B. Store volatile materials separate from other materials with separationto prevent fire from damaging the work or other material
20、s.1.6 GUARANTEERoofing work subject to the terms of the Article GUARANTY of Section,GENERAL CONDITIONS, except extend the guaranty period to five years.1.7 APPLICABLE PUBLICATIONSA. Publications listed below form a part of this specification to theextent referenced. Publications are referenced in th
21、e text by the basicdesignation only.B. American Society for Testing and Materials (ASTM):A167-99.Stainless and Heat-Resisting Chromium-NickleSteel Plate, Sheet and StripB209-02.Aluminum and Aluminum-Alloy Sheet and plateD2103-02Polyethylene Film and SheetingD2240-02Rubber Property - Durometer Hardne
22、ssD4434-96Poly (Vinyl Chloride) Sheet RoofingD4586-00Asphalt Roof Cement, Asbestos FreeE96-00Water Vapor Transmission of MaterialsE108-00.Fire Tests of Roof CoveringsFl667-02Driven Fasteners: Nails, Spikes, and StaplesG21-96Resistance of Synthetic Polymeric Materials toFungiC. National Roofing Contr
23、actors Association (NRCA):Fifth Edition.The NRCA Roofing and Waterproofing Manual.D. Federal Specifications (Fed. Spec.)FF-S-107C (2).Screws, Tapping and DriveFF-S-111D (1).Screw, WoodProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-03M07531-5UU-B-
24、790A.Building Paper, Vegetable Fiber (Kraft,Waterproofed, Water Repellent and FireResistant)E. Factory Mutual Engineering and Research Corporation (FM):Annual IssueApproval Guide Building Materials.F. Underwriters Laboratories, Inc. (UL):Annual IssueBuilding Materials DirectoryAnnual IssueFire Resis
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VAFEDH081SEC075312003PVCSHEETROOFINGPVC 板材 屋面 PDF

链接地址:http://www.mydoc123.com/p-1075035.html