1、09-10 26 13 13 - 1 SECTION 26 13 13 GENERATOR PARALLELING CONTROLS SPEC WRITER NOTE: Delete between / - / if not applicable to project. Also delete any other item or paragraph not applicable to the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies the fu
2、rnishing, installation, and connection of medium- and low-voltage indoor switchgear control components for paralleling /Standby/ /and/ /Essential/ Electrical System generators. The generator paralleling control components shall be integral to the switchgear and be products of the same manufacturer.
3、B. For generator paralleling switchgear power components, including enclosures, bussing, and circuit breakers, see related specification sections. 1.2 RELATED WORK /A. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS: Requirements for seismic restraint of nonstructural
4、components./ A. Section 25 10 10, ADVANCED UTILITY METERING: Requirements for electrical metering. B. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General electrical requirements and items that are common to more than one section of Division 26. C. Section 26 05 26, GROUNDING AND BON
5、DING FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance path for possible fault currents. D. Section 26 05 71, ELECTRICAL SYSTEM PROTECTIVE DEVICE STUDY: Coordination study of overcurrent protection devices. E. Section 26 13 00, MEDIUM-VOLTAGE SWITCHGEAR: For me
6、dium-voltage enclosures, bussing, and circuit breakers for generator paralleling switchgear. F. Section 26 23 00, LOW-VOLTAGE SWITCHGEAR: For low-voltage enclosures, bussing, and circuit breakers for generator paralleling switchgear. G. Section 26 32 13, ENGINE-GENERATORS: Requirements for power gen
7、eration. H. Section 26 36 23, AUTOMATIC TRANSFER SWITCHES: Requirement for automatic transfer switches. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-10 26 13 13 - 2 1.3 QUALITY ASSURANCE Refer to Paragraph, QUALIFICATIONS, in Section 26 05 11,
8、REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. 1.4 FACTORY TESTS A. Generator paralleling controls shall be thoroughly tested at the factory to assure that there are no electrical or mechanical defects. Refer to related specification sections for tests. Tests shall be conducted as per UL and ANSI standa
9、rds. Factory tests shall be certified. B. Furnish four copies of certified manufacturers factory test reports to the /Resident Engineer/ /COTR/ prior to shipment of the generator paralleling switchgear to ensure that the switchgear has been successfully tested as specified. SPEC WRITER NOTE: Determi
10、ne if witness testing is a VA requirement. Edit or remove paragraph to conform to project requirements. /C. The Government shall have the option to witness the factory tests. The Government shall pay for all expenses of the Government Representatives trips to witness the testing. Notify the /Residen
11、t Engineer/ /COTR/ not fewer than 30 days prior to making tests at the factory./ 1.5 SUBMITTALS A. In accordance with Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, submit the following: B. Shop Drawings: 1. Per the requirements of /Section Section 26 13 00, MEDIUM-VOLTAGE SWITCHGEAR/
12、/Section 26 23 00, LOW-VOLTAGE SWITCHGEAR/. 2. Include sequences of operation and interconnecting controls diagrams, showing connections to generators, automatic transfer switches, and remote annunciators and controls. C. Manuals: 1. When submitting the shop drawings, submit companion copies of comp
13、lete maintenance and operating manuals, including technical data sheets, wiring diagrams, and information for ordering replacement parts. a. The terminals of wiring diagrams shall be identified to facilitate installation, maintenance, and operation. Provided by IHSNot for ResaleNo reproduction or ne
14、tworking permitted without license from IHS-,-,-09-10 26 13 13 - 3 b. Wiring diagrams shall indicate internal wiring for each piece of equipment and the interconnection between the pieces of equipment. c. Provide a clear and concise description of operation, including detailed information required t
15、o properly operate the equipment. d. Approvals shall be based on complete submissions of manuals together with shop drawings. 2. Two weeks prior to final inspection, deliver four copies of the final updated maintenance and operating manuals to the /Resident Engineer/ /COTR/. a. The manuals shall be
16、updated to include any information necessitated by shop drawing approval. b. Complete “As Installed“ wiring and schematic diagrams shall be included, showing all pieces of equipment and their interconnecting wiring. c. Show all terminal identification. d. Include information for testing, repair, tro
17、uble-shooting, assembly, disassembly, and factory recommended/required periodic maintenance procedures and frequency. e. Provide a replacement and spare parts list. Include a list of tools and instruments for testing and maintenance purposes. f. Furnish manuals in loose-leaf binder or manufacturers
18、standard binder. D. Certifications: Two weeks prior to the final inspection, submit four copies of the following certifications to the /Resident Engineer/ /COTR/: 1. Certification by the manufacturer that the materials conform to the requirements of the drawings and specifications. 2. Certification
19、by the contractor that the materials have been properly installed, connected, and tested. SPEC WRITER NOTE: Refer to VA Handbook H-18-8 for Seismic Design Requirements. Specify Region of Seismicity, based on location of the equipment so motor control center manufacturers can check/design seismic str
20、ength of their equipment. Delete the following paragraph if the motor control center(s) is located outside the seismic zone. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-10 26 13 13 - 4 3. Certification from the manufacturer that the generator
21、paralleling controls will withstand any seismic forces and that the unit will be fully operational after the seismic event at the project site. 1.6 APPLICABLE PUBLICATIONS Per the requirements of related specification sections. PART 2 - PRODUCTS 2.1 MASTER CONTROL CUBICLE A. Shall contain all system
22、-totalizing controls for the integrated system operation as specified below: 1. Bus Metering: a. AC ammeter. b. AC voltmeter. c. Frequency meter 55-65 Hz Scale. d. Watt/Var meter. e. Ammeter/Voltmeter phase selector switches with current and potential transformers and proper fuses. 2. Reverse Power
23、Monitors: Solid-state reverse power monitors shall be furnished to sense motorizing of a failing engine-generator set. Upon detection of a reverse power flow, the monitor shall signal the alarm circuit for immediate power disconnect of the generator and actuation of load dumping circuits, and energi
24、ze the audible and visual alarm signals. Monitors shall automatically reset the open generator disconnect from the bus. An induction disc type reverse power relay with equivalent performance may be submitted for approval. The monitor shall have the following features: a. Accurate operation at power
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2613132010GENERATORPARALLELINGCONTROLSPDF

链接地址:http://www.mydoc123.com/p-1074955.html