1、09-10 26 13 00 - 1 SECTION 26 13 00 MEDIUM-VOLTAGE SWITCHGEAR SPEC WRITER NOTE: Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing,
2、installation, connection and testing of the medium voltage switchgear. 1.2 RELATED WORK A. Section 09 06 00, SCHEDULE FOR FINISHES: Finishes for outdoor switchgear. /B. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS: Requirement for Seismic Restraint for Nonstructural
3、 Components./ C. Section 25 10 10, ADVANCED UTILITY METERING: Electricity meters installed in medium voltage switchgear. D. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General electrical requirements that are common to more than one section of Division 26. E. Section 26 05 13, MEDIU
4、M-VOLTAGE CABLES: Medium voltage cables and splices. F. Section 26 05 21, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW): Cables and wiring. G. Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance p
5、ath to ground for possible ground fault currents. H. Section 26 05 71, ELECTRICAL SYSTEM PROTECTIVE DEVICE STUDY: Short circuit and coordination study. /I. Section 26 13 13, GENERATOR PARALLELING CONTROLS: For switchgear used as part of a generator paralleling system./ J. Section 26 18 41, MEDIUM-VO
6、LTAGE SWITCHES: Medium-voltage switches. K. Section 26 24 16, PANELBOARDS: For panelboards integral to the medium-voltage switchgear. 1.3 QUALITY ASSURANCE Refer to Paragraph, QUALIFICATIONS, in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. Provided by IHSNot for ResaleNo reproduction
7、 or networking permitted without license from IHS-,-,-09-10 26 13 00 - 2 1.4 FACTORY TESTS A. Medium voltage switchgear shall be thoroughly tested at the factory to assure that there are no electrical or mechanical defects. Tests shall be conducted as per UL and ANSI Standards. Factory tests shall b
8、e certified. B. Thoroughly test the switchgear at the factory with the circuit breakers in the connected position in their cubicles. The factory tests shall be in accordance with IEEE C37.09 and shall include the following tests: 1. Design Tests 2. Production Tests 3. Conformance Tests: These tests
9、shall also include testing as required in ANSI C37.55, C37.57 and NEMA C37.54. C. The following additional tests shall be performed: 1. Verify that circuit breaker sizes and types correspond to drawings and coordination study. 2. Verify that current and voltage transformer ratios correspond to drawi
10、ngs. 3. Verify tightness of bolted electrical connections by calibrated torque-wrench method in accordance with manufacturers published data. 4. Confirm correct operation and sequencing of electrical and mechanical interlock systems by attempting closure on locked-open devices, and attempting to ope
11、n locked-closed devices, and making key exchange with devices operated in off-normal positions. 5. Verify correct barrier and shutter installation and operation. 6. Exercise all active components. 7. Inspect indicating devices for correct operation. 8. Perform a dielectric withstand voltage test on
12、each bus section, each phase-to-ground with phases not under test grounded, in accordance with manufacturers published data. The test voltage shall be applied for one minute. 9. Perform insulation-resistance tests on control wiring with respect to ground. Applied potential shall be 500 volts dc for
13、300-volt rated cable and 1000 volts dc for 600-volt rated cable, or as required if solid-state components or control devices cannot tolerate the applied voltage. 10. If applicable, verify correct function of control transfer relays located in the switchgear with multiple control power sources. 11. P
14、erform phasing checks on double-ended or dual-source switchgear to insure correct bus phasing from each source. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-10 26 13 00 - 3 D. Furnish four (4) copies of certified manufacturers factory test repo
15、rts to the Resident Engineer prior to shipment of the switchgear to ensure that the switchgear has been successfully tested as specified. SPEC WRITER NOTE: Determine if witness testing is a VA requirement. Edit or remove paragraph to conform to project requirements. /E. The Government shall have an
16、option to witness the factory tests. All expenses of the Government Representatives trips to witness the testing will be paid by the Government. Notify the Resident Engineer not less than 30 days prior to making tests at the factory./ 1.5 SUBMITTALS A. In accordance with Section 26 05 11, REQUIREMEN
17、TS FOR ELECTRICAL INSTALLATIONS, submit the following: B. Shop Drawings: 1. Shop drawings shall not be submitted until the Electrical System Protective Device Study has been submitted and approved. 2. Provide detailed drawings with sufficient information, clearly presented, to determine compliance w
18、ith drawings and specifications. 3. Prior to fabrication of switchgear, submit four copies of the following data for approval: a. Complete electrical ratings b. Circuit breaker sizes c. Interrupting ratings d. Safety features e. Accessories and nameplate data f. One line diagram of the primary distr
19、ibution system. g. Elementary and interconnection wiring diagrams. h. Technical data for each component. i. Dimensioned exterior views of the switchgear. j. Dimensioned section views of the switchgear. k. Floor plan of the switchgear. l. Foundation plan for the switchgear. m. Provisions and required
20、 locations for external conduit and wiring entrances. n. Dimensions and approximate design weights. /4. Obtain and submit written approval from the electric utility, that the equipment and material interface with the customer meets with their requirements and approval./ C. Manuals: 1. Submit, simult
21、aneously with the shop drawings, companion copies of complete maintenance and operating manuals, including technical data Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-09-10 26 13 00 - 4 sheets, wiring diagrams, and information for ordering replace
22、ment parts. a. Include complete interconnection diagrams that show all components of the switchgear line-up. b. Include complete diagrams of the internal wiring for each of the items of equipment. c. The diagrams shall identify the terminals to facilitate in the installation, maintenance and operati
23、on. d. Approvals will be based on complete submissions of manuals together with shop drawings. 2. Two weeks prior to the project final inspection or the inspection of the applicable phase that includes switchgear installation, submit four copies of a final updated maintenance and operating manual to
24、 the Resident Engineer. Update the manual to include any information necessitated by shop drawing approval. D. Test Reports: 1. Submit four copies of certified conformance test reports for approval. Reports shall include, but not be limited to, interrupting, short time, momentary, BIL, high potentia
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2613002010MEDIUMVOLTAGESWITCHGEARPDF