1、4-09 26 11 16 - 1 SECTION 26 11 16 SECONDARY UNIT SUBSTATIONS SPEC WRITER NOTE: Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable to the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION This section specifies the furnishing,
2、installation, and connection of the secondary unit substation, complete and ready for operation. 1.2 RELATED WORK /A. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS: Requirement for seismic restraint for nonstructural components./ B. Section 26 05 11, REQUIREMENTS FOR
3、 ELECTRICAL INSTALLATIONS: General electrical requirements and items that are common to more than one section of Division 26. C. Section 26 05 71, ELECTRICAL SYSTEM PROTECTIVE DEVICE STUDY: Electrical coordination study of overcurrent protection devices. D. Section 26 05 33, RACEWAY AND BOXES FOR EL
4、ECTRICAL SYSTEMS: Conduits and outlet boxes. E. Section 26 25 11, BUSWAYS: Feeder busways and fittings. F. Section 26 05 13, MEDIUM-VOLTAGE CABLES: Medium voltage cables. G. Section 26 05 21, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW): Low voltage cable and wiring. H. S
5、ection 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance path for possible ground fault currents. I. Section 26 09 13, ELECTRICAL POWER MONITORING AND CONTROL: For metering devices integral to the secondary unit substation. J. Se
6、ction 26 13 00, MEDIUM-VOLTAGE SWITCHGEAR: Medium-voltage circuit breakers for use in secondary unit substations. K. Section 26 18 41, MEDIUM-VOLTAGE SWITCHES: Medium-voltage switches for use in secondary unit substations. L. Section 26 24 11, DISTRIBUTION SWITCHBOARDS: Secondary distribution switch
7、boards. M. Section 26 23 00, LOW-VOLTAGE SWITCHGEAR: Secondary distribution switchgear. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4-09 26 11 16 - 2 1.3 QUALITY ASSURANCE Refer to Paragraph, QUALIFICATIONS, in Section 26 05 11, REQUIREMENTS FOR
8、ELECTRICAL INSTALLATIONS. 1.4 FACTORY TESTS A. Substations shall be thoroughly tested at the factory to assure that there are no electrical or mechanical defects. Tests shall be conducted as per UL and ANSI Standards. Factory tests shall be certified. The following tests shall be performed: 1. Mediu
9、m Voltage Section: Refer to Section 26 18 41, MEDIUM-VOLTAGE SWITCHES, and Section 26 13 00, MEDIUM-VOLTAGE SWITCHGEAR. 2. Transformer Section: a. Perform insulation-resistance tests winding-to-winding and each winding-to-ground. b. Perform turns-ratio tests at all tap positions. 3. Low Voltage Sect
10、ion: Refer to Section 26 23 00, LOW VOLTAGE SWITCHGEAR, and Section 26 24 11, DISTRIBUTION SWITCHBOARDS. 1.5 SUBMITTALS Submit in accordance with Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: A. Shop Drawings: 1. Include sufficient information, clearly presented, to determine complian
11、ce with drawings and specifications. 2. Include electrical ratings, dimensions, mounting details, winding materials, required clearances, terminations, fuses (if required), safety features, weight, decibel rating, temperature rise, nominal impedance, regulation, no load and full load losses, wiring
12、and connection diagrams, front, side and rear elevations, sectional views, coordination curves, transformer no-load and full-load losses, accessories and nameplate data. B. Manuals: 1. Submit, simultaneously with the shop drawings, companion copies of complete maintenance and operating manuals inclu
13、ding technical data sheets, wiring diagrams, and information for ordering replacement parts. It shall also include installation, operating instructions, maintenance, trouble shooting and repair procedures and technical literature pertaining to all components or instruments provided. 2. Two weeks pri
14、or to final inspection, submit four copies of the final up-dated maintenance and operating manuals to the Resident Engineer. C. Tests: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4-09 26 11 16 - 3 1. Submit, simultaneously with the shop drawings,
15、 certification that the following tests were performed at the factory: insulation-resistance tests, high-potential tests, D. Certificates: 1. Two weeks prior to final inspection, submit four copies of the following to the Resident Engineer: a. Certification by the Contractor that the substations hav
16、e been properly installed, adjusted, and tested, including final circuit breaker settings. b. Certified copies of all of the factory design and production tests, field test data sheets and reports for the substations. SPEC WRITE NOTE: Include the following paragraph for seismic areas. /2. Submit cer
17、tification that the equipment will withstand seismic forces at location being installed. Include the following: a. Basis of Certification: Indicate whether withstand certification is based on actual test of assembled components or on calculation. b. The term “withstand“ means “the unit will remain i
18、n place without separation of any parts from the equipment when subjected to the seismic forces as per specification Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS, and the unit will be fully operational after the seismic event.“/ 1.6 APPLICABLE PUBLICATIONS A. Public
19、ations listed below (including amendments, addenda, revisions, supplements, and errata), form a part of this specification to the extent referenced. Publications are referenced in the text by basic designation only. B. American Concrete Institute (ACI): ACI 318 Building Code Requirements for Structu
20、ral Concrete. C. American Society for Testing and Materials (ASTM): D3487 Standard Specification for Mineral Insulating Oil Used in Electrical Apparatus. D. Institute of Electrical and Electronic Engineers (IEEE): C37.121 . American National Standard for Switchgear Unit Substations Requirements C62.
21、11 . Metal Oxide Surge Arresters for AC Power Circuits C62.41 . Surge Voltage in Low Voltage AC Power circuits Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4-09 26 11 16 - 4 C57.12.00 Standard General Requirements for Liquid-Immersed Distribution,
22、 Power, and Regulating Transformers C57.12.01 Standard General Requirements for Dry-Type Distribution and Power Transformers Including Those with Solid Cast and/or Resin Encapsulated Windings E. National Fire Protection Association (NFPA): 70 . National Electrical Code (NEC): PART 2 - PRODUCTS 2.1 G
23、ENERAL REQUIREMENTS A. Secondary unit substation shall be in accordance with ASTM, ANSI, IEEE, NEC, and as shown on the drawings. SPEC WRITER NOTE: Designer shall choose liquid-filled or dry transformers to meet project requirements. B. The secondary unit substation shall be a complete, grounded, co
24、ntinuous-duty, unitized integral assembly; metal clad, dead-front, dead-rear type; with /liquid-immersed/ /dry/ transformer. Substation shall be designed for /outdoor/ /indoor/ service with ventilation openings /and gasketing provided to ensure a weatherproof assembly under rain, snow, sleet, and hu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2611162009SECONDARYUNITSUBSTATIONSPDF