VA 09 65 16-2010 RESILIENT SHEET FLOORING.pdf
《VA 09 65 16-2010 RESILIENT SHEET FLOORING.pdf》由会员分享,可在线阅读,更多相关《VA 09 65 16-2010 RESILIENT SHEET FLOORING.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、07-10 09 65 16 - 1 SECTION 09 65 16 RESILIENT SHEET FLOORING SPEC WRITER NOTE: Delete between / - / if not applicable to project. Also delete any other items or paragraphs not applicable in section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies the installati
2、on of sheet flooring with backing and integral cove base. B. Grades of resilient sheet vinyl floor covering without backing having vinyl plastic wearlayer with backing. C. Installation of sheet flooring including following: 1. Heat welded seams. 2. Integral cove base: Installed at intersection of fl
3、oor and vertical surfaces. 1.2 RELATED WORK A. Concrete floors: Section 03 30 00, CAST-IN-PLACE CONCRETE. B. Color, pattern and texture: Section 09 06 00, SCHEDULE FOR FINISHES. C. Resilient base required over metal base of casework: Section 12 31 00, MANUFACTURED METAL CASEWORK. D. Resilient base o
4、ver base of lockers, equipment and casework: Section 09 65 13, RESILIENT BASE AND ACCESSORIES. E. Unbacked vinyl (homogenous) sheet flooring with welded seams: Section 09 65 16, RESILIENT SHEET FLOORING. 1.3 QUALITY CONTROL-QUALIFICATIONS: A. The Contracting Officer shall approve products or service
5、 of proposed manufacturer, suppliers, and installers, and the Contractor shall submit certification that: 1. Heat welded seaming is manufacturers prescribed method of installation. 2. Installer is approved by manufacturer of materials and has technical qualifications, experience, trained personnel,
6、and facilities to install specified items. 3. Manufacturers product submitted has been in satisfactory operation, on three installations similar and equivalent in size to this project for three years. Submit list of installations. B. The sheet vinyl floor coverings shall meet fire performance charac
7、teristics as determined by testing products, per ASTM test method, indicated below by Underwriters Laboratories, Inc. (UL) or another Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-10 09 65 16 - 2 recognized testing and inspecting agency acceptab
8、le to authorities having jurisdiction. 1. Critical Radiant Flux: 0.45 watts per sq. cm or more, Class I, per ASTM E648. 2. Smoke Density: Less than 450 per ASTM E662. C. The floor covering manufacturer shall certify that products supplied for installation comply with local regulations controlling us
9、e of volatile organic compounds (VOCs). 1.4 SUBMITTALS A. In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, submit following: B. Manufacturers Literature and Data: 1. Description of resilient material and accessories to be provided. 2. Resilient material manufacturers re
10、commendations for adhesives, weld rods, sealants, and underlayment. 3. Application and installation instructions. C. Samples: 1. Sheet material, 38 mm by 300 mm (1-1/2 inch by 12 inch), of each color and pattern with a welded seam using proposed welding rod / 300 mm (12 inches) square for each type,
11、 pattern and color/. 2. Cap strip and fillet strip, 300 mm (12 inches) for integral base. 3. Shop Drawings and Certificates: Layout of joints showing patterns where joints are expressed, and type and location of obscure type joints. Indicate orientation of directional patterns. 4. Certificates: Qual
12、ity Control Certificate Submittals and lists specified in paragraph, QUALIFICATIONS. 5. Edge strips: 150 mm (6 inches) long each type. 6. Adhesive, underlayment and primer: Pint container, each type. 1.5 PROJECT CONDITIONS A. Maintain temperature of floor materials and room, where work occurs, above
13、 18 C (65 F) and below 38 C (100 F) for 48 hours before, during and for 48 hours after installation. After above period, room temperature shall not fall below 13 C (55 F). B. Construction in or near areas to receive flooring work shall be complete, dry and cured. Do not install resilient flooring ov
14、er slabs until they have been cured and are sufficiently dry to achieve a bond with adhesive. Follow flooring manufacturers recommendations for bond and moisture testing. C. Building shall be permanently enclosed. Schedule construction so that floor receives no construction traffic when completed. P
15、rovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-10 09 65 16 - 3 1.6 DELIVERY, STORAGE AND HANDLING A. Deliver materials to site in original sealed packages or containers; labeled for identification with manufacturers name and brand. B. Deliver shee
16、t flooring full width roll, completely enclosed in factory wrap, clearly marked with the manufacturers number, type and color, production run number and manufacture date. C. Store materials in weathertight and dry storage facility. Protect from damage due to handling, weather, and construction opera
17、tions before, during and after installation. Store sheet flooring on end with ambient temperatures maintained as recommended by manufacturer. D. Store sheet flooring on end. E. Move sheet vinyl floor coverings and installation accessories into spaces where they will be installed at least 48 hours in
18、 advance of installation. 1.7 APPLICABLE PUBLICATIONS A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only. B. American Society For Testing Materials (ASTM): E648-09 Critical Radiant Flux of Floor-Covering
19、Systems Using a Radiant Energy Source. E662-09 Specific Optical Density of Smoke Generated by Solid Materials. F710-08. . Practice for Preparing Concrete Floors and Other Monolithic Floors to Receive Resilient Flooring. F1303-04 . Sheet Vinyl Floor Covering with Backing. F1869-04 . Moisture Vapor Em
20、ission Rate of Concrete Subfloor using Anhydrous Calcium Chloride F1913-04 . Sheet Vinyl Flooring without Backing F2170-09 . Determining Relative Humidity in Concrete Floor Slabs using In-situ Probes C. Resilient Floor Covering Institute (RFCI): Recommended Work Practices for Removal of Resilient Fl
21、oor Coverings. 1.8 SCHEDULING Interior finish work such as plastering, drywall finishing, concrete, terrazzo, ceiling work, and painting work shall be complete and dry before installation. Mechanical, electrical, and other work above ceiling line shall be completed. Heating, ventilating, and air con
22、ditioning systems shall be installed and operating in order to maintain temperature and humidity requirements. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-10 09 65 16 - 4 1.9 WARRANTY: Submit written warranty, in accordance with FAR clause 52.
23、246-21, Warranty of Construction requirements except that warranty period shall be extended to include two (2) years. PART 2 - PRODUCTS SPEC WRITER NOTE: Make material requirements agree with applicable requirements specified in the referenced Applicable Publications. Update and specify only that wh
24、ich applies to the project. 2.1 SHEET VINYL FLOOR COVERINGS A. Sheet Vinyl Floor Coverings: Smooth face, minimum thickness nominal 2 mm (0.08 inch). Sheet flooring shall conform to ASTM F1913 and material requirements specified in ASTM F1303, Type II, Grade 1, backing classification not applicable.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0965162010RESILIENTSHEETFLOORINGPDF