1、07-10 07 08 00 - 1 SECTION 07 08 00 FACILITY EXTERIOR CLOSURE COMMISSIONING PART 1 - GENERAL 1.1 DESCRIPTION A. The requirements of this Section apply to all sections of Division 07 and Division 08. B. This project will have selected building systems commissioned. The complete list of equipment and
2、systems to be commissioned is specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A Commissioning Agent (CxA) appointed by the VA will manage the
3、 commissioning process. 1.2 RELATED WORK A. Section 01 00 00 GENERAL REQUIREMENTS. B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. 1.3 SUMMARY A. This Section includes requirements for commissioning the Facility exterior closure,
4、related subsystems and related equipment. This Section supplements the general requirements specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. B. The commissioning activities have been developed to support the VA requirements to meet guidelines for Federal Leadership in Environmental,
5、 Energy, and Economic Performance. SPEC WRITER NOTE: Paragraph C is for LEED projects. Delete paragraph or subparagraphs as necessary for specific projects. C. The commissioning activities have been developed to support the United States Green Building Council (USGBC) LEED rating program and to supp
6、ort delivery of project performance in accordance with the Contract Documents developed with the approval of the VA. 1. Commissioning activities and documentation for the LEED section on “Energy and Atmosphere” prerequisite of “Fundamental Building Systems Commissioning”. Provided by IHSNot for Resa
7、leNo reproduction or networking permitted without license from IHS-,-,-07-10 07 08 00 - 2 2. Commissioning activities and documentation for the LEED section on “Energy and Atmosphere” requirements for the “Enhanced Building System Commissioning” credit. 3. Activities and documentation for the LEED s
8、ection on “Measurement and Verification” requirements for the Measurement and Verification credit. D. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members. 1.4 DEFINIT
9、IONS A. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for definitions. 1.5 COMMISSIONED SYSTEMS A. Commissioning of a system or systems specified in Division 07 and Division 08 is part of the construction process. Documentation and testing of these systems, as well as training of the
10、VAs Operation and Maintenance personnel, is required in cooperation with the VA and the Commissioning Agent. SPEC WRITER NOTE: Paragraph B should list the specific systems that will be commissioned. Edit the list as necessary for specific projects. The list below should match the list included in Se
11、ction 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. It is recommended that the list included in Section 01 91 00 be developed first and then copied/pasted into the list below. Both lists should be identical to prevent confusion. B. The following Facility exterior closure systems will be commissioned:
12、 1. Roofs (Asphalt shingles, slate shingles, wood shingles, clay roof tiles, built-up bituminous, modified bituminous, EPDM, PVC, fluid-applied, sprayed polyurethane, flashing & sheet metal, metal roofing, roof specialties, and roof accessories) 2. Exterior Insulation and Finish Systems (EIFS) 3. Cu
13、rtain Wall Systems (Mullions, glazing, and sealing) 4. Exterior Doors (Revolving, glass leaf, emergency exit, and service) 5. Exterior Windows (Aluminum, steel, glazing, storm) 6. Louvers and Vents 7. Sealants (Caulking, mechanical seals, and wind and vapor barriers) Provided by IHSNot for ResaleNo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0708002010FACILITYEXTERIORCLOSURECOMMISSIONINGPDF

链接地址:http://www.mydoc123.com/p-1074701.html