1、 10-10 07 01 50.19 - 1 SECTION 07 01 50.19 PREPARATION FOR RE-ROOFING SPEC WRITER NOTES: 1. Delete text in / / if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. Edit Description article below after establishing re-roof
2、ing scope and editing section to correspond to Project requirements. PART 1 - GENERAL 1.1 DESCRIPTION A. /Roof tear-off,/ /partial roof tear-off,/ /temporary roofing membrane,/ /roof re-cover preparation,/ /removal of base flashings/ on existing construction in preparation to receive new roofing mem
3、brane. SPEC WRITER NOTE: Modify paragraph below to adequately describe existing roofing system or systems to be prepared for re-roofing. B. Existing Membrane Roofing System: /Built-up asphalt/ /Built-up coal-tar/ /EPDM/ /CSPE/ /PVC/ /TPO/ /Modified bituminous/ roofing membrane, with related insulati
4、on, surfacing, and components and accessories between deck and roofing membrane. SPEC WRITER NOTE: References in Related Work article below are in addition to cross-references to other sections located in the section text. 1.2 RELATED WORK A. Use of the premises and phasing requirements: Section 01
5、00 00 GENERAL REQUIREMENTS. B. Temporary construction and environmental-protection measures for reroofing preparation: Section 01 00 00 GENERAL REQUIREMENTS C. HVAC equipment removal and reinstallation: Division 23 sections. D. Electrical equipment disconnection and reconnection: Division 26 section
6、s. 1.3 APPLICABLE PUBLICATIONS SPEC WRITER NOTES: 1. Update applicable publications to current issue at time of project specification preparation. 2. Update material requirements to agree with applicable requirements (types, grades, classes,) specified in the referenced Applicable Publications. Prov
7、ided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-10 07 01 50.19 - 2 A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only. Editions of applicable p
8、ublications current on date of issue of bidding documents apply unless otherwise indicated. B. American National Standards Institute/Single-Ply Roofing Institute (ANSI/SPRI): ANSI/SPRI FX-1-01(R2006) Standard Field Test Procedure for Determining the Withdrawal Resistance of Roofing Fasteners. C. AST
9、M International (ASTM): C208-08.Cellulosic Fiber Insulating Board C728-05.Perlite Thermal Insulation Board C1177/C1177M-08.Standard Specification for Glass Mat Gypsum Substrate for Use as Sheathing C1278/C1278M-07.Standard Specification for Fiber-Reinforced Gypsum Panel D1079-09Standard Terminology
10、Relating to Roofing and Waterproofing D. FM Approvals: RoofNav Approved Roofing Assemblies and Products. 4450-89.Approved Standard for Class 1 Insulated Steel Deck Roofs 4470-10.Approved Standard for Class 1 Roof Coverings 1-28-09.Loss Prevention Data Sheet: Design Wind Loads. 1-29-09.Loss Preventio
11、n Data Sheet: Above-Deck Roof Components 1-49-09.Loss Prevention Data Sheet: Perimeter Flashing E. National Roofing Contractors Association: Roofing and Waterproofing Manual 1.4 MATERIALS OWNERSHIP A. Assume ownership of demolished materials and remove from Project site and dispose of legally, unles
12、s indicated to be reused, reinstalled, or otherwise to remain Owners property. 1.5 DEFINITIONS A. Refer to ASTM D1079 and NRCA “The NRCA Roofing and Waterproofing Manual“ for definition of terms. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-10
13、07 01 50.19 - 3 1.6 QUALITY CONTROL A. Requirements of Division 07 roofing section for qualifications of roofing system and roofing insulation Installer; work of this section shall be performed by same Installer. 1. Where Project requirements include removal of asbestos-containing material, Installe
14、r must be legally qualified to perform the required work. 2. Where Project requirements include work affecting existing roofing system to remain under warranty, Installer must be approved by warrantor of existing roofing system. B. Regulatory Requirements: Comply with governing EPA notification regu
15、lations. Comply with hauling and disposal regulations of authorities having jurisdiction. C. Reroofing Conference: Conduct conference at Project site. 1. Meet with Owner; Architect-Engineer; testing and inspecting agency representative; roofing system manufacturers representative; roofing Installer
16、including project manager, superintendent, and foreman; and installers whose work interfaces with or affects reroofing. 2. Review methods and procedures related to roofing system tear-off and replacement 1.7 SUBMITTALS A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND S
17、AMPLES. B. Manufacturers Literature and Data: 1. Recover boards. C. List of proposed infill materials. D. List of proposed temporary roofing materials. E. Fastener pull-out test report. F. Photographs or Videotape: Document existing conditions of adjacent construction including site improvements. G.
18、 Landfill Records: Indicate receipt and acceptance of hazardous wastes by a licensed landfill facility. H. Qualification Data: For Installer. 1. Certificate indicating Installer is licensed to perform asbestos abatement. 2. Certificate indicating Installer is approved by warrantor of existing roofin
19、g system. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-10-10 07 01 50.19 - 4 1.8 PROJECT CONDITIONS A. Owner will occupy portions of building below reroofing area. Conduct reroofing so Owners operations will not be disrupted. 1. Coordinate work ac
20、tivities daily with Owner. 2. Provide Owner with not less than 72 hours notice of activities that may affect Owners operations. SPEC WRITER NOTE: Retain subparagraph below if known impaired deck areas. B. Protect building and landscaping from damage. C. Maintain access to existing walkways and adjac
21、ent occupied facilities. D. Available Information: The following are available for Contractor reference: SPEC WRITER NOTE: Retain three subparagraphs below if applicable. Consider including this information in Division 00 Document “Available Information.“ 1. Roof Moisture Survey of existing membrane
22、 roofing system. 2. Analysis of test cores from existing membrane roofing system. 3. Construction Drawings and Project Manual for existing roofing system. 4. Contractor is responsible for interpretation and conclusions based upon available information. E. Weather Limitations: Proceed with reroofing
23、preparation only when weather conditions permit Work to proceed without water entering existing roofing system or building. SPEC WRITER NOTE: Retain one of two paragraphs below or delete if no hazardous materials. Modify to correspond to Project requirements. F. Hazardous Materials: It is not expect
24、ed that Contractor will encounter hazardous materials such as asbestos-containing materials. 1. Owner will remove hazardous materials before start of the Work. 2. Do not disturb materials suspected of containing hazardous materials. Notify Architect-Engineer and Owner. Hazardous materials will be re
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA070150192010PREPARATIONFORREROOFINGPDF