1、07-11 02 82 13.31 - i SECTION 02 82 13.31 ASBESTOS TRANSITE ABATEMENT TABLE OF CONTENTS PART 1 - GENERAL 1 1.1 SUMMARY OF THE WORK . 1 1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS . 1 1.1.2 EXTENT OF WORK 2 1.1.3 RELATED WORK 2 1.1.4 TASKS . 2 1.1.5 ABATEMENT CONTRACTOR USE OF PREMISES 2 1.2 VA
2、RIATIONS IN QUANTITY 3 1.3 STOP ASBESTOS REMOVAL . 3 1.4 DEFINITIONS . 4 1.4.1 GENERAL . 4 1.4.2 GLOSSARY 4 1.4.3 REFERENCED STANDARDS ORGANIZATIONS . 10 1.5 APPLICABLE CODES AND REGULATIONS . 11 1.5.1 GENERAL APPLICABILITY OF CODES, REGULATIONS, AND STANDARDS . 11 1.5.2 CONTRACTOR RESPONSIBILITY 12
3、 1.5.3 FEDERAL REQUIREMENTS . 12 1.5.4 STATE REQUIREMENTS . 12 1.5.5 LOCAL REQUIREMENTS . 13 1.5.6 STANDARDS 13 1.5.7 EPA GUIDANCE DOCUMENTS . 13 1.5.8 NOTICES 13 1.5.9 PERMITS/LICENSES . 14 1.5.10 POSTING AND FILING OF REGULATIONS . 14 1.5.11 VA RESPONSIBILITIES . 14 1.5.13 EMERGENCY ACTION PLAN AN
4、D ARRANGEMENTS 14 1.5.14 PRE-CONSTRUCTION MEETING 15 1.6 PROJECT COORDINATION . 16 1.6.1 PERSONNEL 16 1.7 RESPIRATORY PROTECTION . 17 1.7.1 GENERAL - RESPIRATORY PROTECTION PROGRAM . 17 1.7.2 RESPIRATORY PROTECTION PROGRAM COORDINATOR . 17 1.7.3 SELECTION AND USE OF RESPIRATORS . 17 1.7.4 MINIMUM RE
5、SPIRATORY PROTECTION . 17 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 13.31 - ii 1.7.5 MEDICAL WRITTEN OPINION 17 1.7.6 RESPIRATOR FIT TEST 18 1.7.7 RESPIRATOR FIT CHECK . 18 1.7.8 MAINTENANCE AND CARE OF RESPIRATORS 18 1.8 WORKER PRO
6、TECTION 18 1.8.1 TRAINING OF ABATEMENT PERSONNEL 18 1.8.2 MEDICAL EXAMINATIONS . 18 1.8.3 PERSONAL PROTECTIVE EQUIPMENT 18 1.8.4 REGULATED AREA ENTRY PROCEDURE . 19 1.8.5 DECONTAMINATION PROCEDURE 19 1.8.6 REGULATED AREA REQUIREMENTS 19 PART 2 - PRODUCTS, MATERIALS AND EQUIPMENT . 20 2.1 MATERIALS A
7、ND EQUIPMENT 20 2.1.1 GENERAL REQUIREMENTS (ALL ABATEMENT PROJECTS) 20 2.2 CONTAINMENT BARRIERS AND COVERINGS IN THE REGULATED AREA . 21 2.2.1 GENERAL 21 2.2.3 CONTROLLING ACCESS TO THE REGULATED AREA . 21 2.2.4 CRITICAL BARRIERS 21 2.2.5 SECONDARY BARRIERS: 22 2.2.6 EXTENSION OF THE REGULATED AREA
8、22 2.3 MONITORING, INSPECTION AND TESTING . 22 2.3.1 GENERAL 22 2.3.2 SCOPE OF SERVICES OF THE VPIH/CIH CONSULTANT . 23 2.3.3 MONITORING, INSPECTION AND TESTING BY CONTRACTOR CPIH/CIH 24 2.4 ASBESTOS HAZARD ABATEMENT PLAN . 25 2.5 SUBMITTALS . 25 2.5.1 PRE-START MEETING SUBMITTALS . 25 2.5.2 SUBMITT
9、ALS DURING ABATEMENT 27 2.5.3 SUBMITTALS AT COMPLETION OF ABATEMENT 27 PART 3 - EXECUTION . 28 3.1 REGULATED AREA PREPARATIONS 28 3.1.1 SITE SECURITY 28 3.1.2 OSHA DANGER SIGNS 28 3.1.3 SHUT DOWN - LOCK OUT ELECTRICAL 28 3.1.4 SHUT DOWN - LOCK OUT HVAC 29 3.1.5 NEGATIVE PRESSURE FILTRATION SYSTEM 29
10、 3.1.6 CONTAINMENT BARRIERS AND COVERINGS FOR THE REGULATED AREA 29 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 13.31 - iii 3.1.6.1 GENERAL 29 3.1.6.2 PREPARATION PRIOR TO SEALING OFF . 29 3.1.6.3 CONTROLLING ACCESS TO THE REGULATED A
11、REA . 29 3.1.6.4 CRITICAL BARRIERS 30 3.1.6.5 EXTENSION OF THE REGULATED AREA 30 3.1.7 PERSONAL PROTECTIVE EQUIPMENT 30 3.1.8 SANITARY FACILITIES 30 3.1.9 PRE-CLEANING . 30 3.1.9.1 PRE-CLEANING MOVABLE OBJECTS . 30 3.1.9.2 PRE-CLEANING FIXED OBJECTS . 31 3.1.9.3 PRE-CLEANING SURFACES IN THE REGULATE
12、D AREA 31 3.1.10 PRE-ABATEMENT ACTIVITIES 31 3.1.10.1 PRE-ABATEMENT MEETING . 31 3.1.10.2 PRE-ABATEMENT INSPECTIONS AND PREPARATIONS 32 3.1.10.3 PRE-ABATEMENT CONSTRUCTION AND OPERATIONS . 33 3.2 REMOVAL OF CLASS II TRANSITE MATERIALS: 33 3.2.1 GENERAL 33 3.3.1 GENERAL 34 3.4 PROJECT DECONTAMINATION
13、 34 3.4.1 GENERAL 34 3.4.2 REGULATED AREA CLEARANCE . 35 3.4.3 WORK DESCRIPTION . 35 3.4.4 PRE-DECONTAMINATION CONDITIONS . 35 3.4.5. CLEANING: . 35 3.5 VISUAL INSPECTION AND AIR CLEARANCE TESTING 35 3.5.1 GENERAL 35 3.5.2 VISUAL INSPECTION 35 3.5.3 AIR CLEARANCE TESTING 36 3.5.4 FINAL AIR CLEARANCE
14、 PROCEDURES . 36 3.6 ABATEMENT CLOSEOUT AND CERTIFICATE OF COMPLIANCE . 36 3.6.1 COMPLETION OF ABATEMENT WORK . 36 3.6.2 CERTIFICATE OF COMPLETION BY CONTRACTOR 37 3.6.3 WORK SHIFTS 37 ATTACHMENT #1 38 ATTACHMENT #2 39 ATTACHMENT #3 40 ATTACHMENT #4 41 Provided by IHSNot for ResaleNo reproduction or
15、 networking permitted without license from IHS-,-,-07-11 02 82 13.31 - 1 INSTRUCTIONS TO ARCHITECT/ENGINEER AND INDUSTRIAL HYGIENE CONSULTANT SECTION 02 82 13.31 ASBESTOS TRANSITE ABATEMENT SPECIFICATIONS 1. These specifications provide general guidance to personnel given the task of designing and e
16、xecuting a Class II asbestos transite abatement project. Each abatement is a unique situation and therefore must be tailored for that project. This specification incorporates current regulatory requirements and current best abatement practices, procedures and technology. The Architect/Engineer and/o
17、r the Industrial Hygiene consultants may provide additional specification additions or deletions to this specification that, in their professional judgment, will ensure a safe and effective approach to a specific abatement project while maintaining compliance with applicable regulations and VA polic
18、y. Any changes must be clearly marked on/attached to this document prior to finalization of the specification so that the changes will be adequately considered in the review process by the VA. 2. These specifications are to be used in conjunction with asbestos abatement contractor selection criteria
19、; special instructions package; and general construction provisions. 3. Paragraphs that are not preceded by a number code are indented as instructions to the specifications writer and identified by the notation “Spec Writer Notes“. These paragraphs must be deleted from the final document. 4. Within
20、the text of the specifications, there may be optional procedures which the specification writer could include in the final specification. Procedures which are not chosen must be deleted by the specification writer. Optional text is shown by the notation (/text/). 5. The specification writer, VPIH/CI
21、H, CPIH/CIH, and A/E must be aware of and read the VA A/E Quality Alert 07/09 since it details common errors in specification and contract documents for asbestos projects. This would be especially helpful if a survey is being conducted prior to an abatement project. A full AHERA survey of the facili
22、ty would be needed prior to renovation activities, however, if demolition of the facility is planned, a NESHAP survey of the facility would need to be performed PART 1 - GENERAL 1.1 SUMMARY OF THE WORK 1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS Drawings, general provisions of the contract, in
23、cluding general and supplementary conditions and other Division 01 specifications, shall apply to the work of this section. The contract documents show the work to be done under the contract and related requirements and conditions impacting the project. Related requirements and conditions include ap
24、plicable codes and regulations, notices and permits, existing site conditions and restrictions on use of the site, requirements for partial owner occupancy during the work, coordination with other work and the phasing of the work. In the event the Asbestos Abatement Contractor discovers a conflict i
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA028213312011ASBESTOSTRANSITEABATEMENTPDF
链接地址:http://www.mydoc123.com/p-1074671.html