VA 02 82 13 19-2011 ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.pdf
《VA 02 82 13 19-2011 ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.pdf》由会员分享,可在线阅读,更多相关《VA 02 82 13 19-2011 ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.pdf(48页珍藏版)》请在麦多课文档分享上搜索。
1、07-11 02 82 13.19 i SECTION 02 82 13.19 ASBESTOS FLOOR TILE AND MASTIC ABATEMENT TABLE OF CONTENTS PART 1 - GENERAL 1 1.1 SUMMARY OF THE WORK . 1 1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS . 1 1.1.2 EXTENT OF WORK 2 1.1.3 RELATED WORK 2 1.1.4 TASKS . 2 1.1.5 ABATEMENT CONTRACTOR USE OF PREMIS
2、ES 2 1.2 VARIATIONS IN QUANTITY 3 1.3 STOP ASBESTOS REMOVAL . 3 1.4 DEFINITIONS . 4 1.4.1 GENERAL . 4 1.4.2 GLOSSARY 4 1.4.3 REFERENCED STANDARDS ORGANIZATIONS . 10 1.5 APPLICABLE CODES AND REGULATIONS . 11 1.5.1 GENERAL APPLICABILITY OF CODES, REGULATIONS, AND STANDARDS . 11 1.5.2 CONTRACTOR RESPON
3、SIBILITY 12 1.5.3 FEDERAL REQUIREMENTS . 12 1.5.4 STATE REQUIREMENTS . 12 1.5.5 LOCAL REQUIREMENTS . 13 1.5.6 STANDARDS 13 1.5.7 EPA GUIDANCE DOCUMENTS . 13 1.5.8 NOTICES 13 1.5.9 PERMITS/LICENSES . 14 1.5.10 POSTING AND FILING OF REGULATIONS . 14 1.5.11 VA RESPONSIBILITIES . 14 1.5.12 SITE SECURITY
4、 . 14 1.5.13 EMERGENCY ACTION PLAN AND ARRANGEMENTS 15 1.5.14 PRE-construction MEETING 16 1.6 PROJECT COORDINATION . 16 1.6.1 PERSONNEL 16 1.7 RESPIRATORY PROTECTION . 17 1.7.1 GENERAL - RESPIRATORY PROTECTION PROGRAM . 17 1.7.2 RESPIRATORY PROTECTION PROGRAM COORDINATOR . 18 1.7.3 SELECTION AND USE
5、 OF RESPIRATORS . 18 Copyright International Organization for Standardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 13.19 ii 1.7.4 MINIMUM RESPIRATORY PROTECTION . 18 1.7.5 MEDICAL WRITTEN OPINION 18 1.7.
6、6 RESPIRATOR FIT TEST 18 1.7.7 RESPIRATOR FIT CHECK . 18 1.7.8 MAINTENANCE AND CARE OF RESPIRATORS 18 1.8 WORKER PROTECTION 19 1.8.1 TRAINING OF ABATEMENT PERSONNEL 19 1.8.2 MEDICAL EXAMINATIONS . 19 1.8.3 PERSONAL PROTECTIVE EQUIPMENT 19 1.8.4 REGULATED AREA ENTRY PROCEDURE . 19 1.8.5 DECONTAMINATI
7、ON PROCEDURE 20 1.8.6 REGULATED AREA REQUIREMENTS 20 PART 2 - PRODUCTS, MATERIALS AND EQUIPMENT . 23 2.1 MATERIALS AND EQUIPMENT 23 2.1.1 GENERAL REQUIREMENTS (all abatement projects) 23 2.1.2 NEGATIVE PRESSURE FILTRATION SYSTEM 24 2.1.3 DESIGN AND LAYOUT 25 2.1.4 NEGATIVE AIR MACHINES (HEPA UNITS)
8、. 25 2.1.5 PRESSURE DIFFERENTIAL 26 .2.2 CONTAINMENT BARRIERS AND COVERINGS IN THE REGULATED AREA 26 2.2.1 GENERAL 26 2.2.3 CONTROLLING ACCESS TO THE REGULATED AREA . 27 2.2.4 CRITICAL BARRIERS 27 2.2.5 secondary barriers: 27 2.2.6 EXTENSION OF THE REGULATED AREA 27 2.3 MONITORING, INSPECTION AND TE
9、STING . 28 2.3.1 GENERAL 28 2.3.2 SCOPE OF SERVICES OF THE VPIH/CIH CONSULTANT . 29 2.3.3 MONITORING, INSPECTION AND TESTING BY CONTRACTOR CPIH/CIH 29 2.4 asbestos hazard abatement plan . 30 2.5 SUBMITTALS . 31 2.5.1 PRE-start MEETING SUBMITTALS . 31 2.5.2 SUBMITTALS DURING ABATEMENT 33 2.5.3 SUBMIT
10、TALS AT COMPLETION OF ABATEMENT 33 PART 3 - EXECUTION . 33 3.1 PRE-ABATEMENT ACTIVITIES . 33 3.1.1 PRE-ABATEMENT MEETING 33 Copyright International Organization for Standardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,
11、-,-07-11 02 82 13.19 iii 3.1.2 PRE-ABATEMENT INSPECTIONS AND PREPARATIONS . 34 3.1.3 PRE-ABATEMENT CONSTRUCTION AND OPERATIONS 34 3.2 REGULATED AREA PREPARATIONS 35 3.2.1 OSHA DANGER SIGNS 35 3.2.2 CONTROLLING ACCESS TO THE REGULATED AREA . 35 3.2.3 SHUT DOWN - LOCK OUT ELECTRICAL 35 3.2.4 SHUT DOWN
12、 - LOCK OUT HVAC 35 3.2.5 SANITARY FACILITIES 35 3.2.7 PREPARATION PRIOR TO SEALING OFF . 36 3.2.8 Critical Barriers 36 3.2.10 PRE-CLEANING MOVABLE OBJECTS 36 3.2.11 PRE-CLEANING FIXED OBJECTS 36 3.2.12 PRE-CLEANING SURFACES IN THE REGULATED AREA . 37 3.2.13 EXTENSION OF THE REGULATED AREA . 37 3.3
13、REMOVAL OF CLASS II FLOORING; ROOFING; AND TRANSITE MATERIALS: . 37 3.3.1 GENERAL 37 3.3.2 REMOVAL OF flooring materials: . 37 3.3.3 REMOVAL OF MASTIC 38 3.4 DISPOSAL OF CLASS ii WASTE MATERIAL: . 38 3.4.1 GENERAL 38 3.5 PROJECT DECONTAMINATION 38 3.5.1 GENERAL 38 3.5.2 REGULATED AREA CLEARANCE . 38
14、 3.5.3 WORK DESCRIPTION . 38 3.5.4 PRE-DECONTAMINATION CONDITIONS . 39 3.5.5 CLEANING: 39 3.6 VISUAL INSPECTION AND AIR CLEARANCE TESTING 39 3.6.1 GENERAL 39 3.6.2 VISUAL INSPECTION 39 3.6.3 AIR CLEARANCE TESTING 39 3.6.4 final AIR CLEARANCE PROCEDURES . 40 3.7 ABATEMENT CLOSEOUT AND CERTIFICATE OF
15、COMPLIANCE . 40 3.7.1 COMPLETION OF ABATEMENT WORK . 40 3.7.2 CERTIFICATE OF COMPLETION BY CONTRACTOR 40 3.7.3 WORK SHIFTS 40 ATTACHMENT #1 41 ATTACHMENT #2 42 Copyright International Organization for Standardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking
16、permitted without license from IHS-,-,-07-11 02 82 13.19 iv ATTACHMENT #3 43 ATTACHMENT #4 44 Copyright International Organization for Standardization Provided by IHS under license with ISO Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 13.19 1 INSTRUC
17、TIONS TO ARCHITECT/ENGINEER AND INDUSTRIAL HYGIENE CONSULTANT SECTION 02 82 13.19 ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPECIFICATIONS 1. These specifications provide general guidance to personnel given the task of designing and executing a Class II asbestos flooring abatement project. Each abate
18、ment is a unique situation and therefore must be tailored for that project. This specification incorporates current regulatory requirements and current best abatement practices, procedures and technology. The Architect/Engineer and/or the Industrial Hygiene consultants may provide additional specifi
19、cation additions or deletions to this specification that, in their professional judgment, will ensure a safe and effective approach to a specific abatement project while maintaining compliance with applicable regulations and VA policy. Any changes must be clearly marked on/attached to this document
20、prior to finalization of the specification so that the changes will be adequately considered in the review process by the VA. 2. These specifications are to be used in conjunction with asbestos abatement contractor selection criteria; special instructions package; and general construction provisions
21、. 3. Paragraphs that are not preceded by a number code are indented as instructions to the specifications writer and identified by the notation “Spec Writer Notes“. These paragraphs must be deleted from the final document. 4. Within the text of the specifications, there may be optional procedures wh
22、ich the specification writer could include in the final specification. Procedures which are not chosen must be deleted by the specification writer. Optional text is shown by the notation (/text/). 5. The specification writer, VPIH/CIH, CPIH/CIH, and A/E must be aware of and read the VA A/E Quality A
23、lert 07/09 since it details common errors in specification and contract documents for asbestos project. This would be especially helpful if a survey is being conducted prior to an abatement project. A full AHERA survey of the facility would be needed prior to renovation activities, however, if demol
24、ition of the facility is planned, a NESHAP-compliant survey of the facility would need to be performed. PART 1 - GENERAL 1.1 SUMMARY OF THE WORK 1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS Drawings, general provisions of the contract, including general and supplementary conditions and other Di
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA028213192011ASBESTOSFLOORTILEANDMASTICABATEMENTPDF

链接地址:http://www.mydoc123.com/p-1074669.html