VA 02 82 11-2011 TRADITIONAL ASBESTOS ABATEMENT.pdf
《VA 02 82 11-2011 TRADITIONAL ASBESTOS ABATEMENT.pdf》由会员分享,可在线阅读,更多相关《VA 02 82 11-2011 TRADITIONAL ASBESTOS ABATEMENT.pdf(61页珍藏版)》请在麦多课文档分享上搜索。
1、07-11 02 82 11 - i SECTION 02 82 11 TRADITIONAL ASBESTOS ABATEMENT TABLE OF CONTENTS 1.1 SUMMARY OF THE WORK . 1 1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS . 1 1.1.2 EXTENT OF WORK 2 1.1.3 RELATED WORK 2 1.1.4 TASKS . 3 1.1.5 CONTRACTORS USE OF PREMISES . 3 1.2 VARIATIONS IN QUANTITY 4 1.3 ST
2、OP ASBESTOS REMOVAL . 4 1.4 DEFINITIONS . 5 1.4.1 GENERAL . 5 1.4.2 GLOSSARY 5 1.4.3 REFERENCED STANDARDS ORGANIZATIONS 11 1.5 APPLICABLE CODES AND REGULATIONS 12 1.5.1 GENERAL APPLICABILITY OF CODES, REGULATIONS, AND STANDARDS 12 1.5.2 Asbestos Abatement CONTRACTOR RESPONSIBILITY 13 1.5.3 FEDERAL R
3、EQUIREMENTS 13 1.5.4 STATE REQUIREMENTS 13 1.5.5 LOCAL REQUIREMENTS 14 1.5.6 STANDARDS . 14 1.5.7 EPA GUIDANCE DOCUMENTS 14 1.5.8 NOTICES . 14 1.5.9 PERMITS/LICENSES 14 1.5.10 POSTING AND FILING OF REGULATIONS 15 1.5.11 VA RESPONSIBILITIES 15 1.5.12 EMERGENCY ACTION PLAN AND ARRANGEMENTS . 15 1.5.13
4、 PRE-CONSTRUCTION MEETING . 16 1.6 PROJECT COORDINATION 17 1.6.1 PERSONNEL . 17 1.7 RESPIRATORY PROTECTION 18 1.7.1 GENERAL - RESPIRATORY PROTECTION PROGRAM 18 1.7.2 RESPIRATORY PROTECTION PROGRAM COORDINATOR 18 1.7.3 SELECTION AND USE OF RESPIRATORS 18 1.7.4 MINIMUM RESPIRATORY PROTECTION 18 Copyri
5、ght British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 11 - ii 1.7.5 MEDICAL WRITTEN OPINION . 18 1.7.6 RESPIRATOR FIT TEST . 18 1.7.7 RESPIRATOR FIT CHECK 19 1.7.8 MA
6、INTENANCE AND CARE OF RESPIRATORS . 19 1.7.9 SUPPLIED AIR SYSTEMS 19 1.8 WORKER PROTECTION . 19 1.8.1 TRAINING OF ABATEMENT PERSONNEL . 19 1.8.2 MEDICAL EXAMINATIONS 19 1.8.3 REGULATED AREA ENTRY PROCEDURE 19 1.8.4 DECONTAMINATION PROCEDURE . 20 1.8.5 REGULATED AREA REQUIREMENTS . 20 1.9 DECONTAMINA
7、TION FACILITIES 20 1.9.1 DESCRIPTION . 20 1.9.2 GENERAL REQUIREMENTS 21 1.9.3 TEMPORARY FACILITIES TO THE PDF and W/EDF . 21 1.9.4 PERSONNEL DECONTAMINATION FACILITY (PDF) 21 1.9.5 WASTE/EQUIPMENT DECONTAMINATION FACILITY (W/EDF) 23 1.9.6 WASTE/EQUIPMENT DECONTAMINATION PROCEDURES 24 PART 2 - PRODUC
8、TS, MATERIALS AND EQUIPMENT 24 2.1 MATERIALS AND EQUIPMENT . 24 2.1.1 GENERAL REQUIREMENTS 24 2.2 MONITORING, INSPECTION AND TESTING 26 2.2.1 GENERAL . 26 2.2.2 SCOPE OF SERVICES OF THE VPIH/CIH CONSULTANT 26 2.2.3 MONITORING, INSPECTION AND TESTING BY CONTRACTOR CPIH/CIH . 27 2.3 ASBESTOS hAZARD aB
9、ATEMENT pLAN 28 2.4 SUBMITTALS 29 2.4.1 PRE-START MEETING SUBMITTALS 29 2.4.2 SUBMITTALS DURING ABATEMENT . 30 2.4.3 SUBMITTALS AT COMPLETION OF ABATEMENT . 31 2.5 ENCAPSULANTS 31 2.5.1 TYPES OF ENCAPSULANTS . 31 2.5.2 PERFORMANCE REQUIREMENTS 31 2.5.3 CERTIFICATES OF COMPLIANCE 32 PART 3 - EXECUTIO
10、N 32 3.1 REGULATED AREA PREPARATIONS . 32 3.1.3.1 DESIGN AND LAYOUT . 34 Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 11 - iii 3.1.3.2 NEGATIVE AIR MAC
11、HINES (HEPA UNITS) 34 3.1.3.3 PRESSURE DIFFERENTIAL . 35 3.1.3.4 MONITORING 35 3.1.3.5 AUXILIARY GENERATOR . 36 3.1.3.6SUPPLEMENTAL MAKE-UP AIR INLETS 36 3.1.3.7 TESTING THE SYSTEM 36 3.1.3.8 DEMONSTRATION OF THE NEGATIVE PRESSURE Filtration SYSTEM . 36 3.1.3.9 USE OF THE NEGATIVE PRESSURE FILTRATIO
12、N SYSTEM DURING ABATEMENT OPERATIONS 37 3.1.3.10 DISMANTLING THE SYSTEM . 37 3.1.4 CONTAINMENT BARRIERS AND COVERINGS IN THE REGULATED AREA 37 3.1.4.1 GENERAL . 37 3.1.4.2 PREPARATION PRIOR TO SEALING THE REGULATED AREA . 37 3.1.4.3 CONTROLLING ACCESS TO THE REGULATED AREA 38 3.1.4.4 CRITICAL BARRIE
13、RS . 38 3.1.4.5 PRIMARY BARRIERS 38 3.1.4.6 SECONDARY BARRIERS 39 3.1.4.7 EXTENSION OF THE REGULATED AREA . 39 3.1.4.8 FIRESTOPPING 39 3.1.5 Sanitary facilities . 39 3.1.6 PERSONAL PROTECTIVE EQUIPMENT . 39 3.1.7 Pre-cleaning 40 3.1.8 PRE-ABATEMENT ACTIVITIES 41 3.1.8.1 PRE-ABATEMENT Meeting . 41 3.
14、1.8.2 PRE-ABATEMENT CONSTRUCTION AND OPERATIONS . 41 3.1.8.3 PRE-ABATEMENT INSPECTIONS AND PREPARATIONS 41 3.2 REMOVAL OF ACM 42 3.2.1 WETTING acm . 42 3.2.2 SECONDARY BARRIER AND WALKWAYS 43 3.2.3 WET REMOVAL OF ACM 43 3.2.4 WET REMOVAL OF AMOSITE 44 3.2.5 REMOVAL OF ACM/DIRT FLOORS AND OTHER SPECI
15、AL PROCEDURES . 45 3.3 LOCKDOWN ENCAPSULATION 46 3.3.1 GENERAL . 46 3.3.2 DELIVERY AND STORAGE 46 3.3.3 WORKER PROTECTION . 46 3.3.4 ENCAPSULATION OF SCRATCH COAT PLASTER OR PIPING . 46 3.3.5 SEALING EXPOSED EDGES . 47 Copyright British Standards Institution Provided by IHS under license with BSI -
16、Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-07-11 02 82 11 - iv 3.4 DISPOSAL OF ACM WASTE MATERIALS . 47 3.4.1 GENERAL . 47 3.4.2 PROCEDURES 47 3.5 PROJECT DECONTAMINATION . 48 3.5.1 GENERAL . 48 3.5.2 REGULATED AREA CLEARANCE 48 3.5.3 WORK DE
17、SCRIPTION 48 3.5.4 PRE-DECONTAMINATION CONDITIONS 48 3.5.5 FIRST CLEANING 48 3.5.6 PRE-CLEARANCE INSPECTION AND TESTING 49 3.5.7 LOCKDOWN ENCAPSULATION OF ABATED SURFACES . 49 3.6 FINAL VISUAL INSPECTION AND AIR CLEARANCE TESTING . 49 3.6.1 GENERAL . 49 3.6.2 FINAL VISUAL INSPECTION . 49 3.6.3 FINAL
18、 AIR CLEARANCE TESTING . 49 3.6.4 FINAL AIR CLEARANCE PROCEDURES 50 3.6.5 CLEARANCE SAMPLING USING PCM LESS THAN 260LF/160SF: . 50 3.6.8 LABORATORY TESTING OF TEM SAMPLES . 51 3.7 ABATEMENT CLOSEOUT AND CERTIFICATE OF COMPLIANCE 51 3.7.1 COMPLETION OF ABATEMENT WORK 51 3.7.2 CERTIFICATE OF COMPLETIO
19、N BY CONTRACTOR . 52 3.7.3 WORK SHIFTS . 52 3.7.4 RE-INSULATION . 52 ATTACHMENT #1 . 52 ATTACHMENT #2 . 54 ATTACHMENT #4 . 57 Copyright British Standards Institution Provided by IHS under license with BSI - Uncontrolled Copy Not for ResaleNo reproduction or networking permitted without license from
20、IHS-,-,-07-11 02 82 11 - 1 INSTRUCTIONS TO ARCHITECT/ENGINEER AND INDUSTRIAL HYGIENE CONSULTANT SECTION 02 82 11 CLASS I NEGATIVE PRESSURE ENCLOSURE ASBESTOS ABATEMENT SPECIFICATIONS 1. These specifications provide general guidance to personnel given the task of designing and executing a Class I neg
21、ative pressure enclosure asbestos abatement project. Each abatement is a unique situation and therefore must be tailored for that project. This specification incorporates current regulatory requirements and current best abatement practices, procedures and technology. The Architect/Engineer and/or th
22、e Industrial Hygiene consultants may provide additional specification additions or deletions to this specification that, in their professional judgment, will ensure a safe and effective approach to a specific abatement project while maintaining compliance with applicable regulations and VA policy. A
23、ny changes must be clearly marked on/attached to this document prior to finalization of the specification so that the changes will be adequately considered in the review process by the VA. 2. These specifications are to be used in conjunction with asbestos abatement contractor selection criteria; sp
24、ecial instructions package; and general construction provisions. 3. Paragraphs that are not preceded by a number code are indented as instructions to the specifications writer and identified by the notation “Spec Writer Notes“. These paragraphs must be deleted from the final document. 4. Within the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA0282112011TRADITIONALASBESTOSABATEMENTPDF

链接地址:http://www.mydoc123.com/p-1074667.html