UL SUBJECT 260A-2005 OUTLINE OF INVESTIGATION FOR AIR PRESSURE MAINTENANCE DEVICES (Issue 1)《气压保持装置调查大纲 发布编号 1》.pdf
《UL SUBJECT 260A-2005 OUTLINE OF INVESTIGATION FOR AIR PRESSURE MAINTENANCE DEVICES (Issue 1)《气压保持装置调查大纲 发布编号 1》.pdf》由会员分享,可在线阅读,更多相关《UL SUBJECT 260A-2005 OUTLINE OF INVESTIGATION FOR AIR PRESSURE MAINTENANCE DEVICES (Issue 1)《气压保持装置调查大纲 发布编号 1》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULMarch 4, 20051SUBJECT 260AOUTLINE OF INVESTIGATIONFORAIR PRESSURE MAINTENANCE DEVICESIssue Number 1March 4, 2005Summary of TopicsThis is the first issue of the Subject 260A Outline of Investigati
2、on for AirPressure Maintenance Devices.The UL Foreword is no longer located within the UL Standard. For informationconcerning the use and application of the requirements contained in thisStandard, the current version of the UL Foreword is located onULStandardsInfoNet at: http:/ 2005 UNDERWRITERS LAB
3、ORATORIES INC.UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULMARCH 4, 2005SUBJECT 260A2No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULCONTENTSINTRODUCTION1 Scope .4
4、2 Components 43 Units of Measurement .44 Undated References 4CONSTRUCTION5 General 5PERFORMANCE6 Leakage and Hydrostatic Strength Tests .57 Reverse Air Flow Test .6MANUFACTURING AND PRODUCTION TESTS8 General 6MARKING9 General 6INSTALLATION INSTRUCTIONS10 General .7MARCH 4, 2005 SUBJECT 260A 3UL COPY
5、RIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULINTRODUCTION1 Scope1.1 This Outline of Investigation covers devices intended to automatically maintain, within specific limits,the gas pressure in a dry pipe sprinkler system.1.2 The products covered by
6、 this Outline of Investigation are intended for use in sprinkler systemsinstalled in accordance with the Standard for Installation of Sprinkler Systems, NFPA 13.2 Components2.1 Except as indicated in 2.2, a component of a product covered by this outline shall comply with therequirements for that com
7、ponent.2.2 A component is not required to comply with a specific requirement that:a) Involves a feature or characteristic not required in the application of the component in theproduct covered by this outline, orb) Is superseded by a requirement in this outline.2.3 A component shall be used in accor
8、dance with its rating established for the intended conditions ofuse.2.4 Specific components are incomplete in construction features or restricted in performance capabilities.Such components are intended for use only under limited conditions, such as certain temperatures notexceeding specified limits
9、, and shall be used only under those specific conditions.3 Units of Measurement3.1 Values stated without parentheses are the requirement. Values in parentheses are explanatory orapproximate information.4 Undated References4.1 Any undated reference to a code or standard appearing in the requirements
10、of this standard shall beinterpreted as referring to the latest edition of that code or standard.MARCH 4, 2005SUBJECT 260A4UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULCONSTRUCTION5 General5.1 An air maintenance device shall have an inlet p
11、ressure rating of not less than 175 psig.5.2 An air maintenance device shall provide a means to sense and maintain outlet air pressure withinpredetermined limits and to a value not greater than 75 psig as specified in the manufacturers installationinstructions.5.3 A 1/8 inch diameter orifice or less
12、 shall be provided to restrict the flow of air through the air pressuremaintenance device, unless the air maintenance device utilizes as small compressor with a flow capacitythat does not exceed 6 scfm. A pressure maintenance device shall be permitted to be provided with abypass line to provide for
13、rapid pressurization of a dry pipe system.5.4 A means, such as a spring loaded check valve, shall be provided to prevent the flow of air from thesprinkler system to the supply source in the event of air supply failure.5.5 A strainer constructed of corrosion resistance materials with openings not exc
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ULSUBJECT260A2005OUTLINEOFINVESTIGATIONFORAIRPRESSUREMAINTENANCEDEVICESISSUE1 气压 保持 装置 调查 大纲 发布 编号 PDF

链接地址:http://www.mydoc123.com/p-1069323.html