UL SUBJECT 212-2008 OUTLINE OF INVESTIGATION FOR HAND-OPERATED CHEMICAL PUMPS (Issue 1)《手动化学泵的调查大纲 发布编号 1》.pdf
《UL SUBJECT 212-2008 OUTLINE OF INVESTIGATION FOR HAND-OPERATED CHEMICAL PUMPS (Issue 1)《手动化学泵的调查大纲 发布编号 1》.pdf》由会员分享,可在线阅读,更多相关《UL SUBJECT 212-2008 OUTLINE OF INVESTIGATION FOR HAND-OPERATED CHEMICAL PUMPS (Issue 1)《手动化学泵的调查大纲 发布编号 1》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULMay 7, 20081SUBJECT 212OUTLINE OF INVESTIGATIONFORHAND-OPERATED CHEMICAL PUMPSIssue Number: 1MAY 7, 2008Summary of TopicsThis first issue of Outline of Investigation for Hand-Operated ChemicalPum
2、ps covers hand-operated pumps intended to handle chemicals andsimilar liquids.The UL Foreword is no longer located within the UL Standard. For informationconcerning the use and application of the requirements contained in thisStandard, the current version of the UL Foreword is located onULStandardsI
3、nfoNet at: http:/ 2008 UNDERWRITERS LABORATORIES INC.UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULMAY 7, 2008SUBJECT 2122No Text on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION F
4、ROM ULCONTENTSINTRODUCTION1 Scope .42 General 42.1 Components 42.2 Units of measurement .52.3 Undated references .53 Glossary .5CONSTRUCTION4 Assembly 55 Materials .66 Bodies, Covers, and Heads 67 Diaphragms 68 Springs 79 Outlet Connections 710 Hoses 7PROTECTION AGAINST INJURY TO PERSONS11 General .
5、712 Sharp Edges 8PERFORMANCE13 General .814 Deformation Test 815 Blocked Outlet Pressure Test .816 External Leakage Test 917 Hose Securement Conditioning Test .918 Endurance Test 919 Liquid Immersion Test .1020 Long Term Exposure Test .10MANUFACTURING AND PRODUCTION LINE TESTS21 General 11MARKING22
6、General 1123 Cautionary Markings 1124 Permanency of Marking .12INSTRUCTION MANUALS25 General 12MAY 7, 2008 SUBJECT 212 3UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULINTRODUCTION1 Scope1.1 These requirements cover hand-operated pumps intende
7、d to handle chemicals and similar liquids.1.2 These pumps are intended to be attached to a barrel, a drum, a carboy, or a similar container, usingconnection means provided with the pump.1.3 Hand-operated pumps investigated to the requirements of this Outline shall be evaluated using theapplicable fl
8、uids the pump is intended to be used with as specified by the manufacturer.1.4 This Outline does not cover hand-operated pumps for use with:a) Flammable and combustible liquids orb) Water.2 General2.1 Components2.1.1 Except as indicated in 2.1.2, a component of a product covered by this Outline shal
9、l comply withthe requirements for that component.2.1.2 A component is not required to comply with a specific requirement that:a) Involves a feature or characteristic not required in the application of the component in theproduct covered by this standard, orb) Is superseded by a requirement in this s
10、tandard.2.1.3 A component shall be used in accordance with its rating established for the intended conditions ofuse.2.1.4 Specific components are incomplete in construction features or restricted in performancecapabilities. Such components are intended for use only under limited conditions, such as
11、certaintemperatures not exceeding specified limits, and shall be used only under those specific conditions.MAY 7, 2008SUBJECT 2124UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL2.2 Units of measurement2.2.1 Values stated without parentheses a
12、re the requirement. Values in parentheses are explanatory orapproximate information.2.3 Undated references2.3.1 Any undated reference to a code or standard appearing in the requirements of this standard shallbe interpreted as referring to the latest edition of that code or standard.3 Glossary3.1 For
13、 the purposes of this Outline, the following definitions apply.3.2 DIAPHRAGM A dividing membrane or thin partition that is used to provide the pumping action.3.3 DISCHARGE OUTLET An outlet through which the fuel can be dispensed into a secondarycontainer.3.4 MANUAL PUMP A non-powered device used to
14、transfer liquids from a primary container to asecondary container.CONSTRUCTION4 Assembly4.1 The construction of a pump shall be such that parts can be assembled in the intended manner afterbeing dismantled to the extent needed for replacement of parts or for other maintenance or servicing.4.2 When a
15、 pump requires the use of special flanges, gaskets, bolts, or other special fittings or parts formaking connections, such parts shall be furnished as part of the pump assembly.4.3 A product shall be formed and assembled so that it will have the strength and rigidity necessary toresist the abuses to
16、which it is likely to be subjected, without resulting in a risk of injury to persons due tototal or partial collapse, loosening or displacement of parts, or other serious defects.MAY 7, 2008 SUBJECT 212 5UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSIO
17、N FROM UL5 Materials5.1 Fluid confining parts of the pump shall be constructed of nonmetallic materials.5.2 A part to be used for fluid confining parts shall be of a material inherently resistant to the action ofthe liquid to be handled. Other parts in contact with the fluid to be handled shall be r
18、esistant to the actionof the fluid when malfunction of the part results in:a) Leakage;b) Malfunction of equipment; orc) A risk of injury to persons.5.3 An elastomeric part used in contact with the fluid to be handled shall be tested in accordance withthe Liquid Immersion Test, Section 19. A seal sub
19、jected to additional forces, such as pull forces duringuse, shall comply with the requirements in the Endurance Test, Section 18.6 Bodies, Covers, and Heads6.1 Nonmetallic threaded connections shall not crack or leak when tested in accordance with thedeformation test requirements in Section 14.6.2 A
20、 bolt or a screw hole shall not extend through the outer walls of a pump body into a liquid handlingsection.7 Diaphragms7.1 A metal or nonmetal part coming into contact with a diaphragm shall have no sharp edges, burrs,projections, or surfaces that are capable of chafing or abrading the diaphragm.7.
21、2 A pump, in which a diaphragm constitutes the only fluid seal, shall be constructed such that theatmospheric side of the diaphragm is enclosed in a casing construction to reduce external leakage in theevent of diaphragm rupture, or shall have provisions for the connection of pipe or tube that will
22、vent to theoutdoors or an equivalent area.MAY 7, 2008SUBJECT 2126UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL8 Springs8.1 A spring shall be guided and arranged to reduce binding, buckling, or other interference with its freemovement. When
23、required, ends of a spring shall be closed and squared.9 Outlet Connections9.1 Threaded connections shall be made with a suitable pipe joint sealant or other suitable means toprevent leaking.9.2 Specialized connection fittings shall be supplied by the manufacturer.10 Hoses10.1 Hoses intended to be u
24、sed with the pump shall be supplied by the manufacturer.10.2 Hoses can be connected to the pump outlet by solvent weld bonding, spring clamp, stainless steelclamp, or other acceptable means. The securement means shall be provided by the manufacturer.10.3 All hoses and all securement means shall be t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ULSUBJECT2122008OUTLINEOFINVESTIGATIONFORHANDOPERATEDCHEMICALPUMPSISSUE1 手动 化学 调查 大纲 发布 编号 PDF

链接地址:http://www.mydoc123.com/p-1069231.html