UL 1741 CRD-2012 UL Standard for Safety Inverters Converters Controllers and Interconnection System Equipment for Use With Distributed Energy Resources - Section Paragraph Referen.pdf
《UL 1741 CRD-2012 UL Standard for Safety Inverters Converters Controllers and Interconnection System Equipment for Use With Distributed Energy Resources - Section Paragraph Referen.pdf》由会员分享,可在线阅读,更多相关《UL 1741 CRD-2012 UL Standard for Safety Inverters Converters Controllers and Interconnection System Equipment for Use With Distributed Energy Resources - Section Paragraph Referen.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULUNDERWRITERS LABORATORIES INC. CERTIFICATION REQUIREMENT DECISIONThis Certification Requirement Decision is prepared and published by Underwriters Laboratories Inc.(UL). It is normative for the a
2、pplicable UL Product Certification Program(s); however, it is currently notpart of the UL Standard(s) referenced below.Product Category (CCN): QIKHStandard Number: UL 1741Edition Date: January 28, 2010Edition Number: 2Section / Paragraph Reference: New Sections 109 to 112Subject: Isolated Inverters
3、Intended for Use with Ungrounded PV ArraysDECISION:The requirements below, (include new definitions and Sections 109 112) are to be used for theevaluation of isolated Electric Power System (EPS)-interactive PV inverters for connection to ungroundedphotovoltaic systems installed in accordance with Se
4、c. 690.35 of the NEC.DefinitionsISOLATION MONITOR INTERRUPTER (IMI) A device that monitors the insulation resistance of a PVarray circuit to ground and prevents energization of the inverter AC output circuit or disconnects anenergized output circuit when the PV array input circuit insulation resista
5、nce drops below a predeterminedvalue. Some IMIs may have monitoring circuitry that verify functionality and take appropriate actions in theevent of circuit failures. The IMI circuit may include or provide signals to control the critical isolationcomponents.GROUND FAULT A loss or electrical isolation
6、 or unintentional current path from ground to a componentor circuit.ISOLATED INVERTER An inverter that provides galvanic isolation between its input and output circuits.FUNCTIONAL GROUND An intentional impedance path from ground to a component or circuit in a PVarray and/or inverter circuit. Functio
7、nal grounding may be used during PV array isolation measurements.The intentional impedance path to ground may be a permanent or temporary connection. A permanent PVarray connection to ground without limiting impedance is not considered a functional ground.109 General109.1 These requirements cover PV
8、 inverters with transformer isolation, intended to be installed onground referenced AC output circuits and are intended for connection to ungrounded PV systems that donot have one of the PV source circuit conductors bonded / referenced to a grounding electrode conductorduring normal operation of pow
9、er export. Prior to power export during PV array isolation measurement thePV array is permitted to be temporarily referenced to ground.109.2 The requirements in sections 109 112 are in addition to the other requirements in UL 1741.Construction110 GeneralUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FUR
10、THER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL110.1 Specific construction and operational requirements for isolated inverters intended for connection toungrounded PV systems are covered in sections 110 - 112.110.2 When an insulation resistance measurement circuit relies upon software or
11、 firmware to comply withthe requirements in sections 110-112 the software or firmware shall be evaluated for reliability inaccordance with the Standard for Software in Programmable Components, UL 1998.110.3 The insulation resistance measurement circuit shall have a built-in automatic self- test circ
12、uit toverify correct operation of the insulation resistance measurement. An automatic self-test feature shallverify the insulation resistance measurement circuit is functioning within its intended operating limits. If theinsulation resistance measurement circuit self-test circuit determines it is ou
13、tside its intended operatinglimits, the unit shall prevent the inverter from exporting AC power and indicate the fault.110.4 The self- test shall be performed prior to connection and export of energy to the EPS and at leastonce in each 24-hour period.110.5 Loss of power to the insulation resistance
14、measurement circuit shall result in cessation of AC powerexportation from the inverter.110.6 Components in an insulation resistance measurement circuit shall be analyzed to determine thepotential for a malfunction that could result in misoperation, the disabling of, or have a negative impact onthe i
15、ntended operation of the IMI monitoring system including control circuits, measuring circuits, or thepower supply to such circuits (e.g. capacitors, diodes, solid-state devices, current transformers, voltagemeasurement resistors, and similar components). Faults are to be short or open circuit of any
16、 twoterminals, one pair at a time. Critical components shall be identified by a failure mode and effects analysisin accordance with the Standard for Tests for Safety-Related Controls Employing Solid-State Devices, UL991.110.7 If the component analysis required in 110.6 shows that the malfunction of
17、one or more componentsmay render the insulation resistance measurement circuit inoperative, the components shall comply withsection 110.8.110.8 With reference to 110.7, the circuits and the identified components are to be subjected to thefollowing tests (to be run on IMI circuitry as a preconditioni
18、ng to the functionality tests), in accordance withthe methods described in Section 99, Tests for Safety-Related Controls:a) Surge withstand performance test as outlined in section 99.1;b) Protection from electromagnetic interference as outlined in section 99.1;c) Ramp Voltage Test (Verified operatio
19、n at extremes of PV and Utility ranges of operatingvoltages) as outlined in section 99.2;d) Electrostatic Discharge Test as outlined in section 99.3;e) Thermal Cycling Tests, Test performed at 20C to +85C or manufacturer specified storagetemperature range, whichever is most severe) as outlined in se
20、ction 99.4;f) Humidity cycling Test as outlined in section 99.5.Exception: Alternatively, circuits and components may comply with the equivalent requirements from theStandard for Test for Safety-Related Controls Employing Solid-State Devices, UL 991.STANDARD NUMBER: UL 1741 -2-UL COPYRIGHTED MATERIA
21、L NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM UL111 Insulation Resistance Detection of Ungrounded Arrays for Isolated Inverters111.1 Isolated inverters intended to be connected to ungrounded PV arrays shall have an insulationresistance detection means to measure th
22、e DC insulation resistance between the PV array input(s) andinverter ground connection. The unit shall:a) Measure the insulation resistance between the inverters PV array input circuit(s) to theinverter ground terminal prior to beginning the exportation of AC output current but no less thanonce per
23、24-hour period, andb) Be able to detect PV array circuit insulation resistance (R) values as calculated in 111.2.111.2 In reference to 111.1, when the measured DC insulation resistance values are less than as requiredin Table 111.1, the inverter shall take the following actions:a) Provide an indicat
24、ion of the isolation fault as required in 111.3 andb) Prevent the inverter from exportation of AC power.Table 111.1Minimum Allowable InsulationMinimum Allowed Insulation Resistance Inverter SizeR= 500ohms + (Voc/ 300mA) 30 kVAR= 500ohms + Voc/ (10mA*(Inverter kVA) 30 kVAWhere:R = Resistance in ohms
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UL1741CRD2012ULSTANDARDFORSAFETYINVERTERSCONVERTERSCONTROLLERSANDINTERCONNECTIONSYSTEMEQUIPMENTFORUSEWITHDISTRIBUTEDENERGYRESOURCESSECTIONPARAGRAPHREFERENPDF