UIC OR 556-2010 Information Transmission in the Train (Train-Bus).pdf
《UIC OR 556-2010 Information Transmission in the Train (Train-Bus).pdf》由会员分享,可在线阅读,更多相关《UIC OR 556-2010 Information Transmission in the Train (Train-Bus).pdf(244页珍藏版)》请在麦多课文档分享上搜索。
1、UIC CODE 556OR5th edition, May 2010TranslationInformation transmission in the train (train bus) Transmission dinformations dans le train (bus de train)Informationsbertragung im Zug (Zugbus) Leaflet to be classified in Volumes: V - Rolling stockVI - TractionApplication:With effect from 1. May 2010All
2、 members of the International Union of RailwaysRecord of updates1st edition, June 1998 First issue, was not published in the UIC Code.2nd edition, May 1999 Redactional corrections without modification of the contents,addition of new telegrams in Appendices 1 and 2.1 to 2.3, first issueof Appendices
3、5.3, 7, 8 and 9 and approval of new train bus nodes;has not been published in the UIC Code.3rd edition, October 2004 Adaptation to the editors guide M1 coordination and insertion of thenew content of the applications traction and doors; insertion of newappendix G (prev. 7) “Homologation procedure of
4、 train bus nodes“,editorial changes; has not been published in the UIC Code.4th edition, August 2005 Publication in electronic format with Appendices A, B, E, I and Jpublished on the Internet site5th edition, May 2010 Error corrections and additions in the text part (structure of the E-telegram) as
5、well as in the appendices A, B, C.1, C.2, E.1, I, J,revised appendix G, new appendix L (safe data transmission)The person responsible for this leaflet is named in the UIC Code556ORContentsSummary 11 - General. 22 - Scope . 32.1 - Basis. 32.2 - Special cases 33 - Laying down the Standard . 43.1 - Cla
6、ssification of UIC Leaflet 556. 43.2 - Train Communication Network - TCN. 53.3 - UIC Leaflet 556. 53.4 - Applications 54 - Specifications for the hardware. 64.1 - Bus structure. 64.2 - Cable for the transmission of information . 74.3 - Train bus nodes 85 - Specification of the software . 105.1 - Ope
7、rating conditions. 105.2 - Inauguration 145.3 - Train structure. 165.4 - Transmission cases 175.5 - Vehicle addressing . 175.6 - Functional addressing. 195.7 - Telegram structures 206 - Reliability . 276.1 - Failure rate 276.2 - Error tolerance 276.3 - Transmission reliability in undisturbed operati
8、on 27556-0OR7 - Modification procedure 297.1 - Modification competence 297.2 - Modification procedure . 307.3 - UIC-Steering Group “Train bus“ . 318 - Test procedure for train bus nodes (gateways) . 328.1 - Homologation 328.2 - Homologation procedure 328.3 - Approval of the test laboratory 329 - Oth
9、er matters. 33Appendix A - List of information to be transmitted (Version 002.03, valid from 01.03.2009). 35Appendix B - Composition of the R telegrams . 36B.1 - Composition of the R1 telegram (Version 002.03, valid from 01.03.2009). 36B.2 - Composition of the R2 telegram (Version 002.03, valid from
10、 01.03.2009). 36B.3 - Composition of the R3 telegram (Version 002.03, valid from 01.03.2009). 36Appendix C - Inauguration and Mapping Server. 37C.1 - Concept of the train inauguration (Version 002.03, valid from 01.03.2009) . 37C.2 - UIC Mapping Server - Specification (Version 002.02, valid from 01.
11、08.2005) . 55C.3 - Construction of the inauguration frame (Version 002.03, valid from 01.03.2009) 84Appendix D - Process Data Marshalling (PDM) - Specification (Version 002.02, valid from 01.08.2005) 91D.1 - Introduction. 91D.2 - Marshalling types 91D.3 - Marshalling Modes 92D.4 - Data paths in PDM
12、92D.5 - PDM Operation. 94D.6 - PDM Function. 96Appendix E - Vehicle properties and collective addresses. 99E.1 - List of static vehicle properties (Version 001.03, valid from 01.03.2009) . 99E.2 - List of dynamic vehicle properties (Version 001.02, valid from 01.08.2005) 99556-0ORE.3 - List of colle
13、ctive addresses (Version 001.02, valid from 01.08.2005). 99Appendix F - TCN Data Types (Version 001.02, valid from 01.08.2005) . 100F.1 - Presentation and encoding of transmitted data 100F.2 - Data ordering 100F.3 - Notation for the primitive types . 101F.4 - Structured types 107F.5 - Natural alignm
14、ent 110F.6 - Notation for the TIMEDATE48 type 110Appendix G - Homologation Procedure for Train Bus Nodes (Version 001.02, valid from 01.03.2009) 112G.1 -Foreword. 112G.2 -General prescriptions 112G.3 -Procedure . 112G.4 -Test Laboratory Certification. 114G.5 -Contact details 121Appendix H - Conforma
15、nce testing (Version 001.02, valid from 01.08.2005). 123H.1 - Definitions. 123H.2 - General. 124H.3 - Train configurations 126H.4 - Guidelines to conformance testing execution. 130H.5 - Test bed 131H.6 - Test suites 132Appendix I - Type approved train bus nodes in vehicles that run in internationals
16、ervices (Version 001.03, valid from 01.03.2009). 221Appendix J - Modification list (Version 002.03, valid from 01.03.2009) 222Appendix K - (Reserved) . 223Appendix L - Safe Data Transmission (Version 001.00, valid from 01.03.2009) 224L.1 - Foreword. 224L.2 - Fulfilment of Safety Requirements. 224L.3
17、 - Concept of Safe UIC Train Bus Communication 225L.4 - Vital UIC R-Telegram 226L.5 - Vital UIC R-Telegram Validation. 228556-0ORL.6 - Safe UIC Inauguration 229L.7 - NADI Protection 230L.8 - UIC E-Telegram Protection 231L.9 - CRC32 Safety Code . 231List of abbreviations 232Glossary .234Bibliography
18、.236556-0OR556OR1SummaryThis leaflet defines the requirements for data transmission equipment on RIC coaches. The requirements may also be applied to other coaches, driving trailers, traction vehicles and multipleunits.The purpose of this leaflet is to:- fully document the requirements of all users,
19、 align them and set them out in standard form,- provide guidelines for the technical solution adopted for the train bus and the physicalcharacteristics of the transmission cable,- Lay down and specify the details of the requirements of the various UIC Committes as listed inAppendix A - page 35.Concr
20、ete train bus applications for certain functionalities are not dealt with in UIC Leaflet 556. Theyare contained in other leaflets administered by the UIC bodies responsible for the respective vehiclecomponents.1 - GeneralThe object of the train bus is to transmit information of all types from any ve
21、hicle of a train or multipleunits in passenger service into one or more other vehicles of the same train.With the help of the train bus- the operating process should be made more flexible by increased and differentiated remotecontrol possibilities,- the work of the Operating Department staff should
22、be made easier,- the safety of passenger traffic should be increased,- additional functionalities should be opened up in passenger traffic as, for example, automatic brake testing, comprehensive information and service for the passengers, general use of diagnostic techniques in the vehicles, saving
23、of energy.556OR2O 2 - Scope2.1 - BasisThe present requirements apply to a homogenous train formation, in which in the undamagedcondition all vehicles are either completely bus compatible or only suitable for train inauguration andparticipate in bus traffic.2.2 - Special casesThe equipment should be
24、partly usable if cable vehicles are fitted between bus capable vehicles,which do not actively take part in the bus traffic, but allow the unhindered transmission of informationwithin the train composition.If passenger trains are made up of individual coaches or vehicles with damaged bus connections,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UICOR5562010INFORMATIONTRANSMISSIONINTHETRAINTRAINBUSPDF

链接地址:http://www.mydoc123.com/p-1067151.html