UFC 3-230-13A-2004 WATER SUPPLY PUMPING STATIONS [Superseded ARMY ARMY TM 5-813-9]《供水 抽水站[代替 ARMY ARMY TM 5-813-9]》.pdf
《UFC 3-230-13A-2004 WATER SUPPLY PUMPING STATIONS [Superseded ARMY ARMY TM 5-813-9]《供水 抽水站[代替 ARMY ARMY TM 5-813-9]》.pdf》由会员分享,可在线阅读,更多相关《UFC 3-230-13A-2004 WATER SUPPLY PUMPING STATIONS [Superseded ARMY ARMY TM 5-813-9]《供水 抽水站[代替 ARMY ARMY TM 5-813-9]》.pdf(39页珍藏版)》请在麦多课文档分享上搜索。
1、UFC 3-230-13A 16 January 2004 UNIFIED FACILITIES CRITERIA (UFC) WATER SUPPLY: PUMPING STATIONS APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-230-13A 16 January 2004 1UNIFIED FACILITIES CRITE
2、RIA (UFC) WATER SUPPLY: PUMPING STATIONS Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS (Preparing Activity)NAVAL FACILITIES ENGINEERIN
3、G COMMAND AIR FORCE CIVIL ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by 1 . /1/) Change No. Date Location This UFC supersedes TM 5-813-9, dated October 1992. The format of this UFC does not conform to UFC 1-300-01; however, the format will be adjusted to conform at the next rev
4、ision. The body of this UFC is the previous TM 5-813-9, dated October 1992. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 3-230-13A 16 January 2004 2FOREWORD 1 The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provi
5、des planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD(AT DISTRIBUTION IS UNLIMITEDHEADQUARTERS, DEPARTMENT OF THE ARM YOCTOBER 1992Provided by IHSNot
6、 for ResaleNo reproduction or networking permitted without license from IHS-,-,-iATM 5-813-9T ECHNICAL M ANUAL HEADQUARTERSNo. 5-813-9 DEPARTMENT OF THE ARMYW ASHINGTON , DC, 6 October 1992WATER SUPPLY: PUMPING STATIONSParagraph PageC HAPTER 1 . GENERALPurpos e 1-1 1-1Scop e 1-2 1-1Reference s 1-3 1
7、-1Planning Factor s. 1-4 1-1C HAPTER 2 . DESIGN CONSIDERATIONGeneral Desig n 2-1 2-1Deman d 2-2 2-1C HAPTER 3 . PUMPING EQUIPMENTPump s. 3-1 3-1Pump Drive s 3-2 3-1Valvin g. 3-3 3-5Flow Meter s. 3-4 3-5Piping Layout s. 3-5 3-6Control s 3-6 3-7Reliability Factor s 3-7 3-7C HAPTER 4 . HYDRAULICSHeadlo
8、ss and System Curve s 4-1 4-1Pump Cavitatio n. 4-2 4-3Surge Analysi s. 4-3 4-3C HAPTER 5 . PUMPING STATION LAYOUTSGenera l. 5-1 5-1Structural System s 5-2 5-1Mechanical Equipmen t 5-3 5-1Electrica l. 5-4 5-2Building Environmental System s 5-5 5-2C HAPTER 6 . OPERATING EFFICIENCIESGenera l. 6-1 6-1Pu
9、mp Operation s. 6-2 6-1Pump Schedulin g. 6-3 6-1Ease of Operation and Maintainabilit y 6-4 6-1A PPENDIX A . REFERENCE S. A-1B . AVAILABLE MICRO COMPUTER PROGRAM S B-1C . CASE STUDY FOR ADDING PUMPS TO AN EXISTING SYSTE M C-1D . CASE STUDY FOR HYDRAULIC TRANSIENT S D-1B IBLIOGRAPHY BIBLIOGRAPHY 1List
10、 of FiguresF IGURE 3-1 . Booster Pump Stations. 3-23-2 . Alternative Pump Applications. 3-33-3 . Pump Curves. 3-44-1 . System Head Curve. 4-14-2 . Two Constant Speed Pumps Operated in Parallel. 4-24-3 . Four Constant Speed Pumps of Equal Capacity. 4-34-4 . Checklist Surge and Water Hammer Analysis.
11、4-44-5 . Example Water Hammer Potential Calculation. 4-65-1 . Pump Station Typical Layout. 5-35-2 . Pump Station Sections. 5-4C-I . System Network for Hydraulic Analysis. C-2C-2 . Existing Distribution System-Maximum Daily Consumption. C-3C-3 . Improved Distribution System-Maximum Daily Consumption.
12、 C-4D-1 . Uncontrolled Surge. D-1D-2 . With Air Vessel. D-2D-3 . With Pressure Relief Valve. D-3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-TM 5-813-91-1CHAPTER 1GENERAL1-1. Purpose . This manual provides guidanc e where pressu re zones are requi
13、red. Booster pumpsand criteria for the design of high lift and wate r may be needed to handle peak flows in abooster pumping stations in potable water distri - distribution s ystem which can otherwise handle thebution systems. normal flow requirement s. Where a pump station is1-2. Scop e . Criteria
14、is provided for pumpin g and de sign, which is based upon a total syste munits operating as components in distribution sys - hy draulic analysis should be consulted before th etems. Guidance is provided for sizing and selection addi tion is designed. New or updated studies wil lof pumps and pump dri
15、ves, piping, control valving, dete rmine station location and present and futur eflow metering, pump station structures, and opera- demand requirements. Locating permanent pumpstional features. so tha t there will be a positive head on pum p1-3. Re ferences . Appendix A contains a list o f Site sele
16、ction will be dete rmined from evaluation ofreferences used in this document. a top ographic survey and flood plain analysis t o1-4. Pla nning Factors . Main pumping stations the proposed plant site. The site must not b ewhich supply water to the distribution system wil l sub ject to flooding. Major
17、 planning factors are :be loc ated near the water treatment facility or a availability of electric power, roadway access fo rpotable water storage facility and wi ll pump directly mainten ance and operation purposes, security, andinto the piping system. These pump stations may be adv erse impact, if
18、 any, upon surroundin ga part of these other structure s. Pumps which pump occupa ncies. Site development will depend upon adir ectly into transmission lines, and distributio n site soils analysis showing adequate support fo rsys tems are sometimes called high lift pumps . foun dations or possible g
19、round water problems ,Boost er pumps may be located anywhere in th e an d a grading and drainage plan of the are asyste m to increase the pressure in the pipeline . showing that runoff away from the structures ca nBoost er pump stations are usually located remot e be obtained.from the main pump s ta
20、tion, as in hilly topography,added to an existing installation, previous planningsuction s will eliminate many operational problems.determine if there are any flooding probabilities ofProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-TM 5-813-92-1CHAPT
21、ER 2DESIGN CONSIDERATION2-1. General Design. The sizing of eac h (3) Peak Hour Consumption on Annual Maxi-com ponent in the distribution system will depen d mum Day (MDC/Peak-Hour)upon the effective com bination of the major system (4) MDC plus Simulated Fireflowel ements: supply source, storage, pu
22、mping, an d Sev eral analyses should be made to investigat edis tribution piping. The hydraulic analysis of th e alternative piping arrangements within the distri -to tal distribution system is discussed in T M buti on system as well as for connecting propose d5-813- 5. Water storage is discussed in
23、 T M pump ing stations to the distribution system. I f5-813-4. future improvements are c ontemplated, the analysis2-2. Demand. th us assuring the correct selection of the fina la. General. Population and water consumption alternative to be implemented initially.es timates are the basis for determini
24、ng the flo w c. System Pressures. The pressure di stribution ind e mand of a water supply and distribution system. the system will assume the following criteria:Flo w and pressure demands at any point of th e (1) Maximum curb pressures (70 psi)system are dete rmined by hydraulic network analy- (2) M
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UFC323013A2004WATERSUPPLYPUMPINGSTATIONSSUPERSEDEDARMYARMYTM58139 供水 抽水站 代替 ARMYARMYTM58139PDF

链接地址:http://www.mydoc123.com/p-1066923.html