UFC 1-300-09N CHANGE 8-2011 DESIGN PROCEDURES.pdf
《UFC 1-300-09N CHANGE 8-2011 DESIGN PROCEDURES.pdf》由会员分享,可在线阅读,更多相关《UFC 1-300-09N CHANGE 8-2011 DESIGN PROCEDURES.pdf(90页珍藏版)》请在麦多课文档分享上搜索。
1、UFC 1-300-09N 25 May 2005 Including Change 8, 17 February 2011 UNIFIED FACILITIES CRITERIA (UFC) DESIGN PROCEDURES APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 1-300-09N 25 May 2005 Including
2、 Change 8, 17 February 2011 UNIFIED FACILITIES CRITERIA (UFC) DESIGN PROCEDURES Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS NAVAL FA
3、CILITIES ENGINEERING COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by 1 . /1/) Change No. Date Location 1 22 Feb 2006 Paragraph 2-2 (metric policy reference changed) 2 4 Dec 2006 Throughout - added requirements from Draft UFC 1-300-10N.
4、 3 20 June 2007 Throughout - added Sustainable Design guidance 4 18 Oct 2007 Added requirements for Facility Recognition Plaque 5 13 Apr 2009 Corrected instructions to access NAVFAC CADD Resources, Signature Procedures, CAD manual references, use of DrChecks, sustainable design standards, and minor
5、revisions of the geotechnical and structural sections. 6 5 May 2009 Added paragraph on Accessibility (2-3) 7 27 January 2010 Changed all references from UFC 3-300-10N “Structural Engineering“ to UFC 3-301-01 “Structural Engineering“; changed IBC 2003 to IBC 2006 8 17 February 2011 Throughout Updated
6、 metric policy, added dual language and code compliance requirements, minor revisions to geotechnical and design deliverable sections. _ This UFC supersedes Military Handbook 1006/1, dated 15 June 1995. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,
7、-UFC 1-300-09N 25 May 2005 Including Change 8, 17 February 2011 FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD-3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense
8、Agencies, and the DoD Field Activities in accordance with USD (AT UFGS 01 33 10.05 20, Design Submittal Procedures; and Section 01 45 00.05 20, Design and Construction Quality Control. o For Design-Build contracts: Part Three Project Program, Chapter 1, Project Description, and Chapter 2, Program Ob
9、jectives, and additional design requirements. Use the U. S. Green Building Councils LEED Green Building Rating System as a tool to apply sustainable development principles and as a metric to measure the sustainability achieved throughout the planning, design and construction processes. Projects that
10、 must meet this certification are described in5 ECB 2008-1 /5/. These projects must meet the LEED 5 Silver /5/ level; unless justifiable conditions exist that limit the pursuit and accomplishment of the LEED credits necessary for achieving the Certified level. The Government determines the minimum s
11、ustainable LEED goals and verification methods. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 1-300-09N 25 May 2005 Including Change 8, 17 February 2011 4 2-5 PHYSICAL SECURITY AND ANTITERRORISM. DoD Instruction 2000.16, DoD Antiterrorism (AT)
12、Standards and OPNAV Instruction 3300.53A, Navy Antiterrorism Program, establish the policy for Physical Security and Antiterrorism. Design inhabited buildings to meet the requirements of UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings; UFC 4-010-02, DoD Minimum Antiterrorism Standoff
13、 Distances for Buildings; and Combatant Commander Anti-terrorism/Force Protection construction standards. It is important to remember that the project documents provide only the minimum amount of information necessary for the installation of all elements required for force protection and must not co
14、ntain information on force protection methods, philosophy, or information on design threats, as this information is considered sensitive and for official use only. 2-5.1 DoD Minimum Antiterrorism Standards for Buildings. UFC 4-010-01 and UFC 4-010-02 (For Official Use Only FOUO) establish standards
15、that provide minimum levels of protection against terrorist attacks for the occupants of all DoD inhabited buildings. These UFC are intended to be used by security and antiterrorism personnel and design teams to identify the minimum requirements that must be incorporated into the design of all new c
16、onstruction and major renovations of inhabited DoD buildings. They also include recommendations that should be, but are not required to be incorporated into all such buildings. 2-5.2 Security Engineering Facilities Planning Manual. UFC 4-020-01, Security Engineering Facilities Planning Manuel, prese
17、nts processes for developing the design criteria necessary to incorporate security and antiterrorism into DoD facilities and for identifying the cost implications of applying those design criteria. The design criteria may be limited to the requirements of the minimum standards, or they may include o
18、ne of four issues as described below. Protection of assets other than those addressed in the minimum standards (people). Aggressor tactics that are not addressed in the minimum standards. Levels of protection beyond those required by the minimum standards. The cost implications for security and anti
19、terrorism are addressed as cost increases over conventional construction for common construction types. The changes in construction represented by those cost increases are tabulated for reference, but they represent only representative construction that will meet the requirements of the design crite
20、ria. The manual also addresses the tradeoffs between cost and risk. UFC 4-020-01 is intended to be used by planners as well as security and antiterrorism personnel with support from planning team members. 2-6 OWNERSHIP OF PROJECT DOCUMENTS. The clauses set forth in DFAR 252.227-7023, Drawings and Ot
21、her Data to Become Property of Government, DFAR 227.71, Rights in Technical Data, and DFAR 227.72 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-UFC 1-300-09N 25 May 2005 Including Change 8, 17 February 2011 5 Rights in Computer Software and Compute
22、r Software Documentation, apply to all project design documents. 2-7 REGISTRATION. Develop stateside project documents under the direction of a Registered Architect or a Professional Engineer currently licensed in accordance with FAR 52-236-25, Requirements for Registration of Designers. Develop for
23、eign project documents under the direction of a Registered Architect or a Professional Engineer currently licensed by a United States state, commonwealth, or territory, the District of Columbia, or by the foreign country in which the project is to be built. Each drawing shall only be signed, sealed,
24、 and dated by the Registered Architect or the Professional Engineer who is registered to practice in the particular field involved for work depicted on that drawing, serves as the Designer of Record for that work, and complies with requirements of FAR 52.236-26. Sign Record Documents in accordance w
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- UFC130009NCHANGE82011DESIGNPROCEDURESPDF