SANS 10120-5 LB-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LB B.pdf
《SANS 10120-5 LB-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LB B.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 LB-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LB B.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 5 Section LB-1983 Bedding (pipes) PART 5 : CONTRACT ADMINISTRATION SECTION LB CONTENTS C3 ause Page Number START OF COWTRUCTION 1 Genera
4、l 1 . IMMEDIATELY AFTER THE HANDING OVER OF THE SITE 1 Program and Method of Working 1 Compactibility Factor of Selected Granular Material 1 . Reinforced Bedding 1 DURING CONSTRUCTION 1 Methods of Construction 1 Selection of bedding . 1 Placing of materials in bedding 1 Compaction of bedding 1 . Pla
5、cing concrete for Class A bedding 1 Blanket 1 Bedding cradle for flexible pipes l Compacting equipment 1 Filling at pipe joints and testing 2 Administration . 2 Relating class of pipe to class of bedding . 2 Selective methods of excavation ordered 2 Measurement and payment for provision of bedding m
6、aterial 2 QUALITY CONTROL AND OTHER CONSIDERATIONS . 2 Notes on Construction Failures 2 First Revision March 1983 This section of the code supersedes SABS 0120 : Part 5 : Section LB-1980 Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU OF STANDARDS SABS 0120 : Part 5 Section LE-1983 edding (pipes
7、) SABS 1200 LB : BEDDING (PIPES) NOTE: The clause number(s) given at the beginning or after the heading of a clause is/are unless otherwise stated, the number(s) of the relevant clause(s) of SABS 1200 LB. START OF CONSTRUCTION GENERAL. For the purposes of this part of the code, contract administrati
8、on starts with instructions to the contractor to commence work as set out in subclause 4.1 of Section 0. IMMEDIATELY AFTER THE HANDING OVER OF THE SITE PROGRAM AND METHOD OF WORKING. The contractor and the engineer should discuss and agree upon the program and method of working to ensure that sample
9、s of all bedding materials are available for testing early enough to avoid delaying the works. COMPACTIBILITY FACTOR OF SELECTED GRANULAR MATERIAL (Clauses 6 and 7). The contractor should lodge samples of granular material with the engineer for his approval before bedding and pipelaying are started.
10、 He should ensure that stockpiles of granular material do not become contaminated during the construction period. REINFORCED BEDDING. (See Subclause 3.2.3 of Section LB of Part 2 of the Code.) Where a concrete bedding is to be reinforced, the engineer should ensure that a reinforcement schedule is h
11、anded to the contractor early enough to eliminate the risk of delaying construction due to late delivery of steel. DURTNG CONSTRUCTION METHODS OF CONSTRUCTION Selection of Bedding (Subclause 3.4). The contractor should not wastefully dispose of excavated material that complies with the requirements
12、of Subclauses 3.1 and 3.2 of SABS l200 LB and that may be used for bedding cradles or selected fill blankets. Placing of Materials in Bedding (Subclause 5.1.3). In placing bedding, special care should be taken to ensure that no stones of maximum dimension exceeding 30 mm are placed within 150 nm of
13、the barrel, that all voids under the overhang of the pipes are filled, and that compaction is carried out at OMC uniformly on each side of the pipe so as not to cause any lateral or vertical displacement of the pipe. Compaction of Bedding (Subclause 5.1.4). To achieve the compaction of 90 % of modif
14、ied AASHTO maximum density required for bedding in terms of Clause 5.1.4 of SABS 1200 LB, the following procedure should be adopted: a) Ensure that the pipe is firmly supported underneath and at the sides, and that the prisms of material adjacent to the pipe can prevent lateral movement of the pipe
15、and can transmit vertical loads without undue settlement. Light compaction only should be applied to the material directly over the pipe. b) Machine compaction should not be used directly above the pipe until sufficient cover has been placed to ensure that machine compaction loads transmitted to the
16、 top of the pipe are no greater than would be imposed by normal road traffic over a pipeline with l m cover. C) If sand is used as bedding material, compaction may be obtained by saturation with water provided that a poker vibrator is used to compact the sand. Pipes should be secured against displac
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205LB1983CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONLBBPDF

链接地址:http://www.mydoc123.com/p-1028611.html