SANS 10120-5 INTRO-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Introduct.pdf
《SANS 10120-5 INTRO-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Introduct.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 INTRO-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Introduct.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS Ol2O : Part 5 ntroduction . 1986 PART 5 : CONTRACT ADMINISTRATION INTRODUCTION Clause 1 . 2 . 2.1 2.2 2.2.1 2.2.2 3 . 4 . 4.1 4.2 4.3 4.3.1 4.3.2 4.
4、4 4.4.1 4.4.2 4.4.3 5 . 5.1 5.2 5.3 5.4 5.5 CONTENTS Page Number SCOPE . 1 DEFINITIONS AND INTERPRETATIONS 1 efinitions 1 Interpretations 1 Approval . 1 . Specification drawings 1 GENERAL 1 CONTENTS Ok SUCCEEDING SECTIONS OF PART 5 1 Start of Construction 1 . Immediately after the Handing Over of th
5、e Site 2 During Construction 2 . Construction methods 2 Administration . 2 . Quality Control and Other Considerations 2 Quality control Notes on construction failures . . Disputes. mediations. arbitrations and court cases ELEMENTS OF THE MAKE-UP OF CONTRACTORS TENDER PRICES General Contractors Consi
6、derations Procedure Process Analysis Sheet . Unit Rate Make-up List 3 Table 1 . Process Analysis 4 Table 2 . Unit Rate Make-up . 5 . Table 3 W Typical Calculations for Basic Rates 6 Second Revision March 1986 This section of Part 5 of the code supersedes SmS 0120 : Part 5 : Section 0-1381 . Approved
7、 by the COUNCIL OF THE SOUTll AFRICAN BUREAU OF STANDARDS SOUTH AFRICAN BUREAU OF STANDARDS CODE OF PRACTICE YOR USE WITH STANDARDIZED SPECIFICATIONS FOR CIVII, ENGINEERIIIG CONSTRUCTION AND CONTRACT DOCUMENTS PART 5 : CONTRACT AUMLNISTRATION INTRODUCTION SCOPE This part of the code covers recommend
8、ations and suggestions intended to assist the engineer and the contractor in executing work covered by the standardized specifications and to assist them to work in harmony by promoting understanding of each others prollems. IT IS NOT A CONTRACTUAL INSTRUCTION TO ANY ONC. This section of this part o
9、f the code covers the contents of the succeeding sections and, to assist the enqineer in his administrat.ive duties, it includes a discussion of methods used by colltractors in arriving at tender prices. NOTE a) Because standardized specifications are regarded as primarily performance specifications
10、, tlw succeeding sections in this part of the code draw at-tention to those clauses of the relevant speci- fication that may warrant the issuing of instructions by the contractor to his staft on site or by the engineer regarding the method or methods of construction that should be adopted in order t
11、o ensure that the completed work will comply with the specification. Such instructions are intended for the guidance of construction hands, new staff and staff in training. b) The number and title of the standardized specification covered by each succeeding section in this part of the code are given
12、 at the beginning of the applicable section, the sections being set out in alphabetical order, and the title of the applicable standardized specification is given m the top outer corner of each succeeding page of the section. C) The number(s) given in brackets at the beginning or after the heading o
13、f a clause or subclause in the succeeding sections is/are, unless otherwise stated, the number (S) of the relevant clause (S) or subclause(s) of the applicable specification. DEFINITIONS AND INTERPRETATIONS DEFINITIONS. For the purposes of this part of the code the definitions given in Part 1 and in
14、 the relevant standardized specifications shall apply. INTERPRETATIONS Approval. Note that rn vjew of the deiinition of terms such as “approved“ and “directed“ given in the standardized specifications (see for example SABS 1200 A), the qualifying phrase “by the Engineez“ is used with these terms onl
15、y when required to avoid misinterpretation. ecificatiotl Drawings. Note that reference is not made to the “latest issue“ of any specification drawinq as the drawuigs issued as part of the contract document are the drawings that will be used for interpretation of the intent of the contract in the eve
16、nt of a dispute. GENERAL In the succeeding sections of this part of the code recommendations are given regarding the data that must be provided by the engineer at a very early stage after the contract has been awarded in order that the contractor may plan and organize the project without hindrance d
17、ue to lack of such data. Suggestions are also given for the exercise of control ovpr the various aspects of construction, the simplification of construction and for the avoidance or minimizing of disputes. The clauses are so framed as to draw the attention of the engineer and the contractor to parti
18、cular actions required of them at particular stages during the construction in order to ensure compliance with the requirements of the relevant standardized specification and to minimize conflict. CONTENTS OF SUCCEEDING SECTIONS OF PART 5 START OF CONSTRUCTION. AS the design engineer will have dealt
19、 with the responsibilities that fall under the pre-tender considerations set out in Subclause 3.1 of the Introduction to Part 3 of the code, construction administration starts with instructions to the contractor to commence work. The instructionb include advice to the successful tenderer that he has
20、 been awarded the contract, the issuing of instructions for the submission, as and where applicable, of a surety bond and insurance policy (or copies), and advice on the arrangements, if any, for the signing of the agreement, the handing over of the site, the commencewnt of work and the first site m
21、eeting, and the exchange of names of site staff. Where the works are to be carried out departmentally (i.e. not by contract), most of the above requirements will fall away, but a first bite meeting should be held at which memhwrs of the design team should brief the construction team on the details o
22、f the project. After such a meeting the construction t-ean will be able tv plan their organization of the project. l) General. SABS 0120 : Part 5 Introduction - 1906 IMMEDIATELY AETER THE HANDING OVER OF TllE SITE. This subclause sets out the action to be taken by the engineer and the contractor imm
23、ediately after the award of the corktract and the handing over of the site. Attention is drawn to information and data, if any, that must be provided by the engineer to the contractor to ensure thdt the planning and oryaniziny of the works can, irom the start, proceed smoothly and without hindrance.
24、 Before the start of construction work, both the engineers representative on the site arid the contractors agent should mark their copies of the standardized and particular specifications that form part of the contract document to highlight the clauses that have been varied in any way by the project
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205INTRO1986CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONINTRODUCTPDF

链接地址:http://www.mydoc123.com/p-1028609.html