SANS 10120-3 F-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section F Piling《.pdf
《SANS 10120-3 F-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section F Piling《.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-3 F-1983 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section F Piling《.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. Clause 1 . 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.2 1.2.1 1.3 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.3.6 1.3.7 1.3.8 1.3.9 2 . 2.1 SABS 0120 : Part 3 Section F-1983 Pi l
4、ing PAN 3 : i;UIL)ANCE FOR TlCSIGN SECTION F CONTENTS Page Number IRE-TENDER CONSlDERATIONS . Investigations . Expenditure on i.nvestigations Tests on substra1.a . setting out resu1t.s oi tests on substrata . Special test piles (trial test piles) Administration Guarantee . . Document.ation Condition
5、s of tender Conditions of contract . Selection of speciIications . Project and particular specifications Scheduling . Detail sheets Piling conditions and guarantee considerations . Measurement and payment in respect of alternative piling . Testing and acceptance criteria . DESIGN REQUlREMENTS Design
6、 Code . . Loads Nominal load and test load Safe or allowable load Uncertain Obstructions . Permanent Steel Casings Settlement Self Compacting Concrete . Reinforcing Steel Aggressive and Artesian Water Conditions Prestressed. Timber. and Steel Piles APPLICABILITY OF OTHER CODES Safety Design Other Re
7、ferences . TEST PROCEDURES . General QUALITY CONTROL AND OTHER CONSIDERATIONS General . Disputes August 1983 Approved by the COUNCII . OF THE SOUTH AFRICAN BUREAU OF STANDARDS i SABS 1200 F : PILING SABS 0120 : Part 3 Section F-1983 Filing NOTE: The clause number(s) given at the beginning or after t
8、he heading of a clause is/are, unless otherwise stated, the numher(s) of the relevant clause(s) of SABS 1200 F. PRE-TENDER CONSIDERATIONS INVESTIGATlONS Expenditure on Investigations. Expenditure, before the tender is prepared, on thorough investigations into the nature of the strata through which a
9、nd in which piles are to be installed is a sound investment because, if both the designer and the contractor know that the information supplied is correct, they should be able to produce the most economic design which should lead to the lowest tender prices and result in the lowest cost to the emplo
10、yer. Tests on Substrata (Subclause 5.1.2). Ensure that the results of tests on substrata required to be given in the project specification are as comprehensive as it is practicable to make them, and that all available data on known obstacles are disclosed. (See also 2.8 below and Subclause l.l(c) of
11、 Section F of Part 2 and Subclause 3.2.2 of Section F of Part 5 of the code.) Setting Out Results of Tests on Substrata. Unless the data are so brief that they can be dealt with in Clause PS3 of the project specification or, if such data and the positions at which tests were carried out are not show
12、n on the drawings, ensure that the results 01 subsoil investigations that were carried out (see 1.3.l(a) below) are included in an annexure to the project specification. (See 1.3.5.1 below and also Subclause 4.1 of Section 0 of Part 2 and Subclause l.l(c) of Section F of Part 2 of the code.) Spxial
13、Test Piles (Trial Test Piles). Where, in order to obtain or confirm data, a special test pile is installed either before tenders are invited or before the main piling installation is commenced, determine the nominal load per pile in the manner described in 2.2.1 below. ADMINISTRATION Guarantee (Subc
14、lauses 7.8.1 and 7.8.2). Ensure that the employer understands the implications of the guarantee and liability clauses and determine whether he is agreeable to their forming part of the contract. (See also 1.3.7 below.) DOCUMENTATION Conditions of Tender. When preparing the conditions of tender a) dr
15、aw attention to Clause PS 3 of the project specification, to the annexure to the project specification, if any, and to the drawings on which the results of a subsoil investigation carried out on the site of the works are given, and state that the positions at which tests were carried out are shown o
16、n the drawings; b) state that the tenderer is to base his tender and any alternative design and priced schedule on the information referred to in (a) above; C) where applicable, add that additional site investigation by the tenderer during the tender period will be permitted should he wish to obtain
17、 additional information pertinent to his foundation design and that the cost of such additional investigation will be for the tenderers account, the information obtained being for his use exclusively; and d) where an alternative tender, design, type of pile, or layout is required or will be consider
18、ed, set out the requirements and draw attention to the requirement that the original schedule must be priced. (See Subclauses 5.1.3 and 0.1.2 of SABS 1200 F, and Subclause Z.l(h) of Section F of Part 2 of the code.) Conditions of Contract. Where the GCC) are not applicable to the contract, ensure th
19、at the applicable conditions of contract include a clause such as the following: to be materially different from those shown on the drawinas or aiven in the ;ender documents, the Contractor shkl notify the Engineer in writing of any intention to claim for additional payment on the grounds of additio
20、nal costs arising from the different subsoil conditions. Such notification shall be delivered to the Engineer within 14 d after the change in conditions has been so proved. (See also Subclause l.lfc) of Section F of Part 2, and Subclause 3.2.2.1(b) of Section F of Part 5 of the code. ) Selection of
21、Specifications General. SABS 1200 AH may be a more suitable general specification than either SABS 1200 A or SABS 1200 AA in the case of a “piling only“ contract. Earthworks. Unless the piling work forms a relatively minor part of a major civil engineering contract, neither SABS 1200 D nor SADS 1200
22、 DA need be included in the contract. Such clauses relating to earthworks as are required for the purposes of piling should be selected from SABS 1200 D and included in the project specification. 1) General conditions of contract for use in connection with works of civil engineering construction, pr
23、epared under the auspices of the SAICE, SAACE, and SAFCEC and recommended by these bodies for general use, and also endorsed for general use by the Civil Engineering Advisory Council. (See also Clause C-l(d1 of Annexure C of Part 1 of the code.) SABS 0120 : Part 3 Section F-1983 Filing Projec:t and
24、Particular Specifications a) Prtstressed piles. Where prestressed pile:; are required, compile a particular specification or include SARS 1200 F in the contract. and set out. suitable requirements in the project specification. b) Steel piles. Where steel piles arc required, set out, in a suitable pr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101203F1983CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART3GUIDANCEFORDESIGNSECTIONFPILINGPDF

链接地址:http://www.mydoc123.com/p-1028520.html