SANS 10120-3 D-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section D Earthwo.pdf
《SANS 10120-3 D-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section D Earthwo.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-3 D-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section D Earthwo.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 3 Section D-1982 Earthworks (As amended 1988) Clause 1 . 1.1 1.1.1 1.1.2 1.1.3 1 . 1 . 4 1.2 1.2.1 1.2.2 1.3 1.3.1 1.3.2 1.3.3 1.3.4 1.3
4、.5 1.3.6 1.3.7 1.3.8 1.3.9 2 . 2.1 2.1.1 2.1.2 2.2 3 . 4 . 4.1 5 . 5.1 5.2 5.2.1 5.2.2 5.2.3 PART 3 : GUIDANCE FOR DESIGN SECTION D CONTENTS PRE-TENDER CONSIDERATIONS Investigations . . Materials for foundations for structures Existing underground servi Existing servitudes or way Safeguarding . Admi
5、nistration . Rights of way and rights o Tenders Documentation es eaves . . . occupation . . . Servitudes. etc Standardized specifications and project specification Shoring and safeguarding . . Seepage into excavations Road traffic control and accommodation of traffic . Provision for dealing with pol
6、lution by stormwater Topsoil Transport Schedule . DESIGN REQUIREMENTS Precautions Barricades . Warning lights . Blasting Advice APPLICABILITY OF OTHER CODES . TEST PROCEDURES General . QUALITY CONTROL AND OTHER CONSIDERATIONS Lessons from Design Failures . Disputes . Method of classifying Safeguardi
7、ng . Other sources of disputes First Revision March 1982 Reprint 1988 Incorporating Amendment No . 1 : 8 June 1988 This section of the code supersedes SABS 0120 : Part 3 : Section D-1979 Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU OF STANDARDS Page Number ISBN 0-626-08062-2 SABS 0120 : Part
8、3 Section 0-1982 Earthworks Amendment No. 1 : 8 June 1988 SABS 1200 D : EARTHWORKS NOTE: The clause number(s) given at the beginning or after the heading of a clause is/are, unless otherwise stated, the number(s) of the relevant clause(s) of SABS 1200 D. PRE-TENDER CONSIDERATIONS INVESTIGATIONS Mate
9、rials for Foundations for Structures (Subclause 3.2.1). Note that SABS 1200 D does not necessarily provide for embankments suitable for use as foundations for structures. Where the construction of structures, or parts of structures, on fill cannot be avoided, test the materials available and design
10、the particular foun- dations and specify them fully from the bottom of fill upwards. Existing Underground Services (Subclause 5.1.2). Pay particular attention to investigating the positions of existing services where it is important that their exact location be known for the purpose of the construct
11、ion of the works or the relocation of other services, or both. (See also Subclause 1.3.4 of Section A.) Existing Servitudes or Wayleaves. Establish the boundaries of existing servitudes or wayleaves across or adjoining the area(s) to be affected-by the works. (See also 1.3.1 below.) Safeguarding. In
12、vestigate the stability of structures and services that may be affected adversely by the excavations for the works and, when appropriate, take action as described in Subclause 3.2.2 of Section D of Part 2 of the code. (See also 1.3.3 below.) Where damage may occur as a result of blasting, inspect vu
13、lnerable structures and, when appropriate, take action in terms of Subclause 3.2.3 of Section D of Part 2 of the code. ADMINISTRATION Rights of Way and Rights of Occupation. Ensure that all rights of way and of occu- pation have been secured before tenders are invited. Tenders. Ensure that before th
14、e start of construction, action has been taken in the matters set out in (a) and (b) of Subclause 3.1.2 of the Introduction. I DOCUMENTATION Servitudes, etc. Where and as applicable take action in terms of Subclause 1.3.1 of Section DB. Standardized Specifications and Project Specification SABS 1200
15、 Cl) (Subclause 2.1). Do not include SABS 1200 Cl) in the contract where site clearance is not required for the project, as may be the case when the project covers extensions to existing works or facilities. Project Specification. Frame project specification clauses to deal with the rele- vant matte
16、rs set out in Clauses 1, 2 and 3 of Section D of Part 2 of the code. Shoring and Safeguarding (Subclause 5.1.1.2) Priced items a) Ensuring the safety of his excavations is important to the contractor because a collapse will cause him considerable immediate administrative problems in that materials (
17、timber or pipes) may be damaged, his work will be disrupted, replacement of injured staff may be necessary, and a collapse may even lead to litigation. For these reasons there is justification for assuming that the contractors price for excavation covers the cost of shoring in those areas where he c
18、annot excavate in such a way as to make the maximum use of safe slopes (frequently the cheapest method). b) Note that in normal circumstances, the engineer should not instruct the contrac- tor (or any of his employees) whether to slope or to shore. 1)Site clearance. SABS 0120 : Part 3 Section D-1982
19、 Earthworks Amendment No. 1 : 8 June 1988 c) Note also that where a price for shoring has been tendered, the engineer cannot, except where he has designed the shoring, order the method of construction because he does not know details of the contractors design, what materials and equipment are availa
20、ble, or the level of competence of the contractors workmen. d) Subclause 8.3.7 of SABS 1200 D provides scope to obtain a price (or prices) from the contractor to cover such additional lateral support as is likely to be needed in particular areas or lengths of the excavations where problems may arise
21、. Such shoring will be designed by the contractor, and paid for as set out in Sub- clause 8.3.7(a). 1.3.3.2 Provisional items or sums a) For the reasons set out in Subclause 3.2.2.2 of Section D of Part 5 of the code, do not include in the schedule a provisional item to cover a situation in which, b
22、ecause the degree of lateral support provided by the contractor is thought to be unsatisfactory or because of a difference of opinion, additional lateral sup- port say be ordered at the expense of the employer in the interest of safety. b) Where it is considered that shoring may become necessary to
23、protect a particular structure or underground service but, at the tender stage, it is not possible to provide sufficient details for the contractor to price the shoring, provide in the schedule for a provisional sum to cover the cost of shoring and state in the pro- ject specification that the shori
24、ng work carried out under the relevant item will be paid for as set out in Subclause 8.3.7(b) of SABS 1200 D. c) Note that the design and detailing of the shoring referred to in (b) above may be carried out by the engineer or by the contractor or jointly by both at the discretion of the engineer. 1.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101203D1982CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART3GUIDANCEFORDESIGNSECTIONDEARTHWOPDF

链接地址:http://www.mydoc123.com/p-1028514.html