SANS 10120-3 A-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section A General.pdf
《SANS 10120-3 A-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section A General.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-3 A-1986 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section A General.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. LAIIT 3 : GUIDANCE FOf? 1111s 1 t ;l1 SECTION A CONTENTS Clause PRF+TF;tJL)LiH CONS IUI?.I?AIIONS . 1 1nvest.iq;lt.ions 1 . Protect:ion of structures J E
4、xisting underground services . 1 . Mministratiori l . Housirw for Blacks 3 Tendezs l Documentation 1 Essential PSA clauses when GCC not applicable l . Contract agreement % Contractors camp ? Existirg underyrourld services 2 . Combined fixed and time-related activities 2 . Prime costs. provisional su
5、ms. daywork and temporary works 3 Tests and samples 3 . Plant itcms to be designated 3 Fixed charye for all other obliyations 3 Provisional. sums and prime cost items 3 Temporary works 3 DESIGN REQUIREMENTS . 4 Tolerances . 4 General . . 4 Degrees of accuracy 4 . Considerations 4 Design to uvercome
6、practical problems 4 . APPLICARILlTY OF OTHER CODFS 4 TEST IHOCEIXRES 4 Control Tests . 4 QUNATY CCNTROL AND OTHEII CONSIDEIWTIONS . 5 Second Revision March 1W6 This section of the code supersedes Approved by the COIINCIL OF TliE SOUTfl AFIIICXN DUHEALI 01. STANUARUS SAHS 0120 : Part 3 section A- 98
7、6 Gfmeral SABS 1200 A : GEEIEMI. NOTE: The clause number(s) given at the beyinning or aftel the heading of a clause is/are, ulllcss otherwise stated, the numher(s) of the relevant clause(s) of SABS 1200 A. 1. PRr-TLNDER CONSIDERATIOPIS 3 .l INVESTIGATIONS 1.1.1 Protection of Structures (Subclause 5.
8、3). Where existinq structures, site boundaries, etc., arr endangered by the removal of lateral support, design protective measures to rcpJace natural lateral suppart and arrange for them to be executed and paid Tor under the contrat-1 3 .l .? -tiny Underground Services (Subc:lause 5.4) 1.1.2.1 Iacat
9、ing. Pay part-icular attention to investiqating t-he positions of exist.ing services wllero it- is import-ant that their exact location be known for the purpose of the construction of the works or the relocation of other services. Excavate sufficient trial holes, or use other means for locating sf!r
10、vices, in order to verify the correctness of the information supplied in the project specification reyarding thc position of important services or t.0 cst.ablish the position of existing important. services to ensure that the drawingsand the items scheduled are accurate. (See also 1.3.4 below.) 1.1.
11、2.2 Ownership and rlecisions cm prot.ection. Establish ownership atid ascertain f rom the authority owniny each service the importance of the various cables, pipes, etc., that have to be protected or relocated and at t.he same t.ime obtain a decision on whet.her they should he encased in concrete or
12、 placed in duc:ts, etc. 1.1.2.3 Effect of cnnstruction plant and conr1itions. In the case of contracts involving construction or reconstruction ot roacls, specify the niiriimum protection for important services within the road prism where the final or existing level of the services does not provide
13、sufficient cover to protect these services when construction plant is working over the top of them at subgrade level. 1.2 ADMINISTRATION 1.2.1 tlousing for Blacks a) Restrict.ions on housing for Blacks exist over a major portion of the Northcrn and Western Cape Province. Public tenders are open to a
14、ll contractors and contractors from other areas may underestjmaLe the delays. onstruction work in areas lying to the south of the Orange River and west of a line (the Eiselen Lint!) runninq east of Prieska, Britstowtl, Victoria West, Beaufort West, Prince Alhcrt, George and KnySna, is likely to be a
15、ffected. b) Ensure (see (6) below) that each contractor tendering for work in such areas is made avare of thesc. problems and is advised to provide in the appendix to his tender, under the heading “TIME FUR CO#FLETION“, adequate time to allow for delays in obtaining the necessary authority t.o emplo
16、y the type of labour he requires and to obtain or construct acceptable accomnmdation for the labourers. C) The start of the works will probably be delayed unless the requirements of the officials of the Department of Co-operation and Development responsible for the area in whlc11 the project is to b
17、e constructed are ascertainecl. d) Set the requirements out in the project specification, preferably i.n the form of a copy of a letter from the official concerned. (See also Subclause 3.2.1 (PSA 1) of Section A of Fart 2 of the codc.) 1.2.2 Tenders. Ensure that, before the start of construction, ac
18、tion has been taken on the matters set out in (a) and (b) of Subclause 3.1.2 of the Introduction. 1.3 DOCIIMENTATJON 1.3.1 Essential PSA Clauses when Gaction A-1986 General Prime Costs, Provisional Sums, Daywork and Temporary Works (Subclause 0.1.2.1). Subclause 8.1.2.1 of SABS l200 A makes provisio
19、n for the inclusion in the Prelimjnary and General Section oL the schedule of items to cover prime costs, provisional sums, daywork and temporary works because it is often convenient to group such isolated activit.ies in one portion of the document. Although this qroupiny may increase clerical work
20、sliqhtly whre the employer wishes to know the cost of each section of the work, and it removes some iiems from the sections of the schedule to which they are related, the grouping has been adopted in the British civil engineering standard method of measurement2) (CESMM) . The grouping has the merit
21、of minimiziny the risk of prime cost and provisional items bcing overlookcdby both the engineer ancl the contractor during the course of the contrart, resulting in specialized materials being ordered too late, or tenders from nominated subcontractors being called too late. Either of these oversights
22、 may lead to disruption of the contractors program. The inclusion of daywork items with estimated quantities has the advantage of ensuring that the employer budgets for the cost of expected daywork and that the contractor prices it realistically (his rates affect his tender sum). The execution of te
23、mporary works frequently necessitates considerable installation expenditure followed by continuing maintenance expenditure and finally t.he removal expenditure. These are typically preliminary and general cost structure activities. The grouping may be cumbersome when there are many prime cost or pro
24、visional sum items or when the forecasting of daywork is imyracticable or when temporary works are associated with one particular activity only or are so extensive as to warrant a separate sectior of the schedule. Tests and Samples (Subclauses 8.3.2, 8.4.2 and 8.4.5). The contractors rates cover the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101203A1986CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART3GUIDANCEFORDESIGNSECTIONAGENERALPDF

链接地址:http://www.mydoc123.com/p-1028509.html