SAE AS 13002-2015 Requirements for Developing and Qualifying Alternate Inspection Frequency Plans.pdf
《SAE AS 13002-2015 Requirements for Developing and Qualifying Alternate Inspection Frequency Plans.pdf》由会员分享,可在线阅读,更多相关《SAE AS 13002-2015 Requirements for Developing and Qualifying Alternate Inspection Frequency Plans.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、_ SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising there
2、from, is the sole responsibility of the user.” SAE reviews each technical report at least every five years at which time it may be revised, reaffirmed, stabilized, or cancelled. SAE invites your written comments and suggestions. Copyright 2015 SAE International All rights reserved. No part of this p
3、ublication may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of SAE. TO PLACE A DOCUMENT ORDER: Tel: 877-606-7323 (inside USA and Canada) Tel: +1 724-776-497
4、0 (outside USA) Fax: 724-776-0790 Email: CustomerServicesae.org SAE WEB ADDRESS: http:/www.sae.org SAE values your input. To provide feedback on this Technical Report, please visit http:/www.sae.org/technical/standards/AS13002 AEROSPACE STANDARD AS13002 Issued 2015-03 Requirements for Developing and
5、 Qualifying Alternate Inspection Frequency Plans RATIONALE Aero-engine companies currently have their own requirements for Inspection Frequency which are very similar. A single standard would be more efficient for suppliers. The following standard is a consolidation of these methods to allow for a s
6、ingular standard for Developing Inspection plans other than 100% inspection of all features. 1. SCOPE This document covers the process to be applied to design characteristics (as defined in AS9102), parts or inspection processes as defined by the purchaser. Design characteristics not included within
7、 the scope include electronic, electromechanical or mechanical systems where alternative means of acceptance are approved such as through acceptance test procedures (ATPs). This document does not define processes for identifying or communicating the classification of the parts or design characterist
8、ics. This document does not define the procedure to qualify a supplier to undertake these requirements. It is expected that each purchaser will have a procedure to manage the flow-down of these requirements. This document applies to suppliers that demonstrate adequate proficiency in applicable proce
9、ss control methods as determined by the purchaser. 1.1 Purpose The purpose of this document is to provide common requirements for developing and qualifying an alternate inspection frequency plan where characteristics are not inspected 100% of the time. 2. REFERENCE DOCUMENTS The following documents
10、provide useful guidance when implementing the requirements of this standard: 2.1 SAE Publications Available from SAE International, 400 Commonwealth Drive, Warrendale, PA 15096-0001, Tel: 877-606-7323 (inside USA and Canada) or 724-776-4970 (outside USA), www.sae.org. AS9100 Quality Management Syste
11、ms - Requirements for Aviation, Space and Defense Organizations AS9102 Aerospace First Article Inspection Requirement AS9103 Aerospace Series - Quality Management Systems - Variation Management of Key Characteristics AS13000 Problem Solving Requirements for Suppliers AS13003 Requirements for MSA the
12、 act of minimizing variation of a process PROCESS CHARACTERISTIC: The specific process inputs that have an effect on design characteristics. PROCESS MONITORING: Measuring and recording process inputs and/or outputs against process operating limits to verify that process stability has not significant
13、ly changed. PURCHASER: The customer issuing the purchase order for the part subject to the alternate inspection frequency plan. REDUCED INSPECTION: A type of alternate frequency inspection plan where less than 100% inspection of selected characteristics within a group of characteristics on a single
14、part, however, all parts are inspected. The group of characteristics are created by the same process and the conformity of un-inspected characteristics within the group is inferred by the inspected characteristics within the same group. SAMPLE INSPECTION: A type of alternate frequency inspection pla
15、n. The inspection of selected characteristics on sampled parts from which the conformity of the same characteristics on other parts is inferred. SPECIFICATION LIMITS: The acceptable limits which a design characteristic can vary within (e.g., the tolerance on a drawing/print). SUPPLIER: The organizat
16、ion/vendor receiving the purchase order and responsible for the manufacture and inspection of the part(s) subject to these requirements. 3. TRAINING 3.1 Suppliers applying these requirements are assumed to be competent in quality management methods and statistical techniques such as Statistical Proc
17、ess Control and Measurement Systems Analysis. 3.2 The supplier shall determine and document specific training requirements relevant to their organization appropriate to operate this process. Minimum elements of this training are subject to purchaser approval. 4. OVERVIEW OF INSPECTION FREQUENCY REQU
18、IREMENTS This standard defines the requirements to implement an alternate inspection frequency plan. The steps to implement these requirements are as follows: SAE INTERNATIONAL AS13002 Page 5 of 21 Figure 1 - Process flow Start, The launch point at which a number of pre-requisites are expected to be
19、 in place. Typically the supplier will enter into a discussion with the purchaser at this stage to agree to a broad approach. Define Characteristics and Controls, The supplier determines the characteristics within scope of the alternate inspection frequency plan and the appropriate control types. Pr
20、epare Data Pack, The activity a supplier undertakes to gather the data to substantiate the proposed alternate inspection frequency plan. Purchaser Evaluation and Approval, The evaluation by the purchaser of the proposed alternate inspection frequency plan and its subsequent approval or rejection. Ex
21、ecute Plan and Monitor, Once a plan is approved the supplier will begin to operate the plan and monitor as required. Reaction Plan, Following identification of an issue a reaction plan shall be enacted to contain the issue and return to the alternate inspection frequency plan. 5. INSPECTION FREQUENC
22、Y PROCESS 5.1 Prerequisites 5.1.1 The supplier shall have a documented process within its own quality system to control inspection which meets the requirements set forth by the purchaser. The process shall be fully implemented and subject to audit by the supplier and the purchaser. 5.1.2 The documen
23、ted inspection frequency process shall describe the training requirements for practitioners. 5.1.3 A full first article inspection for the part(s) shall be in place in accordance with the purchaser requirements. Prepare Data PackPurchaser Evaluation alternatively other forms (electronic or paper) ma
24、y be utilized provided they meet the same intent and are agreed between the supplier and purchaser. SAE INTERNATIONAL AS13002 Page 9 of 21 http:/www.sae.org/servlets/works/committeeHome.do?comtID=TEAG22 PlanType:DC no.DC NameProcessIDOperationno.DateNumberofpartsmeasuredStableY/NPpPpkTypeControlcard
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEAS130022015REQUIREMENTSFORDEVELOPINGANDQUALIFYINGALTERNATEINSPECTIONFREQUENCYPLANSPDF

链接地址:http://www.mydoc123.com/p-1023460.html