REG UFGS-26 28 21 00 40-2011 AUTOMATIC TRANSFER SWITCHES.pdf
《REG UFGS-26 28 21 00 40-2011 AUTOMATIC TRANSFER SWITCHES.pdf》由会员分享,可在线阅读,更多相关《REG UFGS-26 28 21 00 40-2011 AUTOMATIC TRANSFER SWITCHES.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-26 28 21.00 40 (August 2011)-Preparing Activity: NASA SupersedingUFGS-26 28 21.00 40 (August 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION TABLE OF CONTENTSDIVISION 26 - ELECTRICALSECTION 26 28 21.00
2、40AUTOMATIC TRANSFER SWITCHES08/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 PREDICTIVE TESTING AND INSPECTION TECHNOLOGY REQUIREMENTS1.4 QUALIFICATION TESTINGPART 2 PRODUCTS2.1 SYSTEM DESCRIPTION2.1.1 Design Requirements2.1.2 Performance Requirements2.2 FABRICATION2.2.1 Short Circuit Withstand C
3、urrent Rating2.2.2 Self-Test Capability2.2.3 Enclosures2.3 COMPONENTS2.3.1 Contacts2.3.2 Indicating Lights2.3.3 Terminal Board2.4 OPERATION2.5 ACCESSORIESPART 3 EXECUTION3.1 INSTALLATION3.2 FIELD TESTING- End of Section Table of Contents -SECTION 26 28 21.00 40 Page 1Provided by IHSNot for ResaleNo
4、reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-26 28 21.00 40 (August 2011)-Preparing Activity: NASA SupersedingUFGS-26 28 21.00 40 (August 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SEC
5、TION 26 28 21.00 40AUTOMATIC TRANSFER SWITCHES08/11*NOTE: This guide specification covers the requirements for automatic transfer switches for use with engine-generator sets for standby power.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guid
6、e specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required i
7、n respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: If Section 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS is not in
8、cluded in the project specification, applicable requirements therefrom should be inserted and the following paragraph deleted.*Section 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS applies to work specified in this section.1.1 REFERENCES*NOTE: This paragraph is used to list the publications
9、cited in the text of the guide specification. The publications are referred to in SECTION 26 28 21.00 40 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the text by basic designation only and listed in this paragraph by organization, designatio
10、n, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the
11、 text are automatically deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic
12、 designation only.NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA)RCBEA GUIDE (2004) NASA Reliability Centered Building and Equipment Acceptance GuideNATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA 250 (2008) Enclosures for Electrical Equipment (1000 Volts Maximum)NEMA ICS 1 (2000; R 20
13、05; R 2008) Standard for Industrial Control and Systems: General RequirementsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 70 (2011; TIA 11-1; Errata 2011) National Electrical CodeUNDERWRITERS LABORATORIES (UL)UL 1008 (2011) Transfer Switch EquipmentUL 508 (1999; Reprint Apr 2010) Industrial Contr
14、ol Equipment1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Keep submittals to the minimum required for adequate quality control.A “G” following a submitta
15、l item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only SECTION 26 28 21.00 40 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-delete an existing “G” if the submittal item is not com
16、plex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be use
17、d following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resid
18、ent Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals
19、with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Se
20、ction 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsConnection Diagrams; G; G, _Fabrication Drawings; G; G, _Installation Drawings; G; G, _SD-03 Product DataEquipment and Performance Data; G; G, _Contacts; G; G, _Indicating Lights; G; G, _Terminal Board; G; G, _Enclosures; G; G, _Accessories; G;
21、G, _SD-06 Test ReportsQualification Testing; G; G, _Operation Tests; G; G, _SECTION 26 28 21.00 40 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-SD-07 CertificatesListing of Product Installations; G; G, _SD-08 Manufacturers InstructionsAutoma
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGUFGS26282100402011AUTOMATICTRANSFERSWITCHESPDF

链接地址:http://www.mydoc123.com/p-1019658.html