1、Public Lessons Learned Entry: 4456 Lesson Info: Lesson Number: 4456 Lesson Date: 2010-06-18 Submitting Organization: KSC Submitted by: Annette Pitt Subject: Ice Detection Camera (IDC) Close Call Abstract: Ground support equipment, facilities, and shop aids all have defined NASA design requirements a
2、nd processes. All hardware, whether Commercial Off The Shelf (COTS) or prototype, used in proximity of a space vehicle require the performance of all design, operation, and training verification procedures. Description of Driving Event: On February 26, 2010, at 2330 hours, on Complex 39 A Mobile Lau
3、nch Platform 0 level, the STS-130 Final Inspection Team (FIT) began their T3-hour walk down. The operator, a NASA FIT engineer, started to configure, pressurize, and power up the MacDonald, Detwiller, and Associates (MDA) Prototype Ice Detection Camera (IDC). Provided by IHSNot for ResaleNo reproduc
4、tion or networking permitted without license from IHS-,-,-Figure 1: OThe operatstage reguadjusting tverall IDC Conor reported thalator gauge valvhe IDC rapid-exfiguration t the initial GN2e and observechange valve asupply cylinded a pressure innd completing r pressure readcrease to 10 psthe power-up
5、 seing was 2,900 pi (the nominal oquence, he obsi. He then turnperational presserved an immeed the IDC sinsure setting). Adiate loss of gle-fter Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-system prepower, cloWhen he rsecured thand pneumcorner, w
6、hgauge but as a “loud Figure 2: SLesson(s)The IDC wVolume X;1. Tssure, with thesed the GN2 sueturned, he moe spare GN2 boatic connectionere he connectdid not touch owhine and a poudden PressurLearned: as not designedSW-E-0002; Khe IDC purge cGN2 supply cypply cylinder vaved the IDC outttle. But beca
7、us. Upon arrivaled the GN2 gasr adjust it. He op.” The panel ge Change Shator fabricated iSC-STD-E-0002omponents welinder and presslve, and proceeside the west ese the FIT was at the 255 levebottle. While mpened the GN2lass had shattetered Display Pn accordance wE; and KSC-Ere not designedure regula
8、tor rded to the padlevator at the Fpreparing to mol, the operator aking the connsupply cylinderred (see figure anel ith the following-165E. to prevent oveeading 0 psi. Hesurface to retriixed Surface Stve to the 255 rolled the IDC fection, he lookevalve slightly a2). NASA designrpressurization,then t
9、urned ofeve a spare GNructure (FSS) 9level, he did norom the elevatod at the single-nd then heard wrequirements: which caused f the electrical 2 cylinder. 5 level and t complete the gr to the southwstage regulatorhat he describNSTS 07700, system failure. as est ed Provided by IHSNot for ResaleNo rep
10、roduction or networking permitted without license from IHS-,-,-2. Instead of a Bepco enclosure pressure control valve, a Bepco control panel rapid-exchange valve was used to control GN2 system purge. This allowed the rapid release of overpressure, which in turn caused the system to fail. 3. The IDC
11、single-stage regulator was found to have vibrated open, causing the inlet pressure to increase (creep) to 50 psi. The nominal operational pressure setting is 10 psi. This increase in the inlet pressure setting allowed the system to become overpressurized and caused the system to fail. 4. The IDC cam
12、era head enclosure lid was not sealed properly because of ground wire interference, which caused a differential in system pressure between enclosures. 5. The bottom clip on the IDC camera battery, power supply, and power supply enclosure were seated but did not catch the enclosure door, which contri
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS44562011LESSONSLEARNEDICEDETECTIONCAMERAIDCCLOSECALLPDF

链接地址:http://www.mydoc123.com/p-1019451.html