欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-4456-2011 Lessons Learned Ice Detection Camera (IDC) Close Call.pdf

    • 资源ID:1019451       资源大小:4.64MB        全文页数:5页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-4456-2011 Lessons Learned Ice Detection Camera (IDC) Close Call.pdf

    1、Public Lessons Learned Entry: 4456 Lesson Info: Lesson Number: 4456 Lesson Date: 2010-06-18 Submitting Organization: KSC Submitted by: Annette Pitt Subject: Ice Detection Camera (IDC) Close Call Abstract: Ground support equipment, facilities, and shop aids all have defined NASA design requirements a

    2、nd processes. All hardware, whether Commercial Off The Shelf (COTS) or prototype, used in proximity of a space vehicle require the performance of all design, operation, and training verification procedures. Description of Driving Event: On February 26, 2010, at 2330 hours, on Complex 39 A Mobile Lau

    3、nch Platform 0 level, the STS-130 Final Inspection Team (FIT) began their T3-hour walk down. The operator, a NASA FIT engineer, started to configure, pressurize, and power up the MacDonald, Detwiller, and Associates (MDA) Prototype Ice Detection Camera (IDC). Provided by IHSNot for ResaleNo reproduc

    4、tion or networking permitted without license from IHS-,-,-Figure 1: OThe operatstage reguadjusting tverall IDC Conor reported thalator gauge valvhe IDC rapid-exfiguration t the initial GN2e and observechange valve asupply cylinded a pressure innd completing r pressure readcrease to 10 psthe power-up

    5、 seing was 2,900 pi (the nominal oquence, he obsi. He then turnperational presserved an immeed the IDC sinsure setting). Adiate loss of gle-fter Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-system prepower, cloWhen he rsecured thand pneumcorner, w

    6、hgauge but as a “loud Figure 2: SLesson(s)The IDC wVolume X;1. Tssure, with thesed the GN2 sueturned, he moe spare GN2 boatic connectionere he connectdid not touch owhine and a poudden PressurLearned: as not designedSW-E-0002; Khe IDC purge cGN2 supply cypply cylinder vaved the IDC outttle. But beca

    7、us. Upon arrivaled the GN2 gasr adjust it. He op.” The panel ge Change Shator fabricated iSC-STD-E-0002omponents welinder and presslve, and proceeside the west ese the FIT was at the 255 levebottle. While mpened the GN2lass had shattetered Display Pn accordance wE; and KSC-Ere not designedure regula

    8、tor rded to the padlevator at the Fpreparing to mol, the operator aking the connsupply cylinderred (see figure anel ith the following-165E. to prevent oveeading 0 psi. Hesurface to retriixed Surface Stve to the 255 rolled the IDC fection, he lookevalve slightly a2). NASA designrpressurization,then t

    9、urned ofeve a spare GNructure (FSS) 9level, he did norom the elevatod at the single-nd then heard wrequirements: which caused f the electrical 2 cylinder. 5 level and t complete the gr to the southwstage regulatorhat he describNSTS 07700, system failure. as est ed Provided by IHSNot for ResaleNo rep

    10、roduction or networking permitted without license from IHS-,-,-2. Instead of a Bepco enclosure pressure control valve, a Bepco control panel rapid-exchange valve was used to control GN2 system purge. This allowed the rapid release of overpressure, which in turn caused the system to fail. 3. The IDC

    11、single-stage regulator was found to have vibrated open, causing the inlet pressure to increase (creep) to 50 psi. The nominal operational pressure setting is 10 psi. This increase in the inlet pressure setting allowed the system to become overpressurized and caused the system to fail. 4. The IDC cam

    12、era head enclosure lid was not sealed properly because of ground wire interference, which caused a differential in system pressure between enclosures. 5. The bottom clip on the IDC camera battery, power supply, and power supply enclosure were seated but did not catch the enclosure door, which contri

    13、buted to system purge leakage. 6. NASA lab personnel completed measurement testing before the ICD was put into operational use. However, purge system operation and functional checkout were not performed, which prevented detection of system overpressurization before operational use. 7. The current op

    14、erational procedure, MDA Prototype Ice Detection Camera User Manual Rev 4.0, was not followed. Use of that operational procedure might have prevented the system overpressurization. A new local procedure for field use will be developed containing all operational steps, notes, cautions, and warnings.

    15、The procedure will include a section requiring that such equipment undergo purge and functional checkout in a NASA lab before use in the field. All operators will be trained on the use of the new procedure and the IDC. 8. At the time of this close call, KSC did not have a process to certify prototyp

    16、e equipment used on the Center. Recommendation(s): 1. Valves that do not perform a NASA-required valve function should be physically disabled. 2. Valves that do not perform a NASA-required valve function should not be incorporated into larger designs and should not be included in procurement specifi

    17、cations. 3. KSC project teams should review procurement specifications for prototypes more closely to ensure that KSC requirements, including those for hazardproofing and electrical design, are part of the procurement specification. 4. Engineering Review Boards reviewing requests to use prototypes s

    18、hould assign a single, dedicated point of contact to be responsible for verifying the prototypes compliance with design requirements (mechanical, electrical, pneumatic, reliability, etc.) for use at KSC and to request any warranted waivers. 5. A formal approved procedure should be in place for the o

    19、peration of a prototype after design verification. 6. An approved user training course should be in place for prototype operation procedures after design verification. 7. All hardware, whether COTS or prototype, used in proximity of a space vehicle requires the performance of all design, operation,

    20、and training verification procedures. Evidence of Recurrence Control Effectiveness: N/A Documents Related to Lesson: NASA Design Requirements NSTS 07700 Volume 10, Flight and Ground System Specification SW-E-0002, Ground Support Equipment General Design Requirements KSC-STD-E-0002E, Hazardproofing o

    21、f Electrically Energized Equipment, Standard for KSC-E-165E, Electrical Ground Support Equipment Fabrication, Specification for KDP-P-2761, Engineering Directorate: Boards, Panels, and Reviews: Structure and Process Document KDP-P-1533, Prototype Development Laboratory Process Mission Directorate(s)

    22、: Exploration Systems Additional Key Phrase(s): 1.Configuration Change Control 1.Ground support systems 1.Ground processing and manifesting 1.Launch Systems 1.Mishap Reporting 1.Program and Project Management Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I

    23、HS-,-,- 1.Research & Development 1.Reliability 1.Acquisition / procurement strategy and planning 1.Business processes 1.Cross Agency coordination 1.Configuration control and data management 1.DDT/E 1.Early requirements and standards definition 1.Engineering design and project processes and standards

    24、 1.Ground Operations 1.Ground Equipment 1.Configuration Management 1.Review systems and boards 1.Launch Process 1.Review boards Additional Info: Project: Space Shuttle Program Approval Info: Approval Date: 2011-01-26 Approval Name: mbell Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-4456-2011 Lessons Learned Ice Detection Camera (IDC) Close Call.pdf)为本站会员(sofeeling205)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开