1、Public Lessons Learned Entry: 2796 Lesson Info: Lesson Number: 2796 Lesson Date: 2010-05-7 Submitting Organization: KSC Submitted by: Annette Pitt Subject: System or Set Configuration Verifications Prior to Operations Abstract: Configuration procedures for Launch Processing System (LPS) systems were
2、 not specifically designed to verify that all systems and end items are ready to support Operations. Over time many off-line checkouts and confidence tests have been developed for LPS systems that test interfaces, verify hardware and software readiness, and establish baseline states. Many of these t
3、ests are specifically designed for particular support activities. These procedures provide greater assurance that the LPS configuration will satisfactorily support scheduled testing. Description of Driving Event: In several instances it was determined that disruptions and downtime could have been av
4、oided by performing off-line systems testing prior to scheduled support activities. These events have led to formal procedures that are now scheduled and executed regularly - some daily and others for specific operations throughout a flow. Lesson(s) Learned: For systems that support activities that
5、are critical to safety and schedule, support impact is not tolerable. Procedures and methods that can ensure the proper configuration of these support systems before testing begins are therefore extremely valuable. While these procedures do require planning and time allotted for their execution, the
6、se expenditures are trivial when compared to the impact of delays in integrated testing. Usually these types of procedures have been developed in response to an unforeseen event, but proactive system examination and analysis can also identify the need for specific verifications that can prevent thes
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS27962010LESSONSLEARNEDSYSTEMORSETCONFIGURATIONVERIFICATIONSPRIORTOOPERATIONSPDF

链接地址:http://www.mydoc123.com/p-1019387.html