欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-2796-2010 Lessons Learned System or Set Configuration Verifications Prior to Operations.pdf

    • 资源ID:1019387       资源大小:21.72KB        全文页数:2页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-2796-2010 Lessons Learned System or Set Configuration Verifications Prior to Operations.pdf

    1、Public Lessons Learned Entry: 2796 Lesson Info: Lesson Number: 2796 Lesson Date: 2010-05-7 Submitting Organization: KSC Submitted by: Annette Pitt Subject: System or Set Configuration Verifications Prior to Operations Abstract: Configuration procedures for Launch Processing System (LPS) systems were

    2、 not specifically designed to verify that all systems and end items are ready to support Operations. Over time many off-line checkouts and confidence tests have been developed for LPS systems that test interfaces, verify hardware and software readiness, and establish baseline states. Many of these t

    3、ests are specifically designed for particular support activities. These procedures provide greater assurance that the LPS configuration will satisfactorily support scheduled testing. Description of Driving Event: In several instances it was determined that disruptions and downtime could have been av

    4、oided by performing off-line systems testing prior to scheduled support activities. These events have led to formal procedures that are now scheduled and executed regularly - some daily and others for specific operations throughout a flow. Lesson(s) Learned: For systems that support activities that

    5、are critical to safety and schedule, support impact is not tolerable. Procedures and methods that can ensure the proper configuration of these support systems before testing begins are therefore extremely valuable. While these procedures do require planning and time allotted for their execution, the

    6、se expenditures are trivial when compared to the impact of delays in integrated testing. Usually these types of procedures have been developed in response to an unforeseen event, but proactive system examination and analysis can also identify the need for specific verifications that can prevent thes

    7、e situations before they occur. Examples of current LPS confidence tests include: 1. LPS Line Validations End-to-end circuit continuity tests and level checks performed each time the Firing Room to test site configuration is changed. 2. LPS Vehicle Safing Check-out Performed prior to initial vehicle

    8、 testing at the pad, this tests the vehicle safing interfaces and software against a math model. 3. Verification of software configuration has been incorporated as a setup step in many operational procedures. 4. Checklists performed every shift re-verify the configuration of LPS hardware and softwar

    9、e. Recommendation(s): When designing systems that will support critical testing, the development of verification procedures that ensure operability in every mode should be included in the design plan. As a system is developed and tested, any configuration problems encountered should be documented, a

    10、nd procedures should be developed that preclude recurrence. It may also be possible to “design out” undesirable configurations. Evidence of Recurrence Control Effectiveness: N/A Documents Related to Lesson: Click here to download Line Validations Work Order Click here to download Safing Checks Work

    11、Order Click here to download Shift Change Checklist Mission Directorate(s): Exploration Systems Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- Space Operations Additional Key Phrase(s): 1.Software 1.Ground Operations 1.Configuration control and dat

    12、a management 1.Engineering design and project processes and standards 1.Launch Systems 1.Ground support systems 1.Configuration Management 1.Computers 1.Launch support systems 1.Information Technology/Systems 1.Hardware Additional Info: Project: Space Shuttle Program Approval Info: Approval Date: 2010-07-07 Approval Name: mbell Approval Organization: HQ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-2796-2010 Lessons Learned System or Set Configuration Verifications Prior to Operations.pdf)为本站会员(刘芸)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开